CONSTRUCTION OF UNDERGROUND BUILDING FRAME

PURPOSE:To reduce driving processes of earth anchors into the ground and curtail the construction period, by connecting the earth anchor jointed with a jack for settling of a caisson to a foundation pile widened at the front end to unify together therewith. CONSTITUTION:A plurality of foundation pil...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NARITA MASAO, OUCHI HITOSHI, HANAWA SUSUMU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator NARITA MASAO
OUCHI HITOSHI
HANAWA SUSUMU
description PURPOSE:To reduce driving processes of earth anchors into the ground and curtail the construction period, by connecting the earth anchor jointed with a jack for settling of a caisson to a foundation pile widened at the front end to unify together therewith. CONSTITUTION:A plurality of foundation piles 12,... widened at the front end thereof are driven into the ground within the range where a caisson composed of a plurality of lot frames 11a, 11b is settled. Next, the front ends of a plurality of earth anchors 4, 4 are connected to the foundation piles 12 respectively and the rear end thereof is connected to a plurality of hydraulic jacks 5,... When constructing the caisson, the lot frames 11a, 11b are pressurized by a pressing device composed of the hydraulic jacks 5 and the earth anchors 4 to settle and immerse the caisson into the ground. At this time, since the foundation piles are widened at the front end, the intrinsic tension can be kept even if the earth anchors are connected together as a unit.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH06341154A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH06341154A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH06341154A3</originalsourceid><addsrcrecordid>eNrjZNBy9vcLDgkKdQ7x9PdT8HdTCPVzcQ1yD_IH0gpOoZ4-Lp5-7gpuQY6-rjwMrGmJOcWpvFCam0HRzTXE2UM3tSA_PrW4IDE5NS-1JN4rwMPAzNjE0NDUxNGYGDUAciYlCQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION OF UNDERGROUND BUILDING FRAME</title><source>esp@cenet</source><creator>NARITA MASAO ; OUCHI HITOSHI ; HANAWA SUSUMU</creator><creatorcontrib>NARITA MASAO ; OUCHI HITOSHI ; HANAWA SUSUMU</creatorcontrib><description>PURPOSE:To reduce driving processes of earth anchors into the ground and curtail the construction period, by connecting the earth anchor jointed with a jack for settling of a caisson to a foundation pile widened at the front end to unify together therewith. CONSTITUTION:A plurality of foundation piles 12,... widened at the front end thereof are driven into the ground within the range where a caisson composed of a plurality of lot frames 11a, 11b is settled. Next, the front ends of a plurality of earth anchors 4, 4 are connected to the foundation piles 12 respectively and the rear end thereof is connected to a plurality of hydraulic jacks 5,... When constructing the caisson, the lot frames 11a, 11b are pressurized by a pressing device composed of the hydraulic jacks 5 and the earth anchors 4 to settle and immerse the caisson into the ground. At this time, since the foundation piles are widened at the front end, the intrinsic tension can be kept even if the earth anchors are connected together as a unit.</description><edition>5</edition><language>eng</language><subject>EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1994</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19941213&amp;DB=EPODOC&amp;CC=JP&amp;NR=H06341154A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19941213&amp;DB=EPODOC&amp;CC=JP&amp;NR=H06341154A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NARITA MASAO</creatorcontrib><creatorcontrib>OUCHI HITOSHI</creatorcontrib><creatorcontrib>HANAWA SUSUMU</creatorcontrib><title>CONSTRUCTION OF UNDERGROUND BUILDING FRAME</title><description>PURPOSE:To reduce driving processes of earth anchors into the ground and curtail the construction period, by connecting the earth anchor jointed with a jack for settling of a caisson to a foundation pile widened at the front end to unify together therewith. CONSTITUTION:A plurality of foundation piles 12,... widened at the front end thereof are driven into the ground within the range where a caisson composed of a plurality of lot frames 11a, 11b is settled. Next, the front ends of a plurality of earth anchors 4, 4 are connected to the foundation piles 12 respectively and the rear end thereof is connected to a plurality of hydraulic jacks 5,... When constructing the caisson, the lot frames 11a, 11b are pressurized by a pressing device composed of the hydraulic jacks 5 and the earth anchors 4 to settle and immerse the caisson into the ground. At this time, since the foundation piles are widened at the front end, the intrinsic tension can be kept even if the earth anchors are connected together as a unit.</description><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1994</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNBy9vcLDgkKdQ7x9PdT8HdTCPVzcQ1yD_IH0gpOoZ4-Lp5-7gpuQY6-rjwMrGmJOcWpvFCam0HRzTXE2UM3tSA_PrW4IDE5NS-1JN4rwMPAzNjE0NDUxNGYGDUAciYlCQ</recordid><startdate>19941213</startdate><enddate>19941213</enddate><creator>NARITA MASAO</creator><creator>OUCHI HITOSHI</creator><creator>HANAWA SUSUMU</creator><scope>EVB</scope></search><sort><creationdate>19941213</creationdate><title>CONSTRUCTION OF UNDERGROUND BUILDING FRAME</title><author>NARITA MASAO ; OUCHI HITOSHI ; HANAWA SUSUMU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH06341154A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1994</creationdate><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>NARITA MASAO</creatorcontrib><creatorcontrib>OUCHI HITOSHI</creatorcontrib><creatorcontrib>HANAWA SUSUMU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NARITA MASAO</au><au>OUCHI HITOSHI</au><au>HANAWA SUSUMU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION OF UNDERGROUND BUILDING FRAME</title><date>1994-12-13</date><risdate>1994</risdate><abstract>PURPOSE:To reduce driving processes of earth anchors into the ground and curtail the construction period, by connecting the earth anchor jointed with a jack for settling of a caisson to a foundation pile widened at the front end to unify together therewith. CONSTITUTION:A plurality of foundation piles 12,... widened at the front end thereof are driven into the ground within the range where a caisson composed of a plurality of lot frames 11a, 11b is settled. Next, the front ends of a plurality of earth anchors 4, 4 are connected to the foundation piles 12 respectively and the rear end thereof is connected to a plurality of hydraulic jacks 5,... When constructing the caisson, the lot frames 11a, 11b are pressurized by a pressing device composed of the hydraulic jacks 5 and the earth anchors 4 to settle and immerse the caisson into the ground. At this time, since the foundation piles are widened at the front end, the intrinsic tension can be kept even if the earth anchors are connected together as a unit.</abstract><edition>5</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH06341154A
source esp@cenet
subjects EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
SOIL SHIFTING
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title CONSTRUCTION OF UNDERGROUND BUILDING FRAME
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T22%3A53%3A23IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NARITA%20MASAO&rft.date=1994-12-13&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH06341154A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true