EXECUTION OF CAISSON

PURPOSE:To facilitate construction by installing a caisson in which iron reinforcements are projected from a wall surface at the slab position under water onto the bottom of water and throwing the inside filling sands into the caisson and binding the previously assembled iron reinforcements onto the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: UEKI MITSUO, TADOKORO YASUHIRO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator UEKI MITSUO
TADOKORO YASUHIRO
description PURPOSE:To facilitate construction by installing a caisson in which iron reinforcements are projected from a wall surface at the slab position under water onto the bottom of water and throwing the inside filling sands into the caisson and binding the previously assembled iron reinforcements onto the iron reinforcements and laying slab concrete. CONSTITUTION:A caisson is prepared in the state where iron reinforcements 13 are projected from a side wall and a partitioning wall, and transported to an installation position. Then, water is poured into the caisson, and said caisson is installed at a prescribed position on a foundation cobble stone levelling position on the bottom of water. Then, the inside filling sands S are thrown into the caisson, and the inside filing sands S are thrown up to the part where the iron reinforcements 13 are projected on a retarding part 3 side having slits 2. Then, a previously assembled iron reinforcement 15 is setting-bound onto the iron reinforcement 13. Further, in the state where water is left in the retarding part 3, a slab is prepared by laying slab concrete by using the special under water concrete.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH0258631A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH0258631A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH0258631A3</originalsourceid><addsrcrecordid>eNrjZBBxjXB1Dg3x9PdT8HdTcHb0DA729-NhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfFeAR4GRqYWZsaGjsZEKAEARAQeZg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>EXECUTION OF CAISSON</title><source>esp@cenet</source><creator>UEKI MITSUO ; TADOKORO YASUHIRO</creator><creatorcontrib>UEKI MITSUO ; TADOKORO YASUHIRO</creatorcontrib><description>PURPOSE:To facilitate construction by installing a caisson in which iron reinforcements are projected from a wall surface at the slab position under water onto the bottom of water and throwing the inside filling sands into the caisson and binding the previously assembled iron reinforcements onto the iron reinforcements and laying slab concrete. CONSTITUTION:A caisson is prepared in the state where iron reinforcements 13 are projected from a side wall and a partitioning wall, and transported to an installation position. Then, water is poured into the caisson, and said caisson is installed at a prescribed position on a foundation cobble stone levelling position on the bottom of water. Then, the inside filling sands S are thrown into the caisson, and the inside filing sands S are thrown up to the part where the iron reinforcements 13 are projected on a retarding part 3 side having slits 2. Then, a previously assembled iron reinforcement 15 is setting-bound onto the iron reinforcement 13. Further, in the state where water is left in the retarding part 3, a slab is prepared by laying slab concrete by using the special under water concrete.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1990</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19900227&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0258631A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19900227&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0258631A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>UEKI MITSUO</creatorcontrib><creatorcontrib>TADOKORO YASUHIRO</creatorcontrib><title>EXECUTION OF CAISSON</title><description>PURPOSE:To facilitate construction by installing a caisson in which iron reinforcements are projected from a wall surface at the slab position under water onto the bottom of water and throwing the inside filling sands into the caisson and binding the previously assembled iron reinforcements onto the iron reinforcements and laying slab concrete. CONSTITUTION:A caisson is prepared in the state where iron reinforcements 13 are projected from a side wall and a partitioning wall, and transported to an installation position. Then, water is poured into the caisson, and said caisson is installed at a prescribed position on a foundation cobble stone levelling position on the bottom of water. Then, the inside filling sands S are thrown into the caisson, and the inside filing sands S are thrown up to the part where the iron reinforcements 13 are projected on a retarding part 3 side having slits 2. Then, a previously assembled iron reinforcement 15 is setting-bound onto the iron reinforcement 13. Further, in the state where water is left in the retarding part 3, a slab is prepared by laying slab concrete by using the special under water concrete.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1990</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBBxjXB1Dg3x9PdT8HdTcHb0DA729-NhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfFeAR4GRqYWZsaGjsZEKAEARAQeZg</recordid><startdate>19900227</startdate><enddate>19900227</enddate><creator>UEKI MITSUO</creator><creator>TADOKORO YASUHIRO</creator><scope>EVB</scope></search><sort><creationdate>19900227</creationdate><title>EXECUTION OF CAISSON</title><author>UEKI MITSUO ; TADOKORO YASUHIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH0258631A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1990</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>UEKI MITSUO</creatorcontrib><creatorcontrib>TADOKORO YASUHIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>UEKI MITSUO</au><au>TADOKORO YASUHIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>EXECUTION OF CAISSON</title><date>1990-02-27</date><risdate>1990</risdate><abstract>PURPOSE:To facilitate construction by installing a caisson in which iron reinforcements are projected from a wall surface at the slab position under water onto the bottom of water and throwing the inside filling sands into the caisson and binding the previously assembled iron reinforcements onto the iron reinforcements and laying slab concrete. CONSTITUTION:A caisson is prepared in the state where iron reinforcements 13 are projected from a side wall and a partitioning wall, and transported to an installation position. Then, water is poured into the caisson, and said caisson is installed at a prescribed position on a foundation cobble stone levelling position on the bottom of water. Then, the inside filling sands S are thrown into the caisson, and the inside filing sands S are thrown up to the part where the iron reinforcements 13 are projected on a retarding part 3 side having slits 2. Then, a previously assembled iron reinforcement 15 is setting-bound onto the iron reinforcement 13. Further, in the state where water is left in the retarding part 3, a slab is prepared by laying slab concrete by using the special under water concrete.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH0258631A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title EXECUTION OF CAISSON
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-18T00%3A41%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=UEKI%20MITSUO&rft.date=1990-02-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH0258631A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true