HEAT PUMP SYSTEM
To provide a technique capable of performing boiling-up operation so that a heating value of water in a tank reaches a reference heating value before scheduled time.SOLUTION: A heat pump system is configured to execute first operation to start boiling-up operation at a first time that is a first pre...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | AKAGI NOBUYUKI |
description | To provide a technique capable of performing boiling-up operation so that a heating value of water in a tank reaches a reference heating value before scheduled time.SOLUTION: A heat pump system is configured to execute first operation to start boiling-up operation at a first time that is a first predetermined time before a predetermined scheduled time in one day, and second operation to start boiling-up operation at a second time that is a second predetermined time before the first time in one day. The control part counts how many times heating values of water in a tank do not reach a predetermined reference heating value before the scheduled time, and executes the second operation when executing the boiling-up operation when the count is equal to or larger than the predetermined first reference number of times.SELECTED DRAWING: Figure 1
【課題】タンク内の水の熱量が予定時刻までに基準熱量に達するように沸き上げ運転を実行することができる技術を提供する。【解決手段】ヒートポンプシステムは、1日のうちの所定の予定時刻よりも第1の所定時間前の第1の時刻に前記沸き上げ運転を開始する第1の運転と、1日のうちの前記第1の時刻よりも第2の所定時間前の第2の時刻に前記沸き上げ運転を開始する第2の運転と、を実行可能に構成されている。前記制御部は、前記沸き上げ運転において前記タンク内の水の熱量が前記予定時刻までに所定の基準熱量に達しない場合の回数を計数し、計数した回数が所定の第1の基準回数以上である場合は、前記沸き上げ運転を実行するときに前記第2の運転を実行する。【選択図】図1 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2021060142A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2021060142A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2021060142A3</originalsourceid><addsrcrecordid>eNrjZBDwcHUMUQgI9Q1QCI4MDnH15WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgZGhgZmBoYmRo7GRCkCADocHdg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>HEAT PUMP SYSTEM</title><source>esp@cenet</source><creator>AKAGI NOBUYUKI</creator><creatorcontrib>AKAGI NOBUYUKI</creatorcontrib><description>To provide a technique capable of performing boiling-up operation so that a heating value of water in a tank reaches a reference heating value before scheduled time.SOLUTION: A heat pump system is configured to execute first operation to start boiling-up operation at a first time that is a first predetermined time before a predetermined scheduled time in one day, and second operation to start boiling-up operation at a second time that is a second predetermined time before the first time in one day. The control part counts how many times heating values of water in a tank do not reach a predetermined reference heating value before the scheduled time, and executes the second operation when executing the boiling-up operation when the count is equal to or larger than the predetermined first reference number of times.SELECTED DRAWING: Figure 1
【課題】タンク内の水の熱量が予定時刻までに基準熱量に達するように沸き上げ運転を実行することができる技術を提供する。【解決手段】ヒートポンプシステムは、1日のうちの所定の予定時刻よりも第1の所定時間前の第1の時刻に前記沸き上げ運転を開始する第1の運転と、1日のうちの前記第1の時刻よりも第2の所定時間前の第2の時刻に前記沸き上げ運転を開始する第2の運転と、を実行可能に構成されている。前記制御部は、前記沸き上げ運転において前記タンク内の水の熱量が前記予定時刻までに所定の基準熱量に達しない場合の回数を計数し、計数した回数が所定の第1の基準回数以上である場合は、前記沸き上げ運転を実行するときに前記第2の運転を実行する。【選択図】図1</description><language>eng ; jpn</language><subject>BLASTING ; FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEATGENERATING MEANS, IN GENERAL ; HEATING ; LIGHTING ; MECHANICAL ENGINEERING ; RANGES ; VENTILATING ; WEAPONS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210415&DB=EPODOC&CC=JP&NR=2021060142A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210415&DB=EPODOC&CC=JP&NR=2021060142A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>AKAGI NOBUYUKI</creatorcontrib><title>HEAT PUMP SYSTEM</title><description>To provide a technique capable of performing boiling-up operation so that a heating value of water in a tank reaches a reference heating value before scheduled time.SOLUTION: A heat pump system is configured to execute first operation to start boiling-up operation at a first time that is a first predetermined time before a predetermined scheduled time in one day, and second operation to start boiling-up operation at a second time that is a second predetermined time before the first time in one day. The control part counts how many times heating values of water in a tank do not reach a predetermined reference heating value before the scheduled time, and executes the second operation when executing the boiling-up operation when the count is equal to or larger than the predetermined first reference number of times.SELECTED DRAWING: Figure 1
【課題】タンク内の水の熱量が予定時刻までに基準熱量に達するように沸き上げ運転を実行することができる技術を提供する。【解決手段】ヒートポンプシステムは、1日のうちの所定の予定時刻よりも第1の所定時間前の第1の時刻に前記沸き上げ運転を開始する第1の運転と、1日のうちの前記第1の時刻よりも第2の所定時間前の第2の時刻に前記沸き上げ運転を開始する第2の運転と、を実行可能に構成されている。前記制御部は、前記沸き上げ運転において前記タンク内の水の熱量が前記予定時刻までに所定の基準熱量に達しない場合の回数を計数し、計数した回数が所定の第1の基準回数以上である場合は、前記沸き上げ運転を実行するときに前記第2の運転を実行する。【選択図】図1</description><subject>BLASTING</subject><subject>FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEATGENERATING MEANS, IN GENERAL</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>RANGES</subject><subject>VENTILATING</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBDwcHUMUQgI9Q1QCI4MDnH15WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgZGhgZmBoYmRo7GRCkCADocHdg</recordid><startdate>20210415</startdate><enddate>20210415</enddate><creator>AKAGI NOBUYUKI</creator><scope>EVB</scope></search><sort><creationdate>20210415</creationdate><title>HEAT PUMP SYSTEM</title><author>AKAGI NOBUYUKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2021060142A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2021</creationdate><topic>BLASTING</topic><topic>FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEATGENERATING MEANS, IN GENERAL</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>RANGES</topic><topic>VENTILATING</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>AKAGI NOBUYUKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>AKAGI NOBUYUKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>HEAT PUMP SYSTEM</title><date>2021-04-15</date><risdate>2021</risdate><abstract>To provide a technique capable of performing boiling-up operation so that a heating value of water in a tank reaches a reference heating value before scheduled time.SOLUTION: A heat pump system is configured to execute first operation to start boiling-up operation at a first time that is a first predetermined time before a predetermined scheduled time in one day, and second operation to start boiling-up operation at a second time that is a second predetermined time before the first time in one day. The control part counts how many times heating values of water in a tank do not reach a predetermined reference heating value before the scheduled time, and executes the second operation when executing the boiling-up operation when the count is equal to or larger than the predetermined first reference number of times.SELECTED DRAWING: Figure 1
【課題】タンク内の水の熱量が予定時刻までに基準熱量に達するように沸き上げ運転を実行することができる技術を提供する。【解決手段】ヒートポンプシステムは、1日のうちの所定の予定時刻よりも第1の所定時間前の第1の時刻に前記沸き上げ運転を開始する第1の運転と、1日のうちの前記第1の時刻よりも第2の所定時間前の第2の時刻に前記沸き上げ運転を開始する第2の運転と、を実行可能に構成されている。前記制御部は、前記沸き上げ運転において前記タンク内の水の熱量が前記予定時刻までに所定の基準熱量に達しない場合の回数を計数し、計数した回数が所定の第1の基準回数以上である場合は、前記沸き上げ運転を実行するときに前記第2の運転を実行する。【選択図】図1</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2021060142A |
source | esp@cenet |
subjects | BLASTING FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEATGENERATING MEANS, IN GENERAL HEATING LIGHTING MECHANICAL ENGINEERING RANGES VENTILATING WEAPONS |
title | HEAT PUMP SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T09%3A19%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=AKAGI%20NOBUYUKI&rft.date=2021-04-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2021060142A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |