WORK FLOOR FOR SHAFT CONSTRUCTION

To propose a work floor for shaft construction that can shorten the opening and closing time of an equipment loading door and simultaneously achieve fall prevention measures with a simple configuration.SOLUTION: The present invention comprises a stage 2 that can be accommodated in a shaft S, a recta...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHIMIZU YUSUKE, MINAMI KAZUNOBU
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SHIMIZU YUSUKE
MINAMI KAZUNOBU
description To propose a work floor for shaft construction that can shorten the opening and closing time of an equipment loading door and simultaneously achieve fall prevention measures with a simple configuration.SOLUTION: The present invention comprises a stage 2 that can be accommodated in a shaft S, a rectangular opening O in a plan view provided on the stage 2, a set of side plates 3 and 3 having a substantially inverted V shape in a side view erected along one of the opposite edges of the opening O, and a set of lid plates 5 and 5 rotatably installed around the other opposite edge of the opening O. The lid plates 5 and 5 are configured to cover the edges of the side plates 3 and 3 when the opening O is closed.SELECTED DRAWING: Figure 2 【課題】簡易な構成で、機材搬入用扉の開閉時間を短縮し、かつ墜落防止措置を同時に達成できる立坑工事用の作業床を提案すること。【解決手段】立坑Sに収容可能なステージ2と、ステージ2に設けられた平面視で矩形形状の開口部Oと、開口部Oの一方の対向する辺縁に沿って立設された側面視で略逆V字形状の一組の側板3,3と、開口部Oの他方の対向する辺縁を軸に回転自在に設置された一組の蓋板5,5と、を具備し、蓋板5,5は開口部Oの閉塞時に側板3,3の辺縁を覆うように構成されたこと。【選択図】図2
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2021042550A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2021042550A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2021042550A3</originalsourceid><addsrcrecordid>eNrjZFAM9w_yVnDz8fcPUnAD4mAPR7cQBWd_v-CQoFDnEE9_Px4G1rTEnOJUXijNzaDk5hri7KGbWpAfn1pckJicmpdaEu8VYGRgZGhgYmRqauBoTJQiAGeWIrM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>WORK FLOOR FOR SHAFT CONSTRUCTION</title><source>esp@cenet</source><creator>SHIMIZU YUSUKE ; MINAMI KAZUNOBU</creator><creatorcontrib>SHIMIZU YUSUKE ; MINAMI KAZUNOBU</creatorcontrib><description>To propose a work floor for shaft construction that can shorten the opening and closing time of an equipment loading door and simultaneously achieve fall prevention measures with a simple configuration.SOLUTION: The present invention comprises a stage 2 that can be accommodated in a shaft S, a rectangular opening O in a plan view provided on the stage 2, a set of side plates 3 and 3 having a substantially inverted V shape in a side view erected along one of the opposite edges of the opening O, and a set of lid plates 5 and 5 rotatably installed around the other opposite edge of the opening O. The lid plates 5 and 5 are configured to cover the edges of the side plates 3 and 3 when the opening O is closed.SELECTED DRAWING: Figure 2 【課題】簡易な構成で、機材搬入用扉の開閉時間を短縮し、かつ墜落防止措置を同時に達成できる立坑工事用の作業床を提案すること。【解決手段】立坑Sに収容可能なステージ2と、ステージ2に設けられた平面視で矩形形状の開口部Oと、開口部Oの一方の対向する辺縁に沿って立設された側面視で略逆V字形状の一組の側板3,3と、開口部Oの他方の対向する辺縁を軸に回転自在に設置された一組の蓋板5,5と、を具備し、蓋板5,5は開口部Oの閉塞時に側板3,3の辺縁を覆うように構成されたこと。