STORAGE BATTERY CONTROL APPARATUS, AND POWER STORAGE SYSTEM

To manage the amount of stored power in units of storage battery strings and in units of storage batteries even in a large-scale power storage system and appropriately suppress the processing load of a control device.SOLUTION: A storage battery control apparatus 2 comprises: a plurality of first con...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: SHODA TAKAHIRO
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SHODA TAKAHIRO
description To manage the amount of stored power in units of storage battery strings and in units of storage batteries even in a large-scale power storage system and appropriately suppress the processing load of a control device.SOLUTION: A storage battery control apparatus 2 comprises: a plurality of first control devices 21 provided for each of strings ST1-STx and controlling a string auxiliary unit 5; and a second control device 22 communicating with the plurality of first control devices 21 and a host server 7 outside of a power storage system 1. Information regarding the states of the strings ST1-STx is acquired and transmitted to the second control device 22 by the first control devices 21. Based on a charge/discharge power instruction value of the power storage system 1 received from the host server 7 and the information regarding the states of the plurality of strings ST1-STx received from the plurality of first control devices 21, a charge/discharge power instruction values to be allocated to each of the plurality of strings ST1-STx is calculated and transmitted to the first control device 21 by the second control device 22.SELECTED DRAWING: Figure 4 【課題】大規模な蓄電システムにおいても蓄電量を蓄電池ストリングの単位と蓄電池の単位とで管理すると共に、制御装置の処理負荷を適切に抑える。【解決手段】蓄電池制御装置2は、ストリングST1~STx毎に設けられ、ストリング補器5を制御する複数の第1制御装置21と、複数の第1制御装置21と蓄電システム1外の上位サーバー7と通信する第2制御装置22とを備える。第1制御装置21は、ストリングST1~STxの状態についての情報を取得して第2制御装置22に送信する。第2制御装置22は、上位サーバー7から受信する蓄電システム1の充放電電力指示値と、複数の第1制御装置21から受信する複数のストリングST1~STxの状態についての情報とに基づいて、複数のストリングST1~STxのそれぞれに割り当てる充放電電力指示値を算出して第1制御装置21に送信する。【選択図】図4
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2024077720A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2024077720A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2024077720A3</originalsourceid><addsrcrecordid>eNrjZLAODvEPcnR3VXByDAlxDYpUcPb3Cwny91FwDAhwDHIMCQ3WUXD0c1EI8A93DVKAKQ6ODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGRiYG5ubmRgaOxkQpAgBNnyn8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>STORAGE BATTERY CONTROL APPARATUS, AND POWER STORAGE SYSTEM</title><source>esp@cenet</source><creator>SHODA TAKAHIRO</creator><creatorcontrib>SHODA TAKAHIRO</creatorcontrib><description>To manage the amount of stored power in units of storage battery strings and in units of storage batteries even in a large-scale power storage system and appropriately suppress the processing load of a control device.SOLUTION: A storage battery control apparatus 2 comprises: a plurality of first control devices 21 provided for each of strings ST1-STx and controlling a string auxiliary unit 5; and a second control device 22 communicating with the plurality of first control devices 21 and a host server 7 outside of a power storage system 1. Information regarding the states of the strings ST1-STx is acquired and transmitted to the second control device 22 by the first control devices 21. Based on a charge/discharge power instruction value of the power storage system 1 received from the host server 7 and the information regarding the states of the plurality of strings ST1-STx received from the plurality of first control devices 21, a charge/discharge power instruction values to be allocated to each of the plurality of strings ST1-STx is calculated and transmitted to the first control device 21 by the second control device 22.SELECTED DRAWING: Figure 4 【課題】大規模な蓄電システムにおいても蓄電量を蓄電池ストリングの単位と蓄電池の単位とで管理すると共に、制御装置の処理負荷を適切に抑える。【解決手段】蓄電池制御装置2は、ストリングST1~STx毎に設けられ、ストリング補器5を制御する複数の第1制御装置21と、複数の第1制御装置21と蓄電システム1外の上位サーバー7と通信する第2制御装置22とを備える。第1制御装置21は、ストリングST1~STxの状態についての情報を取得して第2制御装置22に送信する。第2制御装置22は、上位サーバー7から受信する蓄電システム1の充放電電力指示値と、複数の第1制御装置21から受信する複数のストリングST1~STxの状態についての情報とに基づいて、複数のストリングST1~STxのそれぞれに割り当てる充放電電力指示値を算出して第1制御装置21に送信する。【選択図】図4</description><language>eng ; jpn</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240610&amp;DB=EPODOC&amp;CC=JP&amp;NR=2024077720A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240610&amp;DB=EPODOC&amp;CC=JP&amp;NR=2024077720A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHODA TAKAHIRO</creatorcontrib><title>STORAGE BATTERY CONTROL APPARATUS, AND POWER STORAGE SYSTEM</title><description>To manage the amount of stored power in units of storage battery strings and in units of storage batteries even in a large-scale power storage system and appropriately suppress the processing load of a control device.SOLUTION: A storage battery control apparatus 2 comprises: a plurality of first control devices 21 provided for each of strings ST1-STx and controlling a string auxiliary unit 5; and a second control device 22 communicating with the plurality of first control devices 21 and a host server 7 outside of a power storage system 1. Information regarding the states of the strings ST1-STx is acquired and transmitted to the second control device 22 by the first control devices 21. Based on a charge/discharge power instruction value of the power storage system 1 received from the host server 7 and the information regarding the states of the plurality of strings ST1-STx received from the plurality of first control devices 21, a charge/discharge power instruction values to be allocated to each of the plurality of strings ST1-STx is calculated and transmitted to the first control device 21 by the second control device 22.SELECTED DRAWING: Figure 4 【課題】大規模な蓄電システムにおいても蓄電量を蓄電池ストリングの単位と蓄電池の単位とで管理すると共に、制御装置の処理負荷を適切に抑える。【解決手段】蓄電池制御装置2は、ストリングST1~STx毎に設けられ、ストリング補器5を制御する複数の第1制御装置21と、複数の第1制御装置21と蓄電システム1外の上位サーバー7と通信する第2制御装置22とを備える。第1制御装置21は、ストリングST1~STxの状態についての情報を取得して第2制御装置22に送信する。第2制御装置22は、上位サーバー7から受信する蓄電システム1の充放電電力指示値と、複数の第1制御装置21から受信する複数のストリングST1~STxの状態についての情報とに基づいて、複数のストリングST1~STxのそれぞれに割り当てる充放電電力指示値を算出して第1制御装置21に送信する。【選択図】図4</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAODvEPcnR3VXByDAlxDYpUcPb3Cwny91FwDAhwDHIMCQ3WUXD0c1EI8A93DVKAKQ6ODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGRiYG5ubmRgaOxkQpAgBNnyn8</recordid><startdate>20240610</startdate><enddate>20240610</enddate><creator>SHODA TAKAHIRO</creator><scope>EVB</scope></search><sort><creationdate>20240610</creationdate><title>STORAGE BATTERY CONTROL APPARATUS, AND POWER STORAGE SYSTEM</title><author>SHODA TAKAHIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2024077720A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2024</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>SHODA TAKAHIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHODA TAKAHIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>STORAGE BATTERY CONTROL APPARATUS, AND POWER STORAGE SYSTEM</title><date>2024-06-10</date><risdate>2024</risdate><abstract>To manage the amount of stored power in units of storage battery strings and in units of storage batteries even in a large-scale power storage system and appropriately suppress the processing load of a control device.SOLUTION: A storage battery control apparatus 2 comprises: a plurality of first control devices 21 provided for each of strings ST1-STx and controlling a string auxiliary unit 5; and a second control device 22 communicating with the plurality of first control devices 21 and a host server 7 outside of a power storage system 1. Information regarding the states of the strings ST1-STx is acquired and transmitted to the second control device 22 by the first control devices 21. Based on a charge/discharge power instruction value of the power storage system 1 received from the host server 7 and the information regarding the states of the plurality of strings ST1-STx received from the plurality of first control devices 21, a charge/discharge power instruction values to be allocated to each of the plurality of strings ST1-STx is calculated and transmitted to the first control device 21 by the second control device 22.SELECTED DRAWING: Figure 4 【課題】大規模な蓄電システムにおいても蓄電量を蓄電池ストリングの単位と蓄電池の単位とで管理すると共に、制御装置の処理負荷を適切に抑える。【解決手段】蓄電池制御装置2は、ストリングST1~STx毎に設けられ、ストリング補器5を制御する複数の第1制御装置21と、複数の第1制御装置21と蓄電システム1外の上位サーバー7と通信する第2制御装置22とを備える。第1制御装置21は、ストリングST1~STxの状態についての情報を取得して第2制御装置22に送信する。第2制御装置22は、上位サーバー7から受信する蓄電システム1の充放電電力指示値と、複数の第1制御装置21から受信する複数のストリングST1~STxの状態についての情報とに基づいて、複数のストリングST1~STxのそれぞれに割り当てる充放電電力指示値を算出して第1制御装置21に送信する。【選択図】図4</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; jpn
recordid cdi_epo_espacenet_JP2024077720A
source esp@cenet
subjects CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERATION
SYSTEMS FOR STORING ELECTRIC ENERGY
title STORAGE BATTERY CONTROL APPARATUS, AND POWER STORAGE SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T14%3A06%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHODA%20TAKAHIRO&rft.date=2024-06-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2024077720A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true