LONG SPAN STRUCTURE AND ITS CONSTRUCTION METHOD

PURPOSE:To properly perform the tension introduction to a chord beam, thereby preferably executing lift-up work, sufficiently ensuring the structural stability of a structure, and also improving the safety of construction. CONSTITUTION:A flat square roof frame 2 is ground-assembled, main pillars 3 a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: ADACHI NAOYUKI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ADACHI NAOYUKI
description PURPOSE:To properly perform the tension introduction to a chord beam, thereby preferably executing lift-up work, sufficiently ensuring the structural stability of a structure, and also improving the safety of construction. CONSTITUTION:A flat square roof frame 2 is ground-assembled, main pillars 3 are also constructed in its corner part positions, and the roof frame 2 is finally lifted up and supported by the main pillars 3. At this ground assembling work, chord girders 6 are radially assembled from the form center of the roof frame 2 toward the respective corner parts where the main pillars 3 are situated. Chord beams 9 are ground-assembled in triangular roof parts 8 partitioned by the chord girders 6, and the roof finishing work is conducted on the ground to the chord girders 6. A tension is thereafter introduced to chord members 5, 8 of the chord girder 6 and others. Thus, the roof frame 2 is perfectly constructed by the ground assembling work, and in the final stage of the completion, the tension is introduced to the chord members 5, 8.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH06346512A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH06346512A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH06346512A3</originalsourceid><addsrcrecordid>eNrjZND38fdzVwgOcPRTCA4JCnUOCQ1yVXD0c1HwDAlWcPb3gwh6-vsp-LqGePi78DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeK8ADwMzYxMzU0MjR2Ni1AAAJXMmcA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>LONG SPAN STRUCTURE AND ITS CONSTRUCTION METHOD</title><source>esp@cenet</source><creator>ADACHI NAOYUKI</creator><creatorcontrib>ADACHI NAOYUKI</creatorcontrib><description>PURPOSE:To properly perform the tension introduction to a chord beam, thereby preferably executing lift-up work, sufficiently ensuring the structural stability of a structure, and also improving the safety of construction. CONSTITUTION:A flat square roof frame 2 is ground-assembled, main pillars 3 are also constructed in its corner part positions, and the roof frame 2 is finally lifted up and supported by the main pillars 3. At this ground assembling work, chord girders 6 are radially assembled from the form center of the roof frame 2 toward the respective corner parts where the main pillars 3 are situated. Chord beams 9 are ground-assembled in triangular roof parts 8 partitioned by the chord girders 6, and the roof finishing work is conducted on the ground to the chord girders 6. A tension is thereafter introduced to chord members 5, 8 of the chord girder 6 and others. Thus, the roof frame 2 is perfectly constructed by the ground assembling work, and in the final stage of the completion, the tension is introduced to the chord members 5, 8.</description><edition>5</edition><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; BUILDING MATERIALS ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; STRUCTURAL ELEMENTS ; WALLS, e.g. PARTITIONS</subject><creationdate>1994</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19941220&amp;DB=EPODOC&amp;CC=JP&amp;NR=H06346512A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19941220&amp;DB=EPODOC&amp;CC=JP&amp;NR=H06346512A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ADACHI NAOYUKI</creatorcontrib><title>LONG SPAN STRUCTURE AND ITS CONSTRUCTION METHOD</title><description>PURPOSE:To properly perform the tension introduction to a chord beam, thereby preferably executing lift-up work, sufficiently ensuring the structural stability of a structure, and also improving the safety of construction. CONSTITUTION:A flat square roof frame 2 is ground-assembled, main pillars 3 are also constructed in its corner part positions, and the roof frame 2 is finally lifted up and supported by the main pillars 3. At this ground assembling work, chord girders 6 are radially assembled from the form center of the roof frame 2 toward the respective corner parts where the main pillars 3 are situated. Chord beams 9 are ground-assembled in triangular roof parts 8 partitioned by the chord girders 6, and the roof finishing work is conducted on the ground to the chord girders 6. A tension is thereafter introduced to chord members 5, 8 of the chord girder 6 and others. Thus, the roof frame 2 is perfectly constructed by the ground assembling work, and in the final stage of the completion, the tension is introduced to the chord members 5, 8.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>BUILDING MATERIALS</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>STRUCTURAL ELEMENTS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1994</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZND38fdzVwgOcPRTCA4JCnUOCQ1yVXD0c1HwDAlWcPb3gwh6-vsp-LqGePi78DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeK8ADwMzYxMzU0MjR2Ni1AAAJXMmcA</recordid><startdate>19941220</startdate><enddate>19941220</enddate><creator>ADACHI NAOYUKI</creator><scope>EVB</scope></search><sort><creationdate>19941220</creationdate><title>LONG SPAN STRUCTURE AND ITS CONSTRUCTION METHOD</title><author>ADACHI NAOYUKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH06346512A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1994</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>BUILDING MATERIALS</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>STRUCTURAL ELEMENTS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>ADACHI NAOYUKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ADACHI NAOYUKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>LONG SPAN STRUCTURE AND ITS CONSTRUCTION METHOD</title><date>1994-12-20</date><risdate>1994</risdate><abstract>PURPOSE:To properly perform the tension introduction to a chord beam, thereby preferably executing lift-up work, sufficiently ensuring the structural stability of a structure, and also improving the safety of construction. CONSTITUTION:A flat square roof frame 2 is ground-assembled, main pillars 3 are also constructed in its corner part positions, and the roof frame 2 is finally lifted up and supported by the main pillars 3. At this ground assembling work, chord girders 6 are radially assembled from the form center of the roof frame 2 toward the respective corner parts where the main pillars 3 are situated. Chord beams 9 are ground-assembled in triangular roof parts 8 partitioned by the chord girders 6, and the roof finishing work is conducted on the ground to the chord girders 6. A tension is thereafter introduced to chord members 5, 8 of the chord girder 6 and others. Thus, the roof frame 2 is perfectly constructed by the ground assembling work, and in the final stage of the completion, the tension is introduced to the chord members 5, 8.</abstract><edition>5</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH06346512A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
BUILDING MATERIALS
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
FORMS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
INSULATION OR OTHER PROTECTION OF BUILDINGS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
STRUCTURAL ELEMENTS
WALLS, e.g. PARTITIONS
title LONG SPAN STRUCTURE AND ITS CONSTRUCTION METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T04%3A17%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ADACHI%20NAOYUKI&rft.date=1994-12-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH06346512A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true