CONSTRUCTION METHOD OF BASEMENT AND COLUMN AND BEAM JOINING BODY USED THEREFOR

PURPOSE:To rationalize the joining of piles, columns and struts by connecting the lower ends of core columns to the tops of concrete piles, and connecting beams to a prefabricated column and beam joining body which is fitted and inserted from the tops of the core columns to arrange. CONSTITUTION:Con...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KUROSE YUKINOBU, UMAZUME HARUHIKO, TAKAHASHI SATOSHI, SAITO YUTAKA, MOROI YOJI, OTSUKA SHIGEKI, YOSHIMURA MASAHIRO, OKUYAMA NOBUHIRO, SEKI YOICHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KUROSE YUKINOBU
UMAZUME HARUHIKO
TAKAHASHI SATOSHI
SAITO YUTAKA
MOROI YOJI
OTSUKA SHIGEKI
YOSHIMURA MASAHIRO
OKUYAMA NOBUHIRO
SEKI YOICHI
description PURPOSE:To rationalize the joining of piles, columns and struts by connecting the lower ends of core columns to the tops of concrete piles, and connecting beams to a prefabricated column and beam joining body which is fitted and inserted from the tops of the core columns to arrange. CONSTITUTION:Concrete piles 4 are driven up to a specific depth from the surface of the ground, and the lower ends 62 of steel core columns 61 are inserted in the tops 41 of them to connect before they are solidified. After that, a column and beam joining body 10, etc. formed separately of a prefabrication, etc. are fitted and inserted from the tops 63 of the core columns 61 to support them on brackets 64, and concrete 65 work for columns 6 under the brackets can be carried out, while concrete for a connection of floor beams 7 and floor slabs 8 is placed. Then, beams 7A are constructed to the insides of external walls 3, PC beams 71 are arranged to complete the floor beams 7, and excavation work for the next work is carried out. According to the constitution, the joining of piles, columns and struts can be rationalized and, at the same time, the process of work can be reduced.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH03132520A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH03132520A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH03132520A3</originalsourceid><addsrcrecordid>eNrjZPBz9vcLDgkKdQ7x9PdT8HUN8fB3UfB3U3ByDHb1dfULUXD0c1Fw9vcJ9fUDM51cHX0VvPw9_Tz93BWc_F0iFUKDXV0UQjxcg1zd_IN4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8V4CHgbGhsZGpkYGjMTFqAAFGLlw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION METHOD OF BASEMENT AND COLUMN AND BEAM JOINING BODY USED THEREFOR</title><source>esp@cenet</source><creator>KUROSE YUKINOBU ; UMAZUME HARUHIKO ; TAKAHASHI SATOSHI ; SAITO YUTAKA ; MOROI YOJI ; OTSUKA SHIGEKI ; YOSHIMURA MASAHIRO ; OKUYAMA NOBUHIRO ; SEKI YOICHI</creator><creatorcontrib>KUROSE YUKINOBU ; UMAZUME HARUHIKO ; TAKAHASHI SATOSHI ; SAITO YUTAKA ; MOROI YOJI ; OTSUKA SHIGEKI ; YOSHIMURA MASAHIRO ; OKUYAMA NOBUHIRO ; SEKI YOICHI</creatorcontrib><description>PURPOSE:To rationalize the joining of piles, columns and struts by connecting the lower ends of core columns to the tops of concrete piles, and connecting beams to a prefabricated column and beam joining body which is fitted and inserted from the tops of the core columns to arrange. CONSTITUTION:Concrete piles 4 are driven up to a specific depth from the surface of the ground, and the lower ends 62 of steel core columns 61 are inserted in the tops 41 of them to connect before they are solidified. After that, a column and beam joining body 10, etc. formed separately of a prefabrication, etc. are fitted and inserted from the tops 63 of the core columns 61 to support them on brackets 64, and concrete 65 work for columns 6 under the brackets can be carried out, while concrete for a connection of floor beams 7 and floor slabs 8 is placed. Then, beams 7A are constructed to the insides of external walls 3, PC beams 71 are arranged to complete the floor beams 7, and excavation work for the next work is carried out. According to the constitution, the joining of piles, columns and struts can be rationalized and, at the same time, the process of work can be reduced.</description><language>eng</language><subject>BUILDING ; BUILDING MATERIALS ; CEILINGS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FLOORS ; FOUNDATIONS ; GENERAL BUILDING CONSTRUCTIONS ; HYDRAULIC ENGINEERING ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; SOIL SHIFTING ; STRUCTURAL ELEMENTS ; UNDERGROUND OR UNDERWATER STRUCTURES ; WALLS, e.g. PARTITIONS</subject><creationdate>1991</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19910605&amp;DB=EPODOC&amp;CC=JP&amp;NR=H03132520A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19910605&amp;DB=EPODOC&amp;CC=JP&amp;NR=H03132520A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KUROSE YUKINOBU</creatorcontrib><creatorcontrib>UMAZUME HARUHIKO</creatorcontrib><creatorcontrib>TAKAHASHI SATOSHI</creatorcontrib><creatorcontrib>SAITO YUTAKA</creatorcontrib><creatorcontrib>MOROI YOJI</creatorcontrib><creatorcontrib>OTSUKA SHIGEKI</creatorcontrib><creatorcontrib>YOSHIMURA MASAHIRO</creatorcontrib><creatorcontrib>OKUYAMA NOBUHIRO</creatorcontrib><creatorcontrib>SEKI YOICHI</creatorcontrib><title>CONSTRUCTION METHOD OF BASEMENT AND COLUMN AND BEAM JOINING BODY USED THEREFOR</title><description>PURPOSE:To rationalize the joining of piles, columns and struts by connecting the lower ends of core columns to the tops of concrete piles, and connecting beams to a prefabricated