【選択図】図2</description><language>eng ; jpn</language><subject>EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210318&amp;DB=EPODOC&amp;CC=JP&amp;NR=2021042550A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210318&amp;DB=EPODOC&amp;CC=JP&amp;NR=2021042550A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHIMIZU YUSUKE</creatorcontrib><creatorcontrib>MINAMI KAZUNOBU</creatorcontrib><title>WORK FLOOR FOR SHAFT CONSTRUCTION</title><description>To propose a work floor for shaft construction that can shorten the opening and closing time of an equipment loading door and simultaneously achieve fall prevention measures with a simple configuration.SOLUTION: The present invention comprises a stage 2 that can be accommodated in a shaft S, a rectangular opening O in a plan view provided on the stage 2, a set of side plates 3 and 3 having a substantially inverted V shape in a side view erected along one of the opposite edges of the opening O, and a set of lid plates 5 and 5 rotatably installed around the other opposite edge of the opening O. The lid plates 5 and 5 are configured to cover the edges of the side plates 3 and 3 when the opening O is closed.SELECTED DRAWING: Figure 2 【課題】簡易な構成で、機材搬入用扉の開閉時間を短縮し、かつ墜落防止措置を同時に達成できる立坑工事用の作業床を提案すること。【解決手段】立坑Sに収容可能なステージ2と、ステージ2に設けられた平面視で矩形形状の開口部Oと、開口部Oの一方の対向する辺縁に沿って立設された側面視で略逆V字形状の一組の側板3,3と、開口部Oの他方の対向する辺縁を軸に回転自在に設置された一組の蓋板5,5と、を具備し、蓋板5,5は開口部Oの閉塞時に側板3,3の辺縁を覆うように構成されたこと。【選択図】図2</description><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFAM9w_yVnDz8fcPUnAD4mAPR7cQBWd_v-CQoFDnEE9_Px4G1rTEnOJUXijNzaDk5hri7KGbWpAfn1pckJicmpdaEu8VYGRgZGhgYmRqauBoTJQiAGeWIrM</recordid><startdate>20210318</startdate><enddate>20210318</enddate><creator>SHIMIZU YUSUKE</creator><creator>MINAMI KAZUNOBU</creator><scope>EVB</scope></search><sort><creationdate>20210318</creationdate><title>WORK FLOOR FOR SHAFT CONSTRUCTION</title><author>SHIMIZU YUSUKE ; MINAMI KAZUNOBU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2021042550A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SHIMIZU YUSUKE</creatorcontrib><creatorcontrib>MINAMI KAZUNOBU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHIMIZU YUSUKE</au><au>MINAMI KAZUNOBU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>WORK FLOOR FOR SHAFT CONSTRUCTION</title><date>2021-03-18</date><risdate>2021</risdate><abstract>To propose a work floor for shaft construction that can shorten the opening and closing time of an equipment loading door and simultaneously achieve fall prevention measures with a simple configuration.SOLUTION: The present invention comprises a stage 2 that can be accommodated in a shaft S, a rectangular opening O in a plan view provided on the stage 2, a set of side plates 3 and 3 having a substantially inverted V shape in a side view erected along one of the opposite edges of the opening O, and a set of lid plates 5 and 5 rotatably installed around the other opposite edge of the opening O. The lid plates 5 and 5 are configured to cover the edges of the side plates 3 and 3 when the opening O is closed.SELECTED DRAWING: Figure 2 【課題】簡易な構成で、機材搬入用扉の開閉時間を短縮し、かつ墜落防止措置を同時に達成できる立坑工事用の作業床を提案すること。【解決手段】立坑Sに収容可能なステージ2と、ステージ2に設けられた平面視で矩形形状の開口部Oと、開口部Oの一方の対向する辺縁に沿って立設された側面視で略逆V字形状の一組の側板3,3と、開口部Oの他方の対向する辺縁を軸に回転自在に設置された一組の蓋板5,5と、を具備し、蓋板5,5は開口部Oの閉塞時に側板3,3の辺縁を覆うように構成されたこと。【選択図】図2</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; jpn
recordid cdi_epo_espacenet_JP2021042550A
source esp@cenet
subjects EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
SOIL SHIFTING
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title WORK FLOOR FOR SHAFT CONSTRUCTION
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T07%3A50%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHIMIZU%20YUSUKE&rft.date=2021-03-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2021042550A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true