ARCHITECTURAL STRUCTURE REBUILDING METHOD AND FOOTING STRUCTURE USED THEREFOR
PURPOSE:To reduce cost, shorten a construction period, and reduce a waste generating quantity by rebuilding an existing structure into a new architectural structure by reusing a direct footing of the existing architectural structure without breaking down it. CONSTITUTION:Guide members 5, 5,... are a...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PURPOSE:To reduce cost, shorten a construction period, and reduce a waste generating quantity by rebuilding an existing structure into a new architectural structure by reusing a direct footing of the existing architectural structure without breaking down it. CONSTITUTION:Guide members 5, 5,... are arranged beforehand in a direct footing 2 of an existing structure 2. After ground anchors 12 are constructed in the guide members 5, 5,... of the direct footing 2 in the preceding stage of breaking down the existing structure, a new structure 11 is constructed on the direct footing 2 after the existing structure is broken down by leaving the direct footing 2. |
---|