column and beam joining body which is fitted and inserted from the tops of the core columns to arrange. CONSTITUTION:Concrete piles 4 are driven up to a specific depth from the surface of the ground, and the lower ends 62 of steel core columns 61 are inserted in the tops 41 of them to connect before they are solidified. After that, a column and beam joining body 10, etc. formed separately of a prefabrication, etc. are fitted and inserted from the tops 63 of the core columns 61 to support them on brackets 64, and concrete 65 work for columns 6 under the brackets can be carried out, while concrete for a connection of floor beams 7 and floor slabs 8 is placed. Then, beams 7A are constructed to the insides of external walls 3, PC beams 71 are arranged to complete the floor beams 7, and excavation work for the next work is carried out. According to the constitution, the joining of piles, columns and struts can be rationalized and, at the same time, the process of work can be reduced.</description><subject>BUILDING</subject><subject>BUILDING MATERIALS</subject><subject>CEILINGS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FOUNDATIONS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>SOIL SHIFTING</subject><subject>STRUCTURAL ELEMENTS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1991</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPBz9vcLDgkKdQ7x9PdT8HUN8fB3UfB3U3ByDHb1dfULUXD0c1Fw9vcJ9fUDM51cHX0VvPw9_Tz93BWc_F0iFUKDXV0UQjxcg1zd_IN4GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8V4CHgbGhsZGpkYGjMTFqAAFGLlw</recordid><startdate>19910605</startdate><enddate>19910605</enddate><creator>KUROSE YUKINOBU</creator><creator>UMAZUME HARUHIKO</creator><creator>TAKAHASHI SATOSHI</creator><creator>SAITO YUTAKA</creator><creator>MOROI YOJI</creator><creator>OTSUKA SHIGEKI</creator><creator>YOSHIMURA MASAHIRO</creator><creator>OKUYAMA NOBUHIRO</creator><creator>SEKI YOICHI</creator><scope>EVB</scope></search><sort><creationdate>19910605</creationdate><title>CONSTRUCTION METHOD OF BASEMENT AND COLUMN AND BEAM JOINING BODY USED THEREFOR</title><author>KUROSE YUKINOBU ; UMAZUME HARUHIKO ; TAKAHASHI SATOSHI ; SAITO YUTAKA ; MOROI YOJI ; OTSUKA SHIGEKI ; YOSHIMURA MASAHIRO ; OKUYAMA NOBUHIRO ; SEKI YOICHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH03132520A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1991</creationdate><topic>BUILDING</topic><topic>BUILDING MATERIALS</topic><topic>CEILINGS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FOUNDATIONS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>SOIL SHIFTING</topic><topic>STRUCTURAL ELEMENTS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>KUROSE YUKINOBU</creatorcontrib><creatorcontrib>UMAZUME HARUHIKO</creatorcontrib><creatorcontrib>TAKAHASHI SATOSHI</creatorcontrib><creatorcontrib>SAITO YUTAKA</creatorcontrib><creatorcontrib>MOROI YOJI</creatorcontrib><creatorcontrib>OTSUKA SHIGEKI</creatorcontrib><creatorcontrib>YOSHIMURA MASAHIRO</creatorcontrib><creatorcontrib>OKUYAMA NOBUHIRO</creatorcontrib><creatorcontrib>SEKI YOICHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KUROSE YUKINOBU</au><au>UMAZUME HARUHIKO</au><au>TAKAHASHI SATOSHI</au><au>SAITO YUTAKA</au><au>MOROI YOJI</au><au>OTSUKA SHIGEKI</au><au>YOSHIMURA MASAHIRO</au><au>OKUYAMA NOBUHIRO</au><au>SEKI YOICHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION METHOD OF BASEMENT AND COLUMN AND BEAM JOINING BODY USED THEREFOR</title><date>1991-06-05</date><risdate>1991</risdate><abstract>PURPOSE:To rationalize the joining of piles, columns and struts by connecting the lower ends of core columns to the tops of concrete piles, and connecting beams to a prefabricated column and beam joining body which is fitted and inserted from the tops of the core columns to arrange. CONSTITUTION:Concrete piles 4 are driven up to a specific depth from the surface of the ground, and the lower ends 62 of steel core columns 61 are inserted in the tops 41 of them to connect before they are solidified. After that, a column and beam joining body 10, etc. formed separately of a prefabrication, etc. are fitted and inserted from the tops 63 of the core columns 61 to support them on brackets 64, and concrete 65 work for columns 6 under the brackets can be carried out, while concrete for a connection of floor beams 7 and floor slabs 8 is placed. Then, beams 7A are constructed to the insides of external walls 3, PC beams 71 are arranged to complete the floor beams 7, and excavation work for the next work is carried out. According to the constitution, the joining of piles, columns and struts can be rationalized and, at the same time, the process of work can be reduced.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH03132520A
source esp@cenet
subjects BUILDING
BUILDING MATERIALS
CEILINGS
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FLOORS
FOUNDATIONS
GENERAL BUILDING CONSTRUCTIONS
HYDRAULIC ENGINEERING
INSULATION OR OTHER PROTECTION OF BUILDINGS
ROOFS
SOIL SHIFTING
STRUCTURAL ELEMENTS
UNDERGROUND OR UNDERWATER STRUCTURES
WALLS, e.g. PARTITIONS
title CONSTRUCTION METHOD OF BASEMENT AND COLUMN AND BEAM JOINING BODY USED THEREFOR
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-30T04%3A24%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KUROSE%20YUKINOBU&rft.date=1991-06-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH03132520A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true