JP2566197B

PURPOSE:To improve the workability, by fluidizing sand and soil under a movable slab and discharging the sand and soil upward and lowering the movable slab and after fixing it at a specified position, constructing a slab by use of a form on the movable by and repeating this process. CONSTITUTION:San...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FUJIKI IKUO, NAKAJIMA MAKOTO, SUKEGAWA TEI, NUMAZAWA KENJIRO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator FUJIKI IKUO
NAKAJIMA MAKOTO
SUKEGAWA TEI
NUMAZAWA KENJIRO
description PURPOSE:To improve the workability, by fluidizing sand and soil under a movable slab and discharging the sand and soil upward and lowering the movable slab and after fixing it at a specified position, constructing a slab by use of a form on the movable by and repeating this process. CONSTITUTION:Sand and soil under a movable slab 5 is fluidized toy a fluidizing device 8 of sand and soil and discharged to the upper side of the movable slab 5 by a suction device 9 of mud. The movable slab 5 is lowered by the own weight to excavate the ground further. The movable slab 5 is suspended at a specified position and lowering and excavating motions are stopped and a jack 6 is stretched ad the movable slab 5 is fixed between earth retaining walls 1a, 1b. Next, a form 12 to construct a slab is installed on the movable slab 5 through a form support 13 and reinforcements are arranged and concrete is placed to construct an upper slab floor US. After curing of the slab US, the jack is retracted and the same processes are repeated to construct slabs of respective lower floors. Moreover, a foundation is constructed, the movable slab is buried, and temporary structures are removed In this way, the cost is reduced with automation and the construction can be safety carried out.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2566197BB2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2566197BB2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2566197BB23</originalsourceid><addsrcrecordid>eNrjZODyCjAyNTMztDR34mFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8QgNTkbGxKgBACqDG4U</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>JP2566197B</title><source>esp@cenet</source><creator>FUJIKI IKUO ; NAKAJIMA MAKOTO ; SUKEGAWA TEI ; NUMAZAWA KENJIRO</creator><creatorcontrib>FUJIKI IKUO ; NAKAJIMA MAKOTO ; SUKEGAWA TEI ; NUMAZAWA KENJIRO</creatorcontrib><description>PURPOSE:To improve the workability, by fluidizing sand and soil under a movable slab and discharging the sand and soil upward and lowering the movable slab and after fixing it at a specified position, constructing a slab by use of a form on the movable by and repeating this process. CONSTITUTION:Sand and soil under a movable slab 5 is fluidized toy a fluidizing device 8 of sand and soil and discharged to the upper side of the movable slab 5 by a suction device 9 of mud. The movable slab 5 is lowered by the own weight to excavate the ground further. The movable slab 5 is suspended at a specified position and lowering and excavating motions are stopped and a jack 6 is stretched ad the movable slab 5 is fixed between earth retaining walls 1a, 1b. Next, a form 12 to construct a slab is installed on the movable slab 5 through a form support 13 and reinforcements are arranged and concrete is placed to construct an upper slab floor US. After curing of the slab US, the jack is retracted and the same processes are repeated to construct slabs of respective lower floors. Moreover, a foundation is constructed, the movable slab is buried, and temporary structures are removed In this way, the cost is reduced with automation and the construction can be safety carried out.</description><edition>6</edition><language>eng</language><subject>EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1996</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19961225&amp;DB=EPODOC&amp;CC=JP&amp;NR=2566197B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19961225&amp;DB=EPODOC&amp;CC=JP&amp;NR=2566197B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FUJIKI IKUO</creatorcontrib><creatorcontrib>NAKAJIMA MAKOTO</creatorcontrib><creatorcontrib>SUKEGAWA TEI</creatorcontrib><creatorcontrib>NUMAZAWA KENJIRO</creatorcontrib><title>JP2566197B</title><description>PURPOSE:To improve the workability, by fluidizing sand and soil under a movable slab and discharging the sand and soil upward and lowering the movable slab and after fixing it at a specified position, constructing a slab by use of a form on the movable by and repeating this process. CONSTITUTION:Sand and soil under a movable slab 5 is fluidized toy a fluidizing device 8 of sand and soil and discharged to the upper side of the movable slab 5 by a suction device 9 of mud. The movable slab 5 is lowered by the own weight to excavate the ground further. The movable slab 5 is suspended at a specified position and lowering and excavating motions are stopped and a jack 6 is stretched ad the movable slab 5 is fixed between earth retaining walls 1a, 1b. Next, a form 12 to construct a slab is installed on the movable slab 5 through a form support 13 and reinforcements are arranged and concrete is placed to construct an upper slab floor US. After curing of the slab US, the jack is retracted and the same processes are repeated to construct slabs of respective lower floors. Moreover, a foundation is constructed, the movable slab is buried, and temporary structures are removed In this way, the cost is reduced with automation and the construction can be safety carried out.</description><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1996</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZODyCjAyNTMztDR34mFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8QgNTkbGxKgBACqDG4U</recordid><startdate>19961225</startdate><enddate>19961225</enddate><creator>FUJIKI IKUO</creator><creator>NAKAJIMA MAKOTO</creator><creator>SUKEGAWA TEI</creator><creator>NUMAZAWA KENJIRO</creator><scope>EVB</scope></search><sort><creationdate>19961225</creationdate><title>JP2566197B</title><author>FUJIKI IKUO ; NAKAJIMA MAKOTO ; SUKEGAWA TEI ; NUMAZAWA KENJIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2566197BB23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1996</creationdate><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>FUJIKI IKUO</creatorcontrib><creatorcontrib>NAKAJIMA MAKOTO</creatorcontrib><creatorcontrib>SUKEGAWA TEI</creatorcontrib><creatorcontrib>NUMAZAWA KENJIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FUJIKI IKUO</au><au>NAKAJIMA MAKOTO</au><au>SUKEGAWA TEI</au><au>NUMAZAWA KENJIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>JP2566197B</title><date>1996-12-25</date><risdate>1996</risdate><abstract>PURPOSE:To improve the workability, by fluidizing sand and soil under a movable slab and discharging the sand and soil upward and lowering the movable slab and after fixing it at a specified position, constructing a slab by use of a form on the movable by and repeating this process. CONSTITUTION:Sand and soil under a movable slab 5 is fluidized toy a fluidizing device 8 of sand and soil and discharged to the upper side of the movable slab 5 by a suction device 9 of mud. The movable slab 5 is lowered by the own weight to excavate the ground further. The movable slab 5 is suspended at a specified position and lowering and excavating motions are stopped and a jack 6 is stretched ad the movable slab 5 is fixed between earth retaining walls 1a, 1b. Next, a form 12 to construct a slab is installed on the movable slab 5 through a form support 13 and reinforcements are arranged and concrete is placed to construct an upper slab floor US. After curing of the slab US, the jack is retracted and the same processes are repeated to construct slabs of respective lower floors. Moreover, a foundation is constructed, the movable slab is buried, and temporary structures are removed In this way, the cost is reduced with automation and the construction can be safety carried out.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2566197BB2
source esp@cenet
subjects EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
SOIL SHIFTING
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title JP2566197B
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T04%3A36%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FUJIKI%20IKUO&rft.date=1996-12-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2566197BB2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true