METHOD OF INSTALLATION CONSTRUCTION AND REMOVAL CONSTRUCTION OF ELEVATED ROAD

PROBLEM TO BE SOLVED: To reduce fieldworks. SOLUTION: A carriage 20, on which a unit 14 for a road is placed, is made to travel on an upper-layer side road 17a under a built state, and the unit 14 for the road is projected from the upper-layer side road 17a. One end side of the unit 14 for the road...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: MIYAZONO SHOJI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MIYAZONO SHOJI
description PROBLEM TO BE SOLVED: To reduce fieldworks. SOLUTION: A carriage 20, on which a unit 14 for a road is placed, is made to travel on an upper-layer side road 17a under a built state, and the unit 14 for the road is projected from the upper-layer side road 17a. One end side of the unit 14 for the road is placed on the lifting-lowering section 28 of a carriage 25 on a lower-layer side road 12, and the unit 14 for the road is further projected by making the carriage 25 travel and laterally moving the unit 14 by a lateral moving section 23. The other end side of the unit 14 for the road is put on the lifting-lowering section 28 of a carriage 26 on the lower-layer side road 12, the carriages 25, 26 are made to travel, and the unit for the road is lowered by bringing down the lifting-lowering sections 28 of the carriages 25, 26, and arranged between bearing sections 15.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH0953207A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH0953207A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH0953207A3</originalsourceid><addsrcrecordid>eNrjZPD1dQ3x8HdR8HdT8PQLDnH08XEM8fT3U3D2B_KCQp3BHEc_F4UgV1__MEcfVAmgLlcf1zDHEFegAn9HFx4G1rTEnOJUXijNzaDg5hri7KGbWpAfn1pckJicmpdaEu8V4GFgaWpsZGDuaEyEEgC9-i5U</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF INSTALLATION CONSTRUCTION AND REMOVAL CONSTRUCTION OF ELEVATED ROAD</title><source>esp@cenet</source><creator>MIYAZONO SHOJI</creator><creatorcontrib>MIYAZONO SHOJI</creatorcontrib><description>PROBLEM TO BE SOLVED: To reduce fieldworks. SOLUTION: A carriage 20, on which a unit 14 for a road is placed, is made to travel on an upper-layer side road 17a under a built state, and the unit 14 for the road is projected from the upper-layer side road 17a. One end side of the unit 14 for the road is placed on the lifting-lowering section 28 of a carriage 25 on a lower-layer side road 12, and the unit 14 for the road is further projected by making the carriage 25 travel and laterally moving the unit 14 by a lateral moving section 23. The other end side of the unit 14 for the road is put on the lifting-lowering section 28 of a carriage 26 on the lower-layer side road 12, the carriages 25, 26 are made to travel, and the unit for the road is lowered by bringing down the lifting-lowering sections 28 of the carriages 25, 26, and arranged between bearing sections 15.</description><edition>6</edition><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>1997</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19970225&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0953207A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19970225&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0953207A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MIYAZONO SHOJI</creatorcontrib><title>METHOD OF INSTALLATION CONSTRUCTION AND REMOVAL CONSTRUCTION OF ELEVATED ROAD</title><description>PROBLEM TO BE SOLVED: To reduce fieldworks. SOLUTION: A carriage 20, on which a unit 14 for a road is placed, is made to travel on an upper-layer side road 17a under a built state, and the unit 14 for the road is projected from the upper-layer side road 17a. One end side of the unit 14 for the road is placed on the lifting-lowering section 28 of a carriage 25 on a lower-layer side road 12, and the unit 14 for the road is further projected by making the carriage 25 travel and laterally moving the unit 14 by a lateral moving section 23. The other end side of the unit 14 for the road is put on the lifting-lowering section 28 of a carriage 26 on the lower-layer side road 12, the carriages 25, 26 are made to travel, and the unit for the road is lowered by bringing down the lifting-lowering sections 28 of the carriages 25, 26, and arranged between bearing sections 15.</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1997</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPD1dQ3x8HdR8HdT8PQLDnH08XEM8fT3U3D2B_KCQp3BHEc_F4UgV1__MEcfVAmgLlcf1zDHEFegAn9HFx4G1rTEnOJUXijNzaDg5hri7KGbWpAfn1pckJicmpdaEu8V4GFgaWpsZGDuaEyEEgC9-i5U</recordid><startdate>19970225</startdate><enddate>19970225</enddate><creator>MIYAZONO SHOJI</creator><scope>EVB</scope></search><sort><creationdate>19970225</creationdate><title>METHOD OF INSTALLATION CONSTRUCTION AND REMOVAL CONSTRUCTION OF ELEVATED ROAD</title><author>MIYAZONO SHOJI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH0953207A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1997</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>MIYAZONO SHOJI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MIYAZONO SHOJI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF INSTALLATION CONSTRUCTION AND REMOVAL CONSTRUCTION OF ELEVATED ROAD</title><date>1997-02-25</date><risdate>1997</risdate><abstract>PROBLEM TO BE SOLVED: To reduce fieldworks. SOLUTION: A carriage 20, on which a unit 14 for a road is placed, is made to travel on an upper-layer side road 17a under a built state, and the unit 14 for the road is projected from the upper-layer side road 17a. One end side of the unit 14 for the road is placed on the lifting-lowering section 28 of a carriage 25 on a lower-layer side road 12, and the unit 14 for the road is further projected by making the carriage 25 travel and laterally moving the unit 14 by a lateral moving section 23. The other end side of the unit 14 for the road is put on the lifting-lowering section 28 of a carriage 26 on the lower-layer side road 12, the carriages 25, 26 are made to travel, and the unit for the road is lowered by bringing down the lifting-lowering sections 28 of the carriages 25, 26, and arranged between bearing sections 15.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH0953207A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title METHOD OF INSTALLATION CONSTRUCTION AND REMOVAL CONSTRUCTION OF ELEVATED ROAD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-21T10%3A43%3A03IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MIYAZONO%20SHOJI&rft.date=1997-02-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH0953207A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true