CONCRETE PLACEMENT MANAGEMENT DEVICE, CONCRETE PLACEMENT MANAGEMENT METHOD, AND CONCRETE PLACEMENT MANAGEMENT PROGRAM
To provide a concrete placement management device capable of flexibly performing pour management.SOLUTION: The concrete placement management device includes: an acquisition unit that acquires a piece of 3D design information of a structure in which the 3D design information having split data in whic...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a concrete placement management device capable of flexibly performing pour management.SOLUTION: The concrete placement management device includes: an acquisition unit that acquires a piece of 3D design information of a structure in which the 3D design information having split data in which the 3D design information of the structure is divided into large blocks of a predetermined size and each large block is divided into small blocks of a predetermined size; a first pouring time measuring unit that measures the first pouring time, which is the elapsed time from the start of pouring when the first concrete is poured in a first small block among the small blocks during pouring concrete according to the acquired 3D design information; and a second pouring time measuring unit that measures the time, after changing the first pouring time of the first small block to the second pouring time which is the elapsed time from the start of pouring the second concrete for the second small block, when there is a second small block that is not poured in contact with the top surface, and a third small block that is not poured in contact with the side surface with respect to the first small block and the second concrete is poured in a second small block prior to the third small block.SELECTED DRAWING: Figure 2
【課題】柔軟な打設管理を行うコンクリート打設管理装置を提供する。【解決手段】コンクリート打設管理装置は、構造物の3次元設計情報を所定サイズの大ブロックに区分し、大ブロックの夫々を所定サイズの小ブロックに分割した分割データを有する3次元設計情報を取得する取得部と、取得した3次元設計情報に従ってコンクリートを打設している間、小ブロックのうち第1小ブロックに第1コンクリートが打設された場合、打設開始からの経過時間である第1打設時間を計時する第1打設時間計時部と、第1小ブロックに対して、上面に接する未打設の第2小ブロック、側面に接する未打設の第3小ブロックが存在し、第3小ブロックに優先して第2小ブロックに第2コンクリートが打設された場合、第1小ブロックの第1打設時間を第2小ブロックに対する第2コンクリートの打設開始からの経過時間である第2打設時間に置き換えて計時する第2打設時間計時部と、を備える。【選択図】図2 |
---|