TUNNEL CONSTRUCTING METHOD

PURPOSE:To establish a pre-lining construction method, by which tunnel excavation is made upon preliminarily covering the periphery of the tunnel in excavation and which allows easy and uniform provision of the pre-lining. CONSTITUTION:At a cut face 2a in the foremost part of a tunnel being excavate...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KASE JUNICHI, KITAI HAJIME, SAKANO MASAAKI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KASE JUNICHI
KITAI HAJIME
SAKANO MASAAKI
description PURPOSE:To establish a pre-lining construction method, by which tunnel excavation is made upon preliminarily covering the periphery of the tunnel in excavation and which allows easy and uniform provision of the pre-lining. CONSTITUTION:At a cut face 2a in the foremost part of a tunnel being excavated, a reinforcement groove (a) is provided along the outside surface of the tunnel. In the reinforcement groove (a) a number of reinforcing members 10 are inserted in such a way as joining one another. Each reinforcing member 10 is previously equipped with a joining part for mutual joining. Also the reinforcing member 10 is provided with a cavity 13 to generate communication between adjoining reinforcing members 10 in the reinforcement groove (a) previously, so that a space for placing mortar is secured in the reinforcement groove (a) in which the reinforcing members 10 are inserted. Then mortar is injected into the cavities in the reinforcing members 10, and thereby the members 10 in the groove (a) are joined together in a single piece. The inside of the groove (a) is excavated. and tunnel is constructed.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH0771184A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH0771184A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH0771184A3</originalsourceid><addsrcrecordid>eNrjZJAKCfXzc_VRcPb3Cw4JCnUO8fRzV_B1DfHwd-FhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfFeAR4G5uaGhhYmjsZEKAEAFJkgUw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>TUNNEL CONSTRUCTING METHOD</title><source>esp@cenet</source><creator>KASE JUNICHI ; KITAI HAJIME ; SAKANO MASAAKI</creator><creatorcontrib>KASE JUNICHI ; KITAI HAJIME ; SAKANO MASAAKI</creatorcontrib><description>PURPOSE:To establish a pre-lining construction method, by which tunnel excavation is made upon preliminarily covering the periphery of the tunnel in excavation and which allows easy and uniform provision of the pre-lining. CONSTITUTION:At a cut face 2a in the foremost part of a tunnel being excavated, a reinforcement groove (a) is provided along the outside surface of the tunnel. In the reinforcement groove (a) a number of reinforcing members 10 are inserted in such a way as joining one another. Each reinforcing member 10 is previously equipped with a joining part for mutual joining. Also the reinforcing member 10 is provided with a cavity 13 to generate communication between adjoining reinforcing members 10 in the reinforcement groove (a) previously, so that a space for placing mortar is secured in the reinforcement groove (a) in which the reinforcing members 10 are inserted. Then mortar is injected into the cavities in the reinforcing members 10, and thereby the members 10 in the groove (a) are joined together in a single piece. The inside of the groove (a) is excavated. and tunnel is constructed.</description><edition>6</edition><language>eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>1995</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19950314&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0771184A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19950314&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0771184A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KASE JUNICHI</creatorcontrib><creatorcontrib>KITAI HAJIME</creatorcontrib><creatorcontrib>SAKANO MASAAKI</creatorcontrib><title>TUNNEL CONSTRUCTING METHOD</title><description>PURPOSE:To establish a pre-lining construction method, by which tunnel excavation is made upon preliminarily covering the periphery of the tunnel in excavation and which allows easy and uniform provision of the pre-lining. CONSTITUTION:At a cut face 2a in the foremost part of a tunnel being excavated, a reinforcement groove (a) is provided along the outside surface of the tunnel. In the reinforcement groove (a) a number of reinforcing members 10 are inserted in such a way as joining one another. Each reinforcing member 10 is previously equipped with a joining part for mutual joining. Also the reinforcing member 10 is provided with a cavity 13 to generate communication between adjoining reinforcing members 10 in the reinforcement groove (a) previously, so that a space for placing mortar is secured in the reinforcement groove (a) in which the reinforcing members 10 are inserted. Then mortar is injected into the cavities in the reinforcing members 10, and thereby the members 10 in the groove (a) are joined together in a single piece. The inside of the groove (a) is excavated. and tunnel is constructed.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1995</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJAKCfXzc_VRcPb3Cw4JCnUO8fRzV_B1DfHwd-FhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfFeAR4G5uaGhhYmjsZEKAEAFJkgUw</recordid><startdate>19950314</startdate><enddate>19950314</enddate><creator>KASE JUNICHI</creator><creator>KITAI HAJIME</creator><creator>SAKANO MASAAKI</creator><scope>EVB</scope></search><sort><creationdate>19950314</creationdate><title>TUNNEL CONSTRUCTING METHOD</title><author>KASE JUNICHI ; KITAI HAJIME ; SAKANO MASAAKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH0771184A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1995</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>KASE JUNICHI</creatorcontrib><creatorcontrib>KITAI HAJIME</creatorcontrib><creatorcontrib>SAKANO MASAAKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KASE JUNICHI</au><au>KITAI HAJIME</au><au>SAKANO MASAAKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>TUNNEL CONSTRUCTING METHOD</title><date>1995-03-14</date><risdate>1995</risdate><abstract>PURPOSE:To establish a pre-lining construction method, by which tunnel excavation is made upon preliminarily covering the periphery of the tunnel in excavation and which allows easy and uniform provision of the pre-lining. CONSTITUTION:At a cut face 2a in the foremost part of a tunnel being excavated, a reinforcement groove (a) is provided along the outside surface of the tunnel. In the reinforcement groove (a) a number of reinforcing members 10 are inserted in such a way as joining one another. Each reinforcing member 10 is previously equipped with a joining part for mutual joining. Also the reinforcing member 10 is provided with a cavity 13 to generate communication between adjoining reinforcing members 10 in the reinforcement groove (a) previously, so that a space for placing mortar is secured in the reinforcement groove (a) in which the reinforcing members 10 are inserted. Then mortar is injected into the cavities in the reinforcing members 10, and thereby the members 10 in the groove (a) are joined together in a single piece. The inside of the groove (a) is excavated. and tunnel is constructed.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH0771184A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title TUNNEL CONSTRUCTING METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T18%3A14%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KASE%20JUNICHI&rft.date=1995-03-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH0771184A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true