CONTROLLING METHOD FOR POWER DEMAND

PURPOSE:To control power demand so that the feeding power becomes to a maximum value below a power contract, and prevent a downtime loss of a power consumptive machine like a rolling mill by calculating a demand forecasting value accurately. CONSTITUTION:A plurality of power consumptive machine unit...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: OKANO MASAKI, ICHII AKIRA, ISHIDA SUKEYUKI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator OKANO MASAKI
ICHII AKIRA
ISHIDA SUKEYUKI
description PURPOSE:To control power demand so that the feeding power becomes to a maximum value below a power contract, and prevent a downtime loss of a power consumptive machine like a rolling mill by calculating a demand forecasting value accurately. CONSTITUTION:A plurality of power consumptive machine units 3, 4 and 5 are classified into a first power consumptive machine unit 5 with power consumption that increases almost in proportion to the operation time, and a second power consumptive machine units 3 and 4 with power consumption that varies according to the load. A first demand forecast value R1 is sought on the basis of first actual consumptive energy P1 consumed by the first power consumptive machine unit 5, while a second demand forecast value R2 is sought on the basis of second actual consumptive energy P2 consumed by the second power consumptive machine units 3 and 4. The feeding power of machine units previously set out of power consumptive machine units 3, 4 and 5 are so controlled that the sum (=R1+R2) of first and second demand forecast values R1 and R2 becomes to a maximum below a power contract value P0.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH06284572A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH06284572A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH06284572A3</originalsourceid><addsrcrecordid>eNrjZFB29vcLCfL38fH0c1fwdQ3x8HdRcPMPUgjwD3cNUnBx9XX0c-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfFeAR4GZkYWJqbmRo7GxKgBAGR4Ivk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONTROLLING METHOD FOR POWER DEMAND</title><source>esp@cenet</source><creator>OKANO MASAKI ; ICHII AKIRA ; ISHIDA SUKEYUKI</creator><creatorcontrib>OKANO MASAKI ; ICHII AKIRA ; ISHIDA SUKEYUKI</creatorcontrib><description>PURPOSE:To control power demand so that the feeding power becomes to a maximum value below a power contract, and prevent a downtime loss of a power consumptive machine like a rolling mill by calculating a demand forecasting value accurately. CONSTITUTION:A plurality of power consumptive machine units 3, 4 and 5 are classified into a first power consumptive machine unit 5 with power consumption that increases almost in proportion to the operation time, and a second power consumptive machine units 3 and 4 with power consumption that varies according to the load. A first demand forecast value R1 is sought on the basis of first actual consumptive energy P1 consumed by the first power consumptive machine unit 5, while a second demand forecast value R2 is sought on the basis of second actual consumptive energy P2 consumed by the second power consumptive machine units 3 and 4. The feeding power of machine units previously set out of power consumptive machine units 3, 4 and 5 are so controlled that the sum (=R1+R2) of first and second demand forecast values R1 and R2 becomes to a maximum below a power contract value P0.</description><edition>5</edition><language>eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>1994</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19941007&amp;DB=EPODOC&amp;CC=JP&amp;NR=H06284572A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19941007&amp;DB=EPODOC&amp;CC=JP&amp;NR=H06284572A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>OKANO MASAKI</creatorcontrib><creatorcontrib>ICHII AKIRA</creatorcontrib><creatorcontrib>ISHIDA SUKEYUKI</creatorcontrib><title>CONTROLLING METHOD FOR POWER DEMAND</title><description>PURPOSE:To control power demand so that the feeding power becomes to a maximum value below a power contract, and prevent a downtime loss of a power consumptive machine like a rolling mill by calculating a demand forecasting value accurately. CONSTITUTION:A plurality of power consumptive machine units 3, 4 and 5 are classified into a first power consumptive machine unit 5 with power consumption that increases almost in proportion to the operation time, and a second power consumptive machine units 3 and 4 with power consumption that varies according to the load. A first demand forecast value R1 is sought on the basis of first actual consumptive energy P1 consumed by the first power consumptive machine unit 5, while a second demand forecast value R2 is sought on the basis of second actual consumptive energy P2 consumed by the second power consumptive machine units 3 and 4. The feeding power of machine units previously set out of power consumptive machine units 3, 4 and 5 are so controlled that the sum (=R1+R2) of first and second demand forecast values R1 and R2 becomes to a maximum below a power contract value P0.</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1994</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFB29vcLCfL38fH0c1fwdQ3x8HdRcPMPUgjwD3cNUnBx9XX0c-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfFeAR4GZkYWJqbmRo7GxKgBAGR4Ivk</recordid><startdate>19941007</startdate><enddate>19941007</enddate><creator>OKANO MASAKI</creator><creator>ICHII AKIRA</creator><creator>ISHIDA SUKEYUKI</creator><scope>EVB</scope></search><sort><creationdate>19941007</creationdate><title>CONTROLLING METHOD FOR POWER DEMAND</title><author>OKANO MASAKI ; ICHII AKIRA ; ISHIDA SUKEYUKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH06284572A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1994</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>OKANO MASAKI</creatorcontrib><creatorcontrib>ICHII AKIRA</creatorcontrib><creatorcontrib>ISHIDA SUKEYUKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>OKANO MASAKI</au><au>ICHII AKIRA</au><au>ISHIDA SUKEYUKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONTROLLING METHOD FOR POWER DEMAND</title><date>1994-10-07</date><risdate>1994</risdate><abstract>PURPOSE:To control power demand so that the feeding power becomes to a maximum value below a power contract, and prevent a downtime loss of a power consumptive machine like a rolling mill by calculating a demand forecasting value accurately. CONSTITUTION:A plurality of power consumptive machine units 3, 4 and 5 are classified into a first power consumptive machine unit 5 with power consumption that increases almost in proportion to the operation time, and a second power consumptive machine units 3 and 4 with power consumption that varies according to the load. A first demand forecast value R1 is sought on the basis of first actual consumptive energy P1 consumed by the first power consumptive machine unit 5, while a second demand forecast value R2 is sought on the basis of second actual consumptive energy P2 consumed by the second power consumptive machine units 3 and 4. The feeding power of machine units previously set out of power consumptive machine units 3, 4 and 5 are so controlled that the sum (=R1+R2) of first and second demand forecast values R1 and R2 becomes to a maximum below a power contract value P0.</abstract><edition>5</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH06284572A
source esp@cenet
subjects CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERATION
SYSTEMS FOR STORING ELECTRIC ENERGY
title CONTROLLING METHOD FOR POWER DEMAND
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T10%3A59%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=OKANO%20MASAKI&rft.date=1994-10-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH06284572A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true