SKELETON CONNECTING METHOD IN REVERSE CONCRETE PLACING CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To enhance the joining performance of an upper layer concrete with a lower layer concrete by using a splicing sheet having surface unevenness. SOLUTION: A splicing sheet is equipped with surface unevenness, and with the projections facing down, the sheet is laid on the bottom s...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YABUUCHI HIROYUKI, TATSUTOMI KENJI, NISHINO SEIJI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YABUUCHI HIROYUKI
TATSUTOMI KENJI
NISHINO SEIJI
description PROBLEM TO BE SOLVED: To enhance the joining performance of an upper layer concrete with a lower layer concrete by using a splicing sheet having surface unevenness. SOLUTION: A splicing sheet is equipped with surface unevenness, and with the projections facing down, the sheet is laid on the bottom suffice of the camber of an exterior wall skeleton to be constructed, and steel bars for connection 12 are inserted perpendicularly to the flat surface of the sheet and secured, and upper layer concrete 20 is placed. The steel bars 12 protruding downward from the rcess in the splicing surface 14 of a capital are joined with vertical rods 15 for columanr skeleton of the lower layer by a gas pressure contact joint, etc., and a concrete form 18 is installed around the structural steel bars which were arranged, and lower layer concrete 19 for the exterior wall skeleton is placed.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH09158225A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH09158225A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH09158225A3</originalsourceid><addsrcrecordid>eNrjZPAK9nb1cQ3x91Nw9vfzc3UO8fRzV_B1DfHwd1Hw9FMIcg1zDQp2BUk6B7mGuCoE-Dg6g5QABYJDgkKB6oFaIep5GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8V4CHgaWhqYWRkamjMTFqAIo9LfE</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SKELETON CONNECTING METHOD IN REVERSE CONCRETE PLACING CONSTRUCTION METHOD</title><source>esp@cenet</source><creator>YABUUCHI HIROYUKI ; TATSUTOMI KENJI ; NISHINO SEIJI</creator><creatorcontrib>YABUUCHI HIROYUKI ; TATSUTOMI KENJI ; NISHINO SEIJI</creatorcontrib><description>PROBLEM TO BE SOLVED: To enhance the joining performance of an upper layer concrete with a lower layer concrete by using a splicing sheet having surface unevenness. SOLUTION: A splicing sheet is equipped with surface unevenness, and with the projections facing down, the sheet is laid on the bottom suffice of the camber of an exterior wall skeleton to be constructed, and steel bars for connection 12 are inserted perpendicularly to the flat surface of the sheet and secured, and upper layer concrete 20 is placed. The steel bars 12 protruding downward from the rcess in the splicing surface 14 of a capital are joined with vertical rods 15 for columanr skeleton of the lower layer by a gas pressure contact joint, etc., and a concrete form 18 is installed around the structural steel bars which were arranged, and lower layer concrete 19 for the exterior wall skeleton is placed.</description><edition>6</edition><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FORMS ; FOUNDATIONS ; GALLERIES ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHAFTS ; SHUTTERING ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1997</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19970617&amp;DB=EPODOC&amp;CC=JP&amp;NR=H09158225A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19970617&amp;DB=EPODOC&amp;CC=JP&amp;NR=H09158225A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YABUUCHI HIROYUKI</creatorcontrib><creatorcontrib>TATSUTOMI KENJI</creatorcontrib><creatorcontrib>NISHINO SEIJI</creatorcontrib><title>SKELETON CONNECTING METHOD IN REVERSE CONCRETE PLACING CONSTRUCTION METHOD</title><description>PROBLEM TO BE SOLVED: To enhance the joining performance of an upper layer concrete with a lower layer concrete by using a splicing sheet having surface unevenness. SOLUTION: A splicing sheet is equipped with surface unevenness, and with the projections facing down, the sheet is laid on the bottom suffice of the camber of an exterior wall skeleton to be constructed, and steel bars for connection 12 are inserted perpendicularly to the flat surface of the sheet and secured, and upper layer concrete 20 is placed. The steel bars 12 protruding downward from the rcess in the splicing surface 14 of a capital are joined with vertical rods 15 for columanr skeleton of the lower layer by a gas pressure contact joint, etc., and a concrete form 18 is installed around the structural steel bars which were arranged, and lower layer concrete 19 for the exterior wall skeleton is placed.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHAFTS</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1997</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPAK9nb1cQ3x91Nw9vfzc3UO8fRzV_B1DfHwd1Hw9FMIcg1zDQp2BUk6B7mGuCoE-Dg6g5QABYJDgkKB6oFaIep5GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8V4CHgaWhqYWRkamjMTFqAIo9LfE</recordid><startdate>19970617</startdate><enddate>19970617</enddate><creator>YABUUCHI HIROYUKI</creator><creator>TATSUTOMI KENJI</creator><creator>NISHINO SEIJI</creator><scope>EVB</scope></search><sort><creationdate>19970617</creationdate><title>SKELETON CONNECTING METHOD IN REVERSE CONCRETE PLACING CONSTRUCTION METHOD</title><author>YABUUCHI HIROYUKI ; TATSUTOMI KENJI ; NISHINO SEIJI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH09158225A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1997</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHAFTS</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YABUUCHI HIROYUKI</creatorcontrib><creatorcontrib>TATSUTOMI KENJI</creatorcontrib><creatorcontrib>NISHINO SEIJI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YABUUCHI HIROYUKI</au><au>TATSUTOMI KENJI</au><au>NISHINO SEIJI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SKELETON CONNECTING METHOD IN REVERSE CONCRETE PLACING CONSTRUCTION METHOD</title><date>1997-06-17</date><risdate>1997</risdate><abstract>PROBLEM TO BE SOLVED: To enhance the joining performance of an upper layer concrete with a lower layer concrete by using a splicing sheet having surface unevenness. SOLUTION: A splicing sheet is equipped with surface unevenness, and with the projections facing down, the sheet is laid on the bottom suffice of the camber of an exterior wall skeleton to be constructed, and steel bars for connection 12 are inserted perpendicularly to the flat surface of the sheet and secured, and upper layer concrete 20 is placed. The steel bars 12 protruding downward from the rcess in the splicing surface 14 of a capital are joined with vertical rods 15 for columanr skeleton of the lower layer by a gas pressure contact joint, etc., and a concrete form 18 is installed around the structural steel bars which were arranged, and lower layer concrete 19 for the exterior wall skeleton is placed.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH09158225A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FORMS
FOUNDATIONS
GALLERIES
HANDLING BUILDING MATERIALS ON THE SITE
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHAFTS
SHUTTERING
SOIL SHIFTING
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title SKELETON CONNECTING METHOD IN REVERSE CONCRETE PLACING CONSTRUCTION METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T11%3A46%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YABUUCHI%20HIROYUKI&rft.date=1997-06-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH09158225A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true