PROCESS PLANNING DEVICE, PROCESS PLANNING SYSTEM, AND PROCESS PLANNING METHOD
To maintain a conscious state of a worker well to maintain production efficiency.SOLUTION: A process planning device includes: a mind evaluation unit which evaluates mind evaluation values indicative of conscious states of workers during tasks on the basis of indexes showing results of the tasks of...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | NAKANO TAKAHIRO UENO YUMIKO |
description | To maintain a conscious state of a worker well to maintain production efficiency.SOLUTION: A process planning device includes: a mind evaluation unit which evaluates mind evaluation values indicative of conscious states of workers during tasks on the basis of indexes showing results of the tasks of the workers; and a planning unit which, if the mind evaluation values do not satisfy a reference, plans a task assignment by which it is estimated that the mind evaluation values satisfy the reference, out of task assignments to the individual workers.SELECTED DRAWING: Figure 1
【課題】作業者の意識状態を良好に維持して生産効率を維持すること。【解決手段】作業者による作業の実績を示す指標に基づいて、前記作業を行ったときの前記作業者の意識状態を示すマインド評価値を評価するマインド評価部と、前記マインド評価値が基準を満たさない場合に、各々の前記作業者への作業の割り付けのうち、前記マインド評価値が前記基準を満たすと想定される作業の割り付けを計画する計画部とを有する工程計画装置。【選択図】図1 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2023175469A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2023175469A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2023175469A3</originalsourceid><addsrcrecordid>eNrjZPANCPJ3dg0OVgjwcfTz8_RzV3BxDfN0dtVRwJAIjgwOcfXVUXD0c8GU9HUN8fB34WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgZGxobmpiZmlo7GRCkCAEe0Lrk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PROCESS PLANNING DEVICE, PROCESS PLANNING SYSTEM, AND PROCESS PLANNING METHOD</title><source>esp@cenet</source><creator>NAKANO TAKAHIRO ; UENO YUMIKO</creator><creatorcontrib>NAKANO TAKAHIRO ; UENO YUMIKO</creatorcontrib><description>To maintain a conscious state of a worker well to maintain production efficiency.SOLUTION: A process planning device includes: a mind evaluation unit which evaluates mind evaluation values indicative of conscious states of workers during tasks on the basis of indexes showing results of the tasks of the workers; and a planning unit which, if the mind evaluation values do not satisfy a reference, plans a task assignment by which it is estimated that the mind evaluation values satisfy the reference, out of task assignments to the individual workers.SELECTED DRAWING: Figure 1
【課題】作業者の意識状態を良好に維持して生産効率を維持すること。【解決手段】作業者による作業の実績を示す指標に基づいて、前記作業を行ったときの前記作業者の意識状態を示すマインド評価値を評価するマインド評価部と、前記マインド評価値が基準を満たさない場合に、各々の前記作業者への作業の割り付けのうち、前記マインド評価値が前記基準を満たすと想定される作業の割り付けを計画する計画部とを有する工程計画装置。【選択図】図1</description><language>eng ; jpn</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231212&DB=EPODOC&CC=JP&NR=2023175469A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231212&DB=EPODOC&CC=JP&NR=2023175469A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NAKANO TAKAHIRO</creatorcontrib><creatorcontrib>UENO YUMIKO</creatorcontrib><title>PROCESS PLANNING DEVICE, PROCESS PLANNING SYSTEM, AND PROCESS PLANNING METHOD</title><description>To maintain a conscious state of a worker well to maintain production efficiency.SOLUTION: A process planning device includes: a mind evaluation unit which evaluates mind evaluation values indicative of conscious states of workers during tasks on the basis of indexes showing results of the tasks of the workers; and a planning unit which, if the mind evaluation values do not satisfy a reference, plans a task assignment by which it is estimated that the mind evaluation values satisfy the reference, out of task assignments to the individual workers.SELECTED DRAWING: Figure 1
【課題】作業者の意識状態を良好に維持して生産効率を維持すること。【解決手段】作業者による作業の実績を示す指標に基づいて、前記作業を行ったときの前記作業者の意識状態を示すマインド評価値を評価するマインド評価部と、前記マインド評価値が基準を満たさない場合に、各々の前記作業者への作業の割り付けのうち、前記マインド評価値が前記基準を満たすと想定される作業の割り付けを計画する計画部とを有する工程計画装置。【選択図】図1</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPANCPJ3dg0OVgjwcfTz8_RzV3BxDfN0dtVRwJAIjgwOcfXVUXD0c8GU9HUN8fB34WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgZGxobmpiZmlo7GRCkCAEe0Lrk</recordid><startdate>20231212</startdate><enddate>20231212</enddate><creator>NAKANO TAKAHIRO</creator><creator>UENO YUMIKO</creator><scope>EVB</scope></search><sort><creationdate>20231212</creationdate><title>PROCESS PLANNING DEVICE, PROCESS PLANNING SYSTEM, AND PROCESS PLANNING METHOD</title><author>NAKANO TAKAHIRO ; UENO YUMIKO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2023175469A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>NAKANO TAKAHIRO</creatorcontrib><creatorcontrib>UENO YUMIKO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NAKANO TAKAHIRO</au><au>UENO YUMIKO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PROCESS PLANNING DEVICE, PROCESS PLANNING SYSTEM, AND PROCESS PLANNING METHOD</title><date>2023-12-12</date><risdate>2023</risdate><abstract>To maintain a conscious state of a worker well to maintain production efficiency.SOLUTION: A process planning device includes: a mind evaluation unit which evaluates mind evaluation values indicative of conscious states of workers during tasks on the basis of indexes showing results of the tasks of the workers; and a planning unit which, if the mind evaluation values do not satisfy a reference, plans a task assignment by which it is estimated that the mind evaluation values satisfy the reference, out of task assignments to the individual workers.SELECTED DRAWING: Figure 1
【課題】作業者の意識状態を良好に維持して生産効率を維持すること。【解決手段】作業者による作業の実績を示す指標に基づいて、前記作業を行ったときの前記作業者の意識状態を示すマインド評価値を評価するマインド評価部と、前記マインド評価値が基準を満たさない場合に、各々の前記作業者への作業の割り付けのうち、前記マインド評価値が前記基準を満たすと想定される作業の割り付けを計画する計画部とを有する工程計画装置。【選択図】図1</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2023175469A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | PROCESS PLANNING DEVICE, PROCESS PLANNING SYSTEM, AND PROCESS PLANNING METHOD |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-23T08%3A39%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NAKANO%20TAKAHIRO&rft.date=2023-12-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2023175469A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |