CONTINUOUS UNDERGROUND STEEL WALL AND CONSTRUCTION METHOD THEREOF
PURPOSE:To shorten a construction period and to reduce a construction cost by making a continuous underground wall resist in-plane shearing force as well as out of plane force to make it possible to utilize it as a permanent underground outer wall and an earthquake proof wall or a bearing wall, cont...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | OKAMOTO TATSUO SUZUKI YOSHIO MIYAKI MUNEKAZU SHIMOKOUCHI TAKAFUMI AOKI MASAMICHI KANEKO HIROFUMI SHIBATA YASUYUKI ISHII OSAMU |
description | PURPOSE:To shorten a construction period and to reduce a construction cost by making a continuous underground wall resist in-plane shearing force as well as out of plane force to make it possible to utilize it as a permanent underground outer wall and an earthquake proof wall or a bearing wall, contributing it to builing construction of a building having a large-scale underground structural part having great depth, and reducing greatly wall thickness. CONSTITUTION:A preceding unit steel material 1 inserted into a continous soil cement column strip wall 2 consisting of a plurality of soil piles 2a in the arrangement having some laps provided thereto and a succeeding unit steel material 1' inserted into an adjacent soil cement column strip wall 2' and provided thereto are such that their butt ends are connected to each other with a slide joint 3 at least up to the cutting depth. The preceding unit steel material 1 and the succeeding unit steel material 1' are melded at the cutting side part of the slide joint 3, or a stud 4 and a reinforcing bar 5 are arranged to the cutting side part of the slide joint 3, and concrete 6 is placed to connect. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH0593422A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH0593422A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH0593422A3</originalsourceid><addsrcrecordid>eNrjZHB09vcL8fQL9Q8NVgj1c3ENcg_yB9IKwSGurj4K4Y4-PgqOQC5QVXBIUKhziKe_n4Kva4iHv4tCiIdrkKu_Gw8Da1piTnEqL5TmZlBwcw1x9tBNLciPTy0uSExOzUstifcK8DAwtTQ2MTJyNCZCCQDIzSs3</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONTINUOUS UNDERGROUND STEEL WALL AND CONSTRUCTION METHOD THEREOF</title><source>esp@cenet</source><creator>OKAMOTO TATSUO ; SUZUKI YOSHIO ; MIYAKI MUNEKAZU ; SHIMOKOUCHI TAKAFUMI ; AOKI MASAMICHI ; KANEKO HIROFUMI ; SHIBATA YASUYUKI ; ISHII OSAMU</creator><creatorcontrib>OKAMOTO TATSUO ; SUZUKI YOSHIO ; MIYAKI MUNEKAZU ; SHIMOKOUCHI TAKAFUMI ; AOKI MASAMICHI ; KANEKO HIROFUMI ; SHIBATA YASUYUKI ; ISHII OSAMU</creatorcontrib><description>PURPOSE:To shorten a construction period and to reduce a construction cost by making a continuous underground wall resist in-plane shearing force as well as out of plane force to make it possible to utilize it as a permanent underground outer wall and an earthquake proof wall or a bearing wall, contributing it to builing construction of a building having a large-scale underground structural part having great depth, and reducing greatly wall thickness. CONSTITUTION:A preceding unit steel material 1 inserted into a continous soil cement column strip wall 2 consisting of a plurality of soil piles 2a in the arrangement having some laps provided thereto and a succeeding unit steel material 1' inserted into an adjacent soil cement column strip wall 2' and provided thereto are such that their butt ends are connected to each other with a slide joint 3 at least up to the cutting depth. The preceding unit steel material 1 and the succeeding unit steel material 1' are melded at the cutting side part of the slide joint 3, or a stud 4 and a reinforcing bar 5 are arranged to the cutting side part of the slide joint 3, and concrete 6 is placed to connect.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1993</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19930416&DB=EPODOC&CC=JP&NR=H0593422A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19930416&DB=EPODOC&CC=JP&NR=H0593422A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>OKAMOTO TATSUO</creatorcontrib><creatorcontrib>SUZUKI YOSHIO</creatorcontrib><creatorcontrib>MIYAKI MUNEKAZU</creatorcontrib><creatorcontrib>SHIMOKOUCHI TAKAFUMI</creatorcontrib><creatorcontrib>AOKI MASAMICHI</creatorcontrib><creatorcontrib>KANEKO HIROFUMI</creatorcontrib><creatorcontrib>SHIBATA YASUYUKI</creatorcontrib><creatorcontrib>ISHII OSAMU</creatorcontrib><title>CONTINUOUS UNDERGROUND STEEL WALL AND CONSTRUCTION METHOD THEREOF</title><description>PURPOSE:To shorten a construction period and to reduce a construction cost by making a continuous underground wall resist in-plane shearing force as well as out of plane force to make it possible to utilize it as a permanent underground outer wall and an earthquake proof wall or a bearing wall, contributing it to builing construction of a building having a large-scale underground structural part having great depth, and reducing greatly wall thickness. CONSTITUTION:A preceding unit steel material 1 inserted into a continous soil cement column strip wall 2 consisting of a plurality of soil piles 2a in the arrangement having some laps provided thereto and a succeeding unit steel material 1' inserted into an adjacent soil cement column strip wall 2' and provided thereto are such that their butt ends are connected to each other with a slide joint 3 at least up to the cutting depth. The preceding unit steel material 1 and the succeeding unit steel material 1' are melded at the cutting side part of the slide joint 3, or a stud 4 and a reinforcing bar 5 are arranged to the cutting side part of the slide joint 3, and concrete 6 is placed to connect.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1993</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB09vcL8fQL9Q8NVgj1c3ENcg_yB9IKwSGurj4K4Y4-PgqOQC5QVXBIUKhziKe_n4Kva4iHv4tCiIdrkKu_Gw8Da1piTnEqL5TmZlBwcw1x9tBNLciPTy0uSExOzUstifcK8DAwtTQ2MTJyNCZCCQDIzSs3</recordid><startdate>19930416</startdate><enddate>19930416</enddate><creator>OKAMOTO TATSUO</creator><creator>SUZUKI YOSHIO</creator><creator>MIYAKI MUNEKAZU</creator><creator>SHIMOKOUCHI TAKAFUMI</creator><creator>AOKI MASAMICHI</creator><creator>KANEKO HIROFUMI</creator><creator>SHIBATA YASUYUKI</creator><creator>ISHII OSAMU</creator><scope>EVB</scope></search><sort><creationdate>19930416</creationdate><title>CONTINUOUS UNDERGROUND STEEL WALL AND CONSTRUCTION METHOD THEREOF</title><author>OKAMOTO TATSUO ; SUZUKI YOSHIO ; MIYAKI MUNEKAZU ; SHIMOKOUCHI TAKAFUMI ; AOKI MASAMICHI ; KANEKO HIROFUMI ; SHIBATA YASUYUKI ; ISHII OSAMU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH0593422A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1993</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>OKAMOTO TATSUO</creatorcontrib><creatorcontrib>SUZUKI YOSHIO</creatorcontrib><creatorcontrib>MIYAKI MUNEKAZU</creatorcontrib><creatorcontrib>SHIMOKOUCHI TAKAFUMI</creatorcontrib><creatorcontrib>AOKI MASAMICHI</creatorcontrib><creatorcontrib>KANEKO HIROFUMI</creatorcontrib><creatorcontrib>SHIBATA YASUYUKI</creatorcontrib><creatorcontrib>ISHII OSAMU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>OKAMOTO TATSUO</au><au>SUZUKI YOSHIO</au><au>MIYAKI MUNEKAZU</au><au>SHIMOKOUCHI TAKAFUMI</au><au>AOKI MASAMICHI</au><au>KANEKO HIROFUMI</au><au>SHIBATA YASUYUKI</au><au>ISHII OSAMU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONTINUOUS UNDERGROUND STEEL WALL AND CONSTRUCTION METHOD THEREOF</title><date>1993-04-16</date><risdate>1993</risdate><abstract>PURPOSE:To shorten a construction period and to reduce a construction cost by making a continuous underground wall resist in-plane shearing force as well as out of plane force to make it possible to utilize it as a permanent underground outer wall and an earthquake proof wall or a bearing wall, contributing it to builing construction of a building having a large-scale underground structural part having great depth, and reducing greatly wall thickness. CONSTITUTION:A preceding unit steel material 1 inserted into a continous soil cement column strip wall 2 consisting of a plurality of soil piles 2a in the arrangement having some laps provided thereto and a succeeding unit steel material 1' inserted into an adjacent soil cement column strip wall 2' and provided thereto are such that their butt ends are connected to each other with a slide joint 3 at least up to the cutting depth. The preceding unit steel material 1 and the succeeding unit steel material 1' are melded at the cutting side part of the slide joint 3, or a stud 4 and a reinforcing bar 5 are arranged to the cutting side part of the slide joint 3, and concrete 6 is placed to connect.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JPH0593422A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | CONTINUOUS UNDERGROUND STEEL WALL AND CONSTRUCTION METHOD THEREOF |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-14T19%3A19%3A02IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=OKAMOTO%20TATSUO&rft.date=1993-04-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH0593422A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |