PILE FOUNDATION STRUCTURE
To provide a technology capable of improving construction efficiency and economic efficiency while ensuring safety in a pile foundation structure including a plurality of piles, a first pile and a second pile having different configurations of pile cap joints.SOLUTION: The degree of fixation of a pi...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TANAKA KENJI IWAI YUICHI INUYAMA TAKAHIRO TAKAYAMA HIDETOSHI TANAKA ISSEI |
description | To provide a technology capable of improving construction efficiency and economic efficiency while ensuring safety in a pile foundation structure including a plurality of piles, a first pile and a second pile having different configurations of pile cap joints.SOLUTION: The degree of fixation of a pile cap 11 of a first pile 10 to a concrete foundation 5 at a pile cap joint 15 is set to be smaller than that of a pile cap 21 of a second pile 20 to the concrete foundation 5 at a pile cap joint 25. The pull-out resistance of the pile cap 11 of the first pile 10 against the concrete foundation 5 at the pile cap joint 15 is set to be larger than that of the pile cap 21 of the second pile 20 against the concrete foundation 5 at the pile cap joint 25.SELECTED DRAWING: Figure 1
【課題】複数の杭として杭頭接合部の構成が互いに異なる第1杭及び第2杭を備えた杭基礎構造において、安全性を確保しながら、施工性及び経済性を向上可能な技術を提供する。【解決手段】杭頭接合部15,25におけるコンクリート基礎5に対する杭頭11,21の固定度については、第1杭10が前記第2杭20よりも小さいものに設定されており、杭頭接合部15,25におけるコンクリート基礎5に対する杭頭11,21の引抜抵抗力については、第1杭10が第2杭20よりも大きいものに設定されている。【選択図】図1 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2024017101A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2024017101A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2024017101A3</originalsourceid><addsrcrecordid>eNrjZJAM8PRxVXDzD_VzcQzx9PdTCA4JCnUOCQ1y5WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgZGJgaG5oYGho7GRCkCAGSuIIo</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PILE FOUNDATION STRUCTURE</title><source>esp@cenet</source><creator>TANAKA KENJI ; IWAI YUICHI ; INUYAMA TAKAHIRO ; TAKAYAMA HIDETOSHI ; TANAKA ISSEI</creator><creatorcontrib>TANAKA KENJI ; IWAI YUICHI ; INUYAMA TAKAHIRO ; TAKAYAMA HIDETOSHI ; TANAKA ISSEI</creatorcontrib><description>To provide a technology capable of improving construction efficiency and economic efficiency while ensuring safety in a pile foundation structure including a plurality of piles, a first pile and a second pile having different configurations of pile cap joints.SOLUTION: The degree of fixation of a pile cap 11 of a first pile 10 to a concrete foundation 5 at a pile cap joint 15 is set to be smaller than that of a pile cap 21 of a second pile 20 to the concrete foundation 5 at a pile cap joint 25. The pull-out resistance of the pile cap 11 of the first pile 10 against the concrete foundation 5 at the pile cap joint 15 is set to be larger than that of the pile cap 21 of the second pile 20 against the concrete foundation 5 at the pile cap joint 25.SELECTED DRAWING: Figure 1
【課題】複数の杭として杭頭接合部の構成が互いに異なる第1杭及び第2杭を備えた杭基礎構造において、安全性を確保しながら、施工性及び経済性を向上可能な技術を提供する。【解決手段】杭頭接合部15,25におけるコンクリート基礎5に対する杭頭11,21の固定度については、第1杭10が前記第2杭20よりも小さいものに設定されており、杭頭接合部15,25におけるコンクリート基礎5に対する杭頭11,21の引抜抵抗力については、第1杭10が第2杭20よりも大きいものに設定されている。【選択図】図1</description><language>eng ; jpn</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240208&DB=EPODOC&CC=JP&NR=2024017101A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240208&DB=EPODOC&CC=JP&NR=2024017101A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TANAKA KENJI</creatorcontrib><creatorcontrib>IWAI YUICHI</creatorcontrib><creatorcontrib>INUYAMA TAKAHIRO</creatorcontrib><creatorcontrib>TAKAYAMA HIDETOSHI</creatorcontrib><creatorcontrib>TANAKA ISSEI</creatorcontrib><title>PILE FOUNDATION STRUCTURE</title><description>To provide a technology capable of improving construction efficiency and economic efficiency while ensuring safety in a pile foundation structure including a plurality of piles, a first pile and a second pile having different configurations of pile cap joints.SOLUTION: The degree of fixation of a pile cap 11 of a first pile 10 to a concrete foundation 5 at a pile cap joint 15 is set to be smaller than that of a pile cap 21 of a second pile 20 to the concrete foundation 5 at a pile cap joint 25. The pull-out resistance of the pile cap 11 of the first pile 10 against the concrete foundation 5 at the pile cap joint 15 is set to be larger than that of the pile cap 21 of the second pile 20 against the concrete foundation 5 at the pile cap joint 25.SELECTED DRAWING: Figure 1
【課題】複数の杭として杭頭接合部の構成が互いに異なる第1杭及び第2杭を備えた杭基礎構造において、安全性を確保しながら、施工性及び経済性を向上可能な技術を提供する。【解決手段】杭頭接合部15,25におけるコンクリート基礎5に対する杭頭11,21の固定度については、第1杭10が前記第2杭20よりも小さいものに設定されており、杭頭接合部15,25におけるコンクリート基礎5に対する杭頭11,21の引抜抵抗力については、第1杭10が第2杭20よりも大きいものに設定されている。【選択図】図1</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJAM8PRxVXDzD_VzcQzx9PdTCA4JCnUOCQ1y5WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgZGJgaG5oYGho7GRCkCAGSuIIo</recordid><startdate>20240208</startdate><enddate>20240208</enddate><creator>TANAKA KENJI</creator><creator>IWAI YUICHI</creator><creator>INUYAMA TAKAHIRO</creator><creator>TAKAYAMA HIDETOSHI</creator><creator>TANAKA ISSEI</creator><scope>EVB</scope></search><sort><creationdate>20240208</creationdate><title>PILE FOUNDATION STRUCTURE</title><author>TANAKA KENJI ; IWAI YUICHI ; INUYAMA TAKAHIRO ; TAKAYAMA HIDETOSHI ; TANAKA ISSEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2024017101A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>TANAKA KENJI</creatorcontrib><creatorcontrib>IWAI YUICHI</creatorcontrib><creatorcontrib>INUYAMA TAKAHIRO</creatorcontrib><creatorcontrib>TAKAYAMA HIDETOSHI</creatorcontrib><creatorcontrib>TANAKA ISSEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TANAKA KENJI</au><au>IWAI YUICHI</au><au>INUYAMA TAKAHIRO</au><au>TAKAYAMA HIDETOSHI</au><au>TANAKA ISSEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PILE FOUNDATION STRUCTURE</title><date>2024-02-08</date><risdate>2024</risdate><abstract>To provide a technology capable of improving construction efficiency and economic efficiency while ensuring safety in a pile foundation structure including a plurality of piles, a first pile and a second pile having different configurations of pile cap joints.SOLUTION: The degree of fixation of a pile cap 11 of a first pile 10 to a concrete foundation 5 at a pile cap joint 15 is set to be smaller than that of a pile cap 21 of a second pile 20 to the concrete foundation 5 at a pile cap joint 25. The pull-out resistance of the pile cap 11 of the first pile 10 against the concrete foundation 5 at the pile cap joint 15 is set to be larger than that of the pile cap 21 of the second pile 20 against the concrete foundation 5 at the pile cap joint 25.SELECTED DRAWING: Figure 1
【課題】複数の杭として杭頭接合部の構成が互いに異なる第1杭及び第2杭を備えた杭基礎構造において、安全性を確保しながら、施工性及び経済性を向上可能な技術を提供する。【解決手段】杭頭接合部15,25におけるコンクリート基礎5に対する杭頭11,21の固定度については、第1杭10が前記第2杭20よりも小さいものに設定されており、杭頭接合部15,25におけるコンクリート基礎5に対する杭頭11,21の引抜抵抗力については、第1杭10が第2杭20よりも大きいものに設定されている。【選択図】図1</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2024017101A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | PILE FOUNDATION STRUCTURE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T22%3A45%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TANAKA%20KENJI&rft.date=2024-02-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2024017101A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |