METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER
To provide a method for replacing a horizontal member at a bending point of a steel tower, which can suitably release the stress of the horizontal member when removing the horizontal member at the bending point by a plat structure.SOLUTION: The method for replacing a horizontal member at a bending p...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | IMAIZUMI NORIHIKO MIKAMI YASUAKI SAITO YOSHIAKI OSONO TOMOAKI |
description | To provide a method for replacing a horizontal member at a bending point of a steel tower, which can suitably release the stress of the horizontal member when removing the horizontal member at the bending point by a plat structure.SOLUTION: The method for replacing a horizontal member at a bending point of a steel tower of the present invention is configured so that in a method for replacing a horizontal member at a bending point P of a steel tower 100 in which the stress of a horizontal member 106 is released and the horizontal member 106 is replaced by forming a plat structure Z using an oblique jig 200 and a horizontal jig 300, the plat structure Z is formed above and below the horizontal member 106 arranged horizontally at the bending point P of the tower 100, and at least one horizontal jig 300 of the upper and lower plat structure Z is placed in the vicinity of the horizontal member 106 at the bending point P.SELECTED DRAWING: Figure 1
【課題】プラット結構によって曲げ点の水平材を取り外す際の水平材の応力を好適に開放することが可能な鉄塔の曲げ点の水平材交換方法を提供することを目的とする。【解決手段】本発明の鉄塔の曲げ点の水平材交換方法の構成は、斜め治具200と水平治具300を用いてプラット結構Zを構成することにより水平材106の応力を開放して水平材106を交換する鉄塔100の曲げ点Pの水平材交換方法において、鉄塔100の曲げ点Pに水平に配置される水平材106の上下にプラット結構Zを構成し、上下のプラット結構Zの少なくとも一方の水平治具300を、曲げ点Pの水平材106の近傍に配置したことを特徴とする。【選択図】図1 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2020159132A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2020159132A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2020159132A3</originalsourceid><addsrcrecordid>eNrjZPDwdQ3x8HdRcPMPUghyDfBxdPb0c1fw8A_yjPL3C3H0UfB1DHEN8gQyHEMUnFz9XEDSAf6efiEK_m4KwSGurj4KIf7hrkE8DKxpiTnFqbxQmptByc01xNlDN7UgPz61uCAxOTUvtSTeK8DIwMjA0NTS0NjI0ZgoRQBTHS0k</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER</title><source>esp@cenet</source><creator>IMAIZUMI NORIHIKO ; MIKAMI YASUAKI ; SAITO YOSHIAKI ; OSONO TOMOAKI</creator><creatorcontrib>IMAIZUMI NORIHIKO ; MIKAMI YASUAKI ; SAITO YOSHIAKI ; OSONO TOMOAKI</creatorcontrib><description>To provide a method for replacing a horizontal member at a bending point of a steel tower, which can suitably release the stress of the horizontal member when removing the horizontal member at the bending point by a plat structure.SOLUTION: The method for replacing a horizontal member at a bending point of a steel tower of the present invention is configured so that in a method for replacing a horizontal member at a bending point P of a steel tower 100 in which the stress of a horizontal member 106 is released and the horizontal member 106 is replaced by forming a plat structure Z using an oblique jig 200 and a horizontal jig 300, the plat structure Z is formed above and below the horizontal member 106 arranged horizontally at the bending point P of the tower 100, and at least one horizontal jig 300 of the upper and lower plat structure Z is placed in the vicinity of the horizontal member 106 at the bending point P.SELECTED DRAWING: Figure 1
【課題】プラット結構によって曲げ点の水平材を取り外す際の水平材の応力を好適に開放することが可能な鉄塔の曲げ点の水平材交換方法を提供することを目的とする。【解決手段】本発明の鉄塔の曲げ点の水平材交換方法の構成は、斜め治具200と水平治具300を用いてプラット結構Zを構成することにより水平材106の応力を開放して水平材106を交換する鉄塔100の曲げ点Pの水平材交換方法において、鉄塔100の曲げ点Pに水平に配置される水平材106の上下にプラット結構Zを構成し、上下のプラット結構Zの少なくとも一方の水平治具300を、曲げ点Pの水平材106の近傍に配置したことを特徴とする。【選択図】図1</description><language>eng ; jpn</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; FENCING ; FIXED CONSTRUCTIONS ; FORMS ; GENERATION ; HANDLING BUILDING MATERIALS ON THE SITE ; INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES ; MASTS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SWIMMING OR SPLASH BATHS OR POOLS ; TENTS OR CANOPIES, IN GENERAL</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201001&DB=EPODOC&CC=JP&NR=2020159132A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201001&DB=EPODOC&CC=JP&NR=2020159132A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>IMAIZUMI NORIHIKO</creatorcontrib><creatorcontrib>MIKAMI YASUAKI</creatorcontrib><creatorcontrib>SAITO YOSHIAKI</creatorcontrib><creatorcontrib>OSONO TOMOAKI</creatorcontrib><title>METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER</title><description>To provide a method for replacing a horizontal member at a bending point of a steel tower, which can suitably release the stress of the horizontal member when removing the horizontal member at the bending point by a plat structure.SOLUTION: The method for replacing a horizontal member at a bending point of a steel tower of the present invention is configured so that in a method for replacing a horizontal member at a bending point P of a steel tower 100 in which the stress of a horizontal member 106 is released and the horizontal member 106 is replaced by forming a plat structure Z using an oblique jig 200 and a horizontal jig 300, the plat structure Z is formed above and below the horizontal member 106 arranged horizontally at the bending point P of the tower 100, and at least one horizontal jig 300 of the upper and lower plat structure Z is placed in the vicinity of the horizontal member 106 at the bending point P.SELECTED DRAWING: Figure 1
【課題】プラット結構によって曲げ点の水平材を取り外す際の水平材の応力を好適に開放することが可能な鉄塔の曲げ点の水平材交換方法を提供することを目的とする。【解決手段】本発明の鉄塔の曲げ点の水平材交換方法の構成は、斜め治具200と水平治具300を用いてプラット結構Zを構成することにより水平材106の応力を開放して水平材106を交換する鉄塔100の曲げ点Pの水平材交換方法において、鉄塔100の曲げ点Pに水平に配置される水平材106の上下にプラット結構Zを構成し、上下のプラット結構Zの少なくとも一方の水平治具300を、曲げ点Pの水平材106の近傍に配置したことを特徴とする。【選択図】図1</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>FENCING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>GENERATION</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</subject><subject>MASTS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SWIMMING OR SPLASH BATHS OR POOLS</subject><subject>TENTS OR CANOPIES, IN GENERAL</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPDwdQ3x8HdRcPMPUghyDfBxdPb0c1fw8A_yjPL3C3H0UfB1DHEN8gQyHEMUnFz9XEDSAf6efiEK_m4KwSGurj4KIf7hrkE8DKxpiTnFqbxQmptByc01xNlDN7UgPz61uCAxOTUvtSTeK8DIwMjA0NTS0NjI0ZgoRQBTHS0k</recordid><startdate>20201001</startdate><enddate>20201001</enddate><creator>IMAIZUMI NORIHIKO</creator><creator>MIKAMI YASUAKI</creator><creator>SAITO YOSHIAKI</creator><creator>OSONO TOMOAKI</creator><scope>EVB</scope></search><sort><creationdate>20201001</creationdate><title>METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER</title><author>IMAIZUMI NORIHIKO ; MIKAMI YASUAKI ; SAITO YOSHIAKI ; OSONO TOMOAKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2020159132A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2020</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>FENCING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>GENERATION</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</topic><topic>MASTS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SWIMMING OR SPLASH BATHS OR POOLS</topic><topic>TENTS OR CANOPIES, IN GENERAL</topic><toplevel>online_resources</toplevel><creatorcontrib>IMAIZUMI NORIHIKO</creatorcontrib><creatorcontrib>MIKAMI YASUAKI</creatorcontrib><creatorcontrib>SAITO YOSHIAKI</creatorcontrib><creatorcontrib>OSONO TOMOAKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>IMAIZUMI NORIHIKO</au><au>MIKAMI YASUAKI</au><au>SAITO YOSHIAKI</au><au>OSONO TOMOAKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER</title><date>2020-10-01</date><risdate>2020</risdate><abstract>To provide a method for replacing a horizontal member at a bending point of a steel tower, which can suitably release the stress of the horizontal member when removing the horizontal member at the bending point by a plat structure.SOLUTION: The method for replacing a horizontal member at a bending point of a steel tower of the present invention is configured so that in a method for replacing a horizontal member at a bending point P of a steel tower 100 in which the stress of a horizontal member 106 is released and the horizontal member 106 is replaced by forming a plat structure Z using an oblique jig 200 and a horizontal jig 300, the plat structure Z is formed above and below the horizontal member 106 arranged horizontally at the bending point P of the tower 100, and at least one horizontal jig 300 of the upper and lower plat structure Z is placed in the vicinity of the horizontal member 106 at the bending point P.SELECTED DRAWING: Figure 1
【課題】プラット結構によって曲げ点の水平材を取り外す際の水平材の応力を好適に開放することが可能な鉄塔の曲げ点の水平材交換方法を提供することを目的とする。【解決手段】本発明の鉄塔の曲げ点の水平材交換方法の構成は、斜め治具200と水平治具300を用いてプラット結構Zを構成することにより水平材106の応力を開放して水平材106を交換する鉄塔100の曲げ点Pの水平材交換方法において、鉄塔100の曲げ点Pに水平に配置される水平材106の上下にプラット結構Zを構成し、上下のプラット結構Zの少なくとも一方の水平治具300を、曲げ点Pの水平材106の近傍に配置したことを特徴とする。【選択図】図1</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2020159132A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ELECTRICITY FENCING FIXED CONSTRUCTIONS FORMS GENERATION HANDLING BUILDING MATERIALS ON THE SITE INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES MASTS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING SWIMMING OR SPLASH BATHS OR POOLS TENTS OR CANOPIES, IN GENERAL |
title | METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-10T15%3A10%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=IMAIZUMI%20NORIHIKO&rft.date=2020-10-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2020159132A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |