EARTHQUAKE-PROOF REINFORCING SYSTEM

PROBLEM TO BE SOLVED: To maintain a stable condition of a structure by controlling an upper jack arranged between a lower receive beam which is slidably provided for a pile and the structure and a lower jack arranged between an additional beam and the lower receive beam. SOLUTION: For example, when...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: IWAMOTO FUMIO, YUGUCHI MASAKI, ITAMI NOBUCHIKA, NIRENO KATSUYA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator IWAMOTO FUMIO
YUGUCHI MASAKI
ITAMI NOBUCHIKA
NIRENO KATSUYA
description PROBLEM TO BE SOLVED: To maintain a stable condition of a structure by controlling an upper jack arranged between a lower receive beam which is slidably provided for a pile and the structure and a lower jack arranged between an additional beam and the lower receive beam. SOLUTION: For example, when a new structure is built below an existing building 11, a lower receive beam 21 is constructed below the existing building 11 to hold it by a lower receive pile 22, and the lower receive beam 21 and a foundation pile 13 are arranged slidably. An upper jack 41 is arranged above the lower receive beam 21 to support the existing building 11. An additional beam 23 is provided on the foundation pile 13 which is lower than the lower receive beam 21, and a lower jack 42 is arranged between the additional beam 23 and the lower receive beam 21. The posture of the existing building 11 is kept by the upper jack 41 and the lower jack 42. It is desirable that inclination of the existing building 11 is measured by a displacement gage 51, that stroke of the jacks is measured by a jack stroke gage 52, and that the jacks 41, 42 are controlled to keep the posture of the existing building 11.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH09328760A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH09328760A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH09328760A3</originalsourceid><addsrcrecordid>eNrjZFB2dQwK8QgMdfR21Q0I8vd3Uwhy9fRz8w9y9vRzVwiODA5x9eVhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfFeAR4GlsZGFuZmBo7GxKgBAIHaI0s</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>EARTHQUAKE-PROOF REINFORCING SYSTEM</title><source>esp@cenet</source><creator>IWAMOTO FUMIO ; YUGUCHI MASAKI ; ITAMI NOBUCHIKA ; NIRENO KATSUYA</creator><creatorcontrib>IWAMOTO FUMIO ; YUGUCHI MASAKI ; ITAMI NOBUCHIKA ; NIRENO KATSUYA</creatorcontrib><description>PROBLEM TO BE SOLVED: To maintain a stable condition of a structure by controlling an upper jack arranged between a lower receive beam which is slidably provided for a pile and the structure and a lower jack arranged between an additional beam and the lower receive beam. SOLUTION: For example, when a new structure is built below an existing building 11, a lower receive beam 21 is constructed below the existing building 11 to hold it by a lower receive pile 22, and the lower receive beam 21 and a foundation pile 13 are arranged slidably. An upper jack 41 is arranged above the lower receive beam 21 to support the existing building 11. An additional beam 23 is provided on the foundation pile 13 which is lower than the lower receive beam 21, and a lower jack 42 is arranged between the additional beam 23 and the lower receive beam 21. The posture of the existing building 11 is kept by the upper jack 41 and the lower jack 42. It is desirable that inclination of the existing building 11 is measured by a displacement gage 51, that stroke of the jacks is measured by a jack stroke gage 52, and that the jacks 41, 42 are controlled to keep the posture of the existing building 11.</description><edition>6</edition><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1997</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19971222&amp;DB=EPODOC&amp;CC=JP&amp;NR=H09328760A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19971222&amp;DB=EPODOC&amp;CC=JP&amp;NR=H09328760A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>IWAMOTO FUMIO</creatorcontrib><creatorcontrib>YUGUCHI MASAKI</creatorcontrib><creatorcontrib>ITAMI NOBUCHIKA</creatorcontrib><creatorcontrib>NIRENO KATSUYA</creatorcontrib><title>EARTHQUAKE-PROOF REINFORCING SYSTEM</title><description>PROBLEM TO BE SOLVED: To maintain a stable condition of a structure by controlling an upper jack arranged between a lower receive beam which is slidably provided for a pile and the structure and a lower jack arranged between an additional beam and the lower receive beam. SOLUTION: For example, when a new structure is built below an existing building 11, a lower receive beam 21 is constructed below the existing building 11 to hold it by a lower receive pile 22, and the lower receive beam 21 and a foundation pile 13 are arranged slidably. An upper jack 41 is arranged above the lower receive beam 21 to support the existing building 11. An additional beam 23 is provided on the foundation pile 13 which is lower than the lower receive beam 21, and a lower jack 42 is arranged between the additional beam 23 and the lower receive beam 21. The posture of the existing building 11 is kept by the upper jack 41 and the lower jack 42. It is desirable that inclination of the existing building 11 is measured by a displacement gage 51, that stroke of the jacks is measured by a jack stroke gage 52, and that the jacks 41, 42 are controlled to keep the posture of the existing building 11.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1997</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFB2dQwK8QgMdfR21Q0I8vd3Uwhy9fRz8w9y9vRzVwiODA5x9eVhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfFeAR4GlsZGFuZmBo7GxKgBAIHaI0s</recordid><startdate>19971222</startdate><enddate>19971222</enddate><creator>IWAMOTO FUMIO</creator><creator>YUGUCHI MASAKI</creator><creator>ITAMI NOBUCHIKA</creator><creator>NIRENO KATSUYA</creator><scope>EVB</scope></search><sort><creationdate>19971222</creationdate><title>EARTHQUAKE-PROOF REINFORCING SYSTEM</title><author>IWAMOTO FUMIO ; YUGUCHI MASAKI ; ITAMI NOBUCHIKA ; NIRENO KATSUYA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH09328760A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1997</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>IWAMOTO FUMIO</creatorcontrib><creatorcontrib>YUGUCHI MASAKI</creatorcontrib><creatorcontrib>ITAMI NOBUCHIKA</creatorcontrib><creatorcontrib>NIRENO KATSUYA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>IWAMOTO FUMIO</au><au>YUGUCHI MASAKI</au><au>ITAMI NOBUCHIKA</au><au>NIRENO KATSUYA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>EARTHQUAKE-PROOF REINFORCING SYSTEM</title><date>1997-12-22</date><risdate>1997</risdate><abstract>PROBLEM TO BE SOLVED: To maintain a stable condition of a structure by controlling an upper jack arranged between a lower receive beam which is slidably provided for a pile and the structure and a lower jack arranged between an additional beam and the lower receive beam. SOLUTION: For example, when a new structure is built below an existing building 11, a lower receive beam 21 is constructed below the existing building 11 to hold it by a lower receive pile 22, and the lower receive beam 21 and a foundation pile 13 are arranged slidably. An upper jack 41 is arranged above the lower receive beam 21 to support the existing building 11. An additional beam 23 is provided on the foundation pile 13 which is lower than the lower receive beam 21, and a lower jack 42 is arranged between the additional beam 23 and the lower receive beam 21. The posture of the existing building 11 is kept by the upper jack 41 and the lower jack 42. It is desirable that inclination of the existing building 11 is measured by a displacement gage 51, that stroke of the jacks is measured by a jack stroke gage 52, and that the jacks 41, 42 are controlled to keep the posture of the existing building 11.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH09328760A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title EARTHQUAKE-PROOF REINFORCING SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-23T15%3A00%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=IWAMOTO%20FUMIO&rft.date=1997-12-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH09328760A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true