CONSTRUCTION METHOD FOR ANCHOR

PURPOSE:To easily pull an anchor out of an object being constructed. CONSTITUTION:In the case where a locking part 4 divided into an upper half part 2 and a lower half part 3, which is bounded by a cut part 1 cut at an acute angle, is allowed to shift laterally in a hole 5 formed on an object to be...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: WATANUKI TAKEO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WATANUKI TAKEO
description PURPOSE:To easily pull an anchor out of an object being constructed. CONSTITUTION:In the case where a locking part 4 divided into an upper half part 2 and a lower half part 3, which is bounded by a cut part 1 cut at an acute angle, is allowed to shift laterally in a hole 5 formed on an object to be constructed, the upper and lower half parts 2, 3 are allowed to shift within the range of a lateral movement clearance J formed between inner surf aces 2c, 3c of the upper and lower half parts 2, 3 and the outer surface 6a of a bolt part 6 passed through inside them when the longitudinal movement of the upper and lower half parts 2, 3 is stopped. On the other hand, when force applied to the upper half part 2 is released, the upper and lower parts 2, 3 return from the state of lateral movement to the former state, and the bolt part 6 and the locking part 4 can be removed from the hole 5.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH07238596A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH07238596A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH07238596A3</originalsourceid><addsrcrecordid>eNrjZJBz9vcLDgkKdQ7x9PdT8HUN8fB3UXDzD1Jw9HP28A_iYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxXgEeBuZGxhamlmaOxsSoAQDKUiHF</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION METHOD FOR ANCHOR</title><source>esp@cenet</source><creator>WATANUKI TAKEO</creator><creatorcontrib>WATANUKI TAKEO</creatorcontrib><description>PURPOSE:To easily pull an anchor out of an object being constructed. CONSTITUTION:In the case where a locking part 4 divided into an upper half part 2 and a lower half part 3, which is bounded by a cut part 1 cut at an acute angle, is allowed to shift laterally in a hole 5 formed on an object to be constructed, the upper and lower half parts 2, 3 are allowed to shift within the range of a lateral movement clearance J formed between inner surf aces 2c, 3c of the upper and lower half parts 2, 3 and the outer surface 6a of a bolt part 6 passed through inside them when the longitudinal movement of the upper and lower half parts 2, 3 is stopped. On the other hand, when force applied to the upper half part 2 is released, the upper and lower parts 2, 3 return from the state of lateral movement to the former state, and the bolt part 6 and the locking part 4 can be removed from the hole 5.</description><edition>6</edition><language>eng</language><subject>BUILDING ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; WALLS, e.g. PARTITIONS</subject><creationdate>1995</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19950912&amp;DB=EPODOC&amp;CC=JP&amp;NR=H07238596A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19950912&amp;DB=EPODOC&amp;CC=JP&amp;NR=H07238596A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WATANUKI TAKEO</creatorcontrib><title>CONSTRUCTION METHOD FOR ANCHOR</title><description>PURPOSE:To easily pull an anchor out of an object being constructed. CONSTITUTION:In the case where a locking part 4 divided into an upper half part 2 and a lower half part 3, which is bounded by a cut part 1 cut at an acute angle, is allowed to shift laterally in a hole 5 formed on an object to be constructed, the upper and lower half parts 2, 3 are allowed to shift within the range of a lateral movement clearance J formed between inner surf aces 2c, 3c of the upper and lower half parts 2, 3 and the outer surface 6a of a bolt part 6 passed through inside them when the longitudinal movement of the upper and lower half parts 2, 3 is stopped. On the other hand, when force applied to the upper half part 2 is released, the upper and lower parts 2, 3 return from the state of lateral movement to the former state, and the bolt part 6 and the locking part 4 can be removed from the hole 5.</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1995</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJBz9vcLDgkKdQ7x9PdT8HUN8fB3UXDzD1Jw9HP28A_iYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxXgEeBuZGxhamlmaOxsSoAQDKUiHF</recordid><startdate>19950912</startdate><enddate>19950912</enddate><creator>WATANUKI TAKEO</creator><scope>EVB</scope></search><sort><creationdate>19950912</creationdate><title>CONSTRUCTION METHOD FOR ANCHOR</title><author>WATANUKI TAKEO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH07238596A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1995</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>WATANUKI TAKEO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WATANUKI TAKEO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION METHOD FOR ANCHOR</title><date>1995-09-12</date><risdate>1995</risdate><abstract>PURPOSE:To easily pull an anchor out of an object being constructed. CONSTITUTION:In the case where a locking part 4 divided into an upper half part 2 and a lower half part 3, which is bounded by a cut part 1 cut at an acute angle, is allowed to shift laterally in a hole 5 formed on an object to be constructed, the upper and lower half parts 2, 3 are allowed to shift within the range of a lateral movement clearance J formed between inner surf aces 2c, 3c of the upper and lower half parts 2, 3 and the outer surface 6a of a bolt part 6 passed through inside them when the longitudinal movement of the upper and lower half parts 2, 3 is stopped. On the other hand, when force applied to the upper half part 2 is released, the upper and lower parts 2, 3 return from the state of lateral movement to the former state, and the bolt part 6 and the locking part 4 can be removed from the hole 5.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH07238596A
source esp@cenet
subjects BUILDING
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
GENERAL BUILDING CONSTRUCTIONS
INSULATION OR OTHER PROTECTION OF BUILDINGS
ROOFS
WALLS, e.g. PARTITIONS
title CONSTRUCTION METHOD FOR ANCHOR
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T13%3A31%3A52IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WATANUKI%20TAKEO&rft.date=1995-09-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH07238596A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true