AIR CONDITIONING SYSTEM

To provide an air conditioning system enabling reducing on-site adjustment work.SOLUTION: An air conditioning system 1 includes: a front chamber 3 of an air-conditioned chamber 2; first purification and air supply means 9 that is provided between the air-conditioned chamber 2 and the front chamber 3...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KOMODA YUJI, KONNO YASUHIKO, SAKAI NORITAKA, OTA KYOHEI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KOMODA YUJI
KONNO YASUHIKO
SAKAI NORITAKA
OTA KYOHEI
description To provide an air conditioning system enabling reducing on-site adjustment work.SOLUTION: An air conditioning system 1 includes: a front chamber 3 of an air-conditioned chamber 2; first purification and air supply means 9 that is provided between the air-conditioned chamber 2 and the front chamber 3 and purifies air in the front chamber 3 and supplies the air to the air-conditioned chamber 2; a first air conditioner AC1; and a humidity control device 10. The first air conditioner AC1 includes a first indoor unit 4 and a first outdoor unit 5. The first indoor unit 4 and the humidity control device 10 are accommodated in the front chamber 3, and the first outdoor unit 5 is installed outside the front chamber 3 and the air-conditioned chamber 2.SELECTED DRAWING: Figure 1 【課題】現場での調整作業を削減することが可能な空調システムを提供する。【解決手段】空調システム1は、空調対象室2の前室3と、空調対象室2と前室3との間に設けられ、前室3の空気を浄化して空調対象室2に給気する第1の浄化給気手段9と、第1のエアコンディショナーAC1と、湿度調整装置10と、を有している。第1のエアコンディショナーAC1は、第1の室内機4と第1の室外機5とを有している。第1の室内機4と湿度調整装置10は前室3に収容され、第1の室外機5は前室3及び空調対象室2の外部に設置されている。【選択図】図1
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2023000818A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2023000818A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2023000818A3</originalsourceid><addsrcrecordid>eNrjZBB39AxScPb3c_EM8fT38_RzVwiODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGRsYGBgYWhhaOxkQpAgAY2x_o</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>AIR CONDITIONING SYSTEM</title><source>esp@cenet</source><creator>KOMODA YUJI ; KONNO YASUHIKO ; SAKAI NORITAKA ; OTA KYOHEI</creator><creatorcontrib>KOMODA YUJI ; KONNO YASUHIKO ; SAKAI NORITAKA ; OTA KYOHEI</creatorcontrib><description>To provide an air conditioning system enabling reducing on-site adjustment work.SOLUTION: An air conditioning system 1 includes: a front chamber 3 of an air-conditioned chamber 2; first purification and air supply means 9 that is provided between the air-conditioned chamber 2 and the front chamber 3 and purifies air in the front chamber 3 and supplies the air to the air-conditioned chamber 2; a first air conditioner AC1; and a humidity control device 10. The first air conditioner AC1 includes a first indoor unit 4 and a first outdoor unit 5. The first indoor unit 4 and the humidity control device 10 are accommodated in the front chamber 3, and the first outdoor unit 5 is installed outside the front chamber 3 and the air-conditioned chamber 2.SELECTED DRAWING: Figure 1 【課題】現場での調整作業を削減することが可能な空調システムを提供する。【解決手段】空調システム1は、空調対象室2の前室3と、空調対象室2と前室3との間に設けられ、前室3の空気を浄化して空調対象室2に給気する第1の浄化給気手段9と、第1のエアコンディショナーAC1と、湿度調整装置10と、を有している。第1のエアコンディショナーAC1は、第1の室内機4と第1の室外機5とを有している。第1の室内機4と湿度調整装置10は前室3に収容され、第1の室外機5は前室3及び空調対象室2の外部に設置されている。【選択図】図1</description><language>eng ; jpn</language><subject>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING ; BLASTING ; HEATING ; LIGHTING ; MECHANICAL ENGINEERING ; RANGES ; VENTILATING ; WEAPONS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230104&amp;DB=EPODOC&amp;CC=JP&amp;NR=2023000818A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,782,887,25571,76555</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230104&amp;DB=EPODOC&amp;CC=JP&amp;NR=2023000818A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KOMODA YUJI</creatorcontrib><creatorcontrib>KONNO YASUHIKO</creatorcontrib><creatorcontrib>SAKAI NORITAKA</creatorcontrib><creatorcontrib>OTA KYOHEI</creatorcontrib><title>AIR CONDITIONING SYSTEM</title><description>To provide an air conditioning system enabling reducing on-site adjustment work.SOLUTION: An air conditioning system 1 includes: a front chamber 3 of an air-conditioned chamber 2; first purification and air supply means 9 that is provided between the air-conditioned chamber 2 and the front chamber 3 and purifies air in the front chamber 3 and supplies the air to the air-conditioned chamber 2; a first air conditioner AC1; and a humidity control device 10. The first air conditioner AC1 includes a first indoor unit 4 and a first outdoor unit 5. The first indoor unit 4 and the humidity control device 10 are accommodated in the front chamber 3, and the first outdoor unit 5 is installed outside the front chamber 3 and the air-conditioned chamber 2.SELECTED DRAWING: Figure 1 【課題】現場での調整作業を削減することが可能な空調システムを提供する。【解決手段】空調システム1は、空調対象室2の前室3と、空調対象室2と前室3との間に設けられ、前室3の空気を浄化して空調対象室2に給気する第1の浄化給気手段9と、第1のエアコンディショナーAC1と、湿度調整装置10と、を有している。第1のエアコンディショナーAC1は、第1の室内機4と第1の室外機5とを有している。第1の室内機4と湿度調整装置10は前室3に収容され、第1の室外機5は前室3及び空調対象室2の外部に設置されている。【選択図】図1</description><subject>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING</subject><subject>BLASTING</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>RANGES</subject><subject>VENTILATING</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBB39AxScPb3c_EM8fT38_RzVwiODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGRsYGBgYWhhaOxkQpAgAY2x_o</recordid><startdate>20230104</startdate><enddate>20230104</enddate><creator>KOMODA YUJI</creator><creator>KONNO YASUHIKO</creator><creator>SAKAI NORITAKA</creator><creator>OTA KYOHEI</creator><scope>EVB</scope></search><sort><creationdate>20230104</creationdate><title>AIR CONDITIONING SYSTEM</title><author>KOMODA YUJI ; KONNO YASUHIKO ; SAKAI NORITAKA ; OTA KYOHEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2023000818A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2023</creationdate><topic>AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING</topic><topic>BLASTING</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>RANGES</topic><topic>VENTILATING</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>KOMODA YUJI</creatorcontrib><creatorcontrib>KONNO YASUHIKO</creatorcontrib><creatorcontrib>SAKAI NORITAKA</creatorcontrib><creatorcontrib>OTA KYOHEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KOMODA YUJI</au><au>KONNO YASUHIKO</au><au>SAKAI NORITAKA</au><au>OTA KYOHEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>AIR CONDITIONING SYSTEM</title><date>2023-01-04</date><risdate>2023</risdate><abstract>To provide an air conditioning system enabling reducing on-site adjustment work.SOLUTION: An air conditioning system 1 includes: a front chamber 3 of an air-conditioned chamber 2; first purification and air supply means 9 that is provided between the air-conditioned chamber 2 and the front chamber 3 and purifies air in the front chamber 3 and supplies the air to the air-conditioned chamber 2; a first air conditioner AC1; and a humidity control device 10. The first air conditioner AC1 includes a first indoor unit 4 and a first outdoor unit 5. The first indoor unit 4 and the humidity control device 10 are accommodated in the front chamber 3, and the first outdoor unit 5 is installed outside the front chamber 3 and the air-conditioned chamber 2.SELECTED DRAWING: Figure 1 【課題】現場での調整作業を削減することが可能な空調システムを提供する。【解決手段】空調システム1は、空調対象室2の前室3と、空調対象室2と前室3との間に設けられ、前室3の空気を浄化して空調対象室2に給気する第1の浄化給気手段9と、第1のエアコンディショナーAC1と、湿度調整装置10と、を有している。第1のエアコンディショナーAC1は、第1の室内機4と第1の室外機5とを有している。第1の室内機4と湿度調整装置10は前室3に収容され、第1の室外機5は前室3及び空調対象室2の外部に設置されている。【選択図】図1</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; jpn
recordid cdi_epo_espacenet_JP2023000818A
source esp@cenet
subjects AIR-CONDITIONING, AIR-HUMIDIFICATION, VENTILATION, USE OF AIRCURRENTS FOR SCREENING
BLASTING
HEATING
LIGHTING
MECHANICAL ENGINEERING
RANGES
VENTILATING
WEAPONS
title AIR CONDITIONING SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-04T12%3A45%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KOMODA%20YUJI&rft.date=2023-01-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2023000818A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true