BUILDING CONSTRUCTION METHOD AND BUILDING CONSTRUCTION SYSTEM
To provide a building construction method and a building construction system for controlling the carry-in timing of a member while appropriately managing the member by utilizing a plurality of warehouses.SOLUTION: Disclosed is a building construction method in which construction of the building is m...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SAITO HIROYUKI WAKABAYASHI MIKI |
description | To provide a building construction method and a building construction system for controlling the carry-in timing of a member while appropriately managing the member by utilizing a plurality of warehouses.SOLUTION: Disclosed is a building construction method in which construction of the building is managed by utilizing a computer. Based on information on a member associated with identification information automatically applied to the member of a building, the computer at least performs a determination step S01 of determining a building or a warehouse into which the member is carried from among at least one or more warehouses installed at the building and in the vicinity of the building, and a management step S02 of managing the member carried into the building or the warehouse based on the identification information.SELECTED DRAWING: Figure 1
【課題】複数の倉庫を利用して部材を適切に管理しつつ、部材の搬入タイミングを制御する建築物施工方法、建築物施工システムを提供する。【解決手段】コンピュータを利用して建築物の施工を管理する建築物施工方法であって、コンピュータが、建築物の部材に対して自動的に付与した識別情報と対応づけた部材に関する情報に基づいて、建築物及び建築物の近傍に設置されている少なくとも1か所以上の倉庫の中から、部材が搬入される建築物又は倉庫を判定する判定段階S01と、識別情報に基づいて、建築物又は倉庫に搬入されている部材を管理する管理段階S02と、を少なくとも行う。【選択図】図1 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2021096733A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2021096733A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2021096733A3</originalsourceid><addsrcrecordid>eNrjZLB1CvX0cfH0c1dw9vcLDgkKdQ7x9PdT8HUN8fB3UXD0c1HAriA4MjjE1ZeHgTUtMac4lRdKczMoubmGOHvophbkx6cWFyQmp-allsR7BRgZGBkaWJqZGxs7GhOlCAC4ICrF</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>BUILDING CONSTRUCTION METHOD AND BUILDING CONSTRUCTION SYSTEM</title><source>esp@cenet</source><creator>SAITO HIROYUKI ; WAKABAYASHI MIKI</creator><creatorcontrib>SAITO HIROYUKI ; WAKABAYASHI MIKI</creatorcontrib><description>To provide a building construction method and a building construction system for controlling the carry-in timing of a member while appropriately managing the member by utilizing a plurality of warehouses.SOLUTION: Disclosed is a building construction method in which construction of the building is managed by utilizing a computer. Based on information on a member associated with identification information automatically applied to the member of a building, the computer at least performs a determination step S01 of determining a building or a warehouse into which the member is carried from among at least one or more warehouses installed at the building and in the vicinity of the building, and a management step S02 of managing the member carried into the building or the warehouse based on the identification information.SELECTED DRAWING: Figure 1
【課題】複数の倉庫を利用して部材を適切に管理しつつ、部材の搬入タイミングを制御する建築物施工方法、建築物施工システムを提供する。【解決手段】コンピュータを利用して建築物の施工を管理する建築物施工方法であって、コンピュータが、建築物の部材に対して自動的に付与した識別情報と対応づけた部材に関する情報に基づいて、建築物及び建築物の近傍に設置されている少なくとも1か所以上の倉庫の中から、部材が搬入される建築物又は倉庫を判定する判定段階S01と、識別情報に基づいて、建築物又は倉庫に搬入されている部材を管理する管理段階S02と、を少なくとも行う。【選択図】図1</description><language>eng ; jpn</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210624&DB=EPODOC&CC=JP&NR=2021096733A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210624&DB=EPODOC&CC=JP&NR=2021096733A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SAITO HIROYUKI</creatorcontrib><creatorcontrib>WAKABAYASHI MIKI</creatorcontrib><title>BUILDING CONSTRUCTION METHOD AND BUILDING CONSTRUCTION SYSTEM</title><description>To provide a building construction method and a building construction system for controlling the carry-in timing of a member while appropriately managing the member by utilizing a plurality of warehouses.SOLUTION: Disclosed is a building construction method in which construction of the building is managed by utilizing a computer. Based on information on a member associated with identification information automatically applied to the member of a building, the computer at least performs a determination step S01 of determining a building or a warehouse into which the member is carried from among at least one or more warehouses installed at the building and in the vicinity of the building, and a management step S02 of managing the member carried into the building or the warehouse based on the identification information.SELECTED DRAWING: Figure 1
【課題】複数の倉庫を利用して部材を適切に管理しつつ、部材の搬入タイミングを制御する建築物施工方法、建築物施工システムを提供する。【解決手段】コンピュータを利用して建築物の施工を管理する建築物施工方法であって、コンピュータが、建築物の部材に対して自動的に付与した識別情報と対応づけた部材に関する情報に基づいて、建築物及び建築物の近傍に設置されている少なくとも1か所以上の倉庫の中から、部材が搬入される建築物又は倉庫を判定する判定段階S01と、識別情報に基づいて、建築物又は倉庫に搬入されている部材を管理する管理段階S02と、を少なくとも行う。【選択図】図1</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB1CvX0cfH0c1dw9vcLDgkKdQ7x9PdT8HUN8fB3UXD0c1HAriA4MjjE1ZeHgTUtMac4lRdKczMoubmGOHvophbkx6cWFyQmp-allsR7BRgZGBkaWJqZGxs7GhOlCAC4ICrF</recordid><startdate>20210624</startdate><enddate>20210624</enddate><creator>SAITO HIROYUKI</creator><creator>WAKABAYASHI MIKI</creator><scope>EVB</scope></search><sort><creationdate>20210624</creationdate><title>BUILDING CONSTRUCTION METHOD AND BUILDING CONSTRUCTION SYSTEM</title><author>SAITO HIROYUKI ; WAKABAYASHI MIKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2021096733A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2021</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>SAITO HIROYUKI</creatorcontrib><creatorcontrib>WAKABAYASHI MIKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SAITO HIROYUKI</au><au>WAKABAYASHI MIKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>BUILDING CONSTRUCTION METHOD AND BUILDING CONSTRUCTION SYSTEM</title><date>2021-06-24</date><risdate>2021</risdate><abstract>To provide a building construction method and a building construction system for controlling the carry-in timing of a member while appropriately managing the member by utilizing a plurality of warehouses.SOLUTION: Disclosed is a building construction method in which construction of the building is managed by utilizing a computer. Based on information on a member associated with identification information automatically applied to the member of a building, the computer at least performs a determination step S01 of determining a building or a warehouse into which the member is carried from among at least one or more warehouses installed at the building and in the vicinity of the building, and a management step S02 of managing the member carried into the building or the warehouse based on the identification information.SELECTED DRAWING: Figure 1
【課題】複数の倉庫を利用して部材を適切に管理しつつ、部材の搬入タイミングを制御する建築物施工方法、建築物施工システムを提供する。【解決手段】コンピュータを利用して建築物の施工を管理する建築物施工方法であって、コンピュータが、建築物の部材に対して自動的に付与した識別情報と対応づけた部材に関する情報に基づいて、建築物及び建築物の近傍に設置されている少なくとも1か所以上の倉庫の中から、部材が搬入される建築物又は倉庫を判定する判定段階S01と、識別情報に基づいて、建築物又は倉庫に搬入されている部材を管理する管理段階S02と、を少なくとも行う。【選択図】図1</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2021096733A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | BUILDING CONSTRUCTION METHOD AND BUILDING CONSTRUCTION SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T10%3A02%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SAITO%20HIROYUKI&rft.date=2021-06-24&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2021096733A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |