DEFLECTION CONTROL METHOD FOR CONSTRUCTION WORK WITH HUGE SPAN

PURPOSE:To provide a beam with a camber in a simple manner at low cost by cutting off a lower chord member in the construction work of a beam with a huge span so that a cavity is formed, thereby drawing up the respective ends of the lower chord member so as to be connected. CONSTITUTION:The lower ch...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NAKAYAMA KAZUMI, HAYAMA MASAYUKI, FUKUDA TAKEHISA, CHIBA OSAMU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator NAKAYAMA KAZUMI
HAYAMA MASAYUKI
FUKUDA TAKEHISA
CHIBA OSAMU
description PURPOSE:To provide a beam with a camber in a simple manner at low cost by cutting off a lower chord member in the construction work of a beam with a huge span so that a cavity is formed, thereby drawing up the respective ends of the lower chord member so as to be connected. CONSTITUTION:The lower chord member 1a of a beam 1 is cut off at its center section so that a cavity section (n) is thereby formed. The respective end sections in the cavity section (n) of the lower chord member 1a are drawn up by means of hydraulic cylinders, jacks and the like, and furthermore, both of the end sections are connected together by means of bolting or welding via connecting members so that the beam 1 is formed with a camber.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH0321739A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH0321739A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH0321739A3</originalsourceid><addsrcrecordid>eNrjZLBzcXXzcXUO8fT3U3D29wsJ8vdR8HUN8fB3UXDzDwIJBYcEhULkw_2DvBXCPUM8FDxC3V0VggMc_XgYWNMSc4pTeaE0N4OCm2uIs4duakF-fGpxQWJyal5qSbxXgIeBsZGhubGlozERSgAoDyoi</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>DEFLECTION CONTROL METHOD FOR CONSTRUCTION WORK WITH HUGE SPAN</title><source>esp@cenet</source><creator>NAKAYAMA KAZUMI ; HAYAMA MASAYUKI ; FUKUDA TAKEHISA ; CHIBA OSAMU</creator><creatorcontrib>NAKAYAMA KAZUMI ; HAYAMA MASAYUKI ; FUKUDA TAKEHISA ; CHIBA OSAMU</creatorcontrib><description>PURPOSE:To provide a beam with a camber in a simple manner at low cost by cutting off a lower chord member in the construction work of a beam with a huge span so that a cavity is formed, thereby drawing up the respective ends of the lower chord member so as to be connected. CONSTITUTION:The lower chord member 1a of a beam 1 is cut off at its center section so that a cavity section (n) is thereby formed. The respective end sections in the cavity section (n) of the lower chord member 1a are drawn up by means of hydraulic cylinders, jacks and the like, and furthermore, both of the end sections are connected together by means of bolting or welding via connecting members so that the beam 1 is formed with a camber.</description><language>eng</language><subject>BUILDING ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; WALLS, e.g. PARTITIONS</subject><creationdate>1991</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19910130&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0321739A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19910130&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0321739A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NAKAYAMA KAZUMI</creatorcontrib><creatorcontrib>HAYAMA MASAYUKI</creatorcontrib><creatorcontrib>FUKUDA TAKEHISA</creatorcontrib><creatorcontrib>CHIBA OSAMU</creatorcontrib><title>DEFLECTION CONTROL METHOD FOR CONSTRUCTION WORK WITH HUGE SPAN</title><description>PURPOSE:To provide a beam with a camber in a simple manner at low cost by cutting off a lower chord member in the construction work of a beam with a huge span so that a cavity is formed, thereby drawing up the respective ends of the lower chord member so as to be connected. CONSTITUTION:The lower chord member 1a of a beam 1 is cut off at its center section so that a cavity section (n) is thereby formed. The respective end sections in the cavity section (n) of the lower chord member 1a are drawn up by means of hydraulic cylinders, jacks and the like, and furthermore, both of the end sections are connected together by means of bolting or welding via connecting members so that the beam 1 is formed with a camber.</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1991</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBzcXXzcXUO8fT3U3D29wsJ8vdR8HUN8fB3UXDzDwIJBYcEhULkw_2DvBXCPUM8FDxC3V0VggMc_XgYWNMSc4pTeaE0N4OCm2uIs4duakF-fGpxQWJyal5qSbxXgIeBsZGhubGlozERSgAoDyoi</recordid><startdate>19910130</startdate><enddate>19910130</enddate><creator>NAKAYAMA KAZUMI</creator><creator>HAYAMA MASAYUKI</creator><creator>FUKUDA TAKEHISA</creator><creator>CHIBA OSAMU</creator><scope>EVB</scope></search><sort><creationdate>19910130</creationdate><title>DEFLECTION CONTROL METHOD FOR CONSTRUCTION WORK WITH HUGE SPAN</title><author>NAKAYAMA KAZUMI ; HAYAMA MASAYUKI ; FUKUDA TAKEHISA ; CHIBA OSAMU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH0321739A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1991</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>NAKAYAMA KAZUMI</creatorcontrib><creatorcontrib>HAYAMA MASAYUKI</creatorcontrib><creatorcontrib>FUKUDA TAKEHISA</creatorcontrib><creatorcontrib>CHIBA OSAMU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NAKAYAMA KAZUMI</au><au>HAYAMA MASAYUKI</au><au>FUKUDA TAKEHISA</au><au>CHIBA OSAMU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>DEFLECTION CONTROL METHOD FOR CONSTRUCTION WORK WITH HUGE SPAN</title><date>1991-01-30</date><risdate>1991</risdate><abstract>PURPOSE:To provide a beam with a camber in a simple manner at low cost by cutting off a lower chord member in the construction work of a beam with a huge span so that a cavity is formed, thereby drawing up the respective ends of the lower chord member so as to be connected. CONSTITUTION:The lower chord member 1a of a beam 1 is cut off at its center section so that a cavity section (n) is thereby formed. The respective end sections in the cavity section (n) of the lower chord member 1a are drawn up by means of hydraulic cylinders, jacks and the like, and furthermore, both of the end sections are connected together by means of bolting or welding via connecting members so that the beam 1 is formed with a camber.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH0321739A
source esp@cenet
subjects BUILDING
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
GENERAL BUILDING CONSTRUCTIONS
INSULATION OR OTHER PROTECTION OF BUILDINGS
ROOFS
WALLS, e.g. PARTITIONS
title DEFLECTION CONTROL METHOD FOR CONSTRUCTION WORK WITH HUGE SPAN
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T15%3A28%3A55IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NAKAYAMA%20KAZUMI&rft.date=1991-01-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH0321739A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true