SLOPE CONSTRUCTION METHOD USING SHEET

To provide a slope construction method using a sheet, which is implemented as an emergency measure when a slope formed as a natural or artificial article collapses.SOLUTION: This slope construction method using a sheet includes: laying a first-stage protective sheet on a first-stage water-conveyance...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NAKAMURA NARUHIRO, NAKAMURA HIROYOSHI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a slope construction method using a sheet, which is implemented as an emergency measure when a slope formed as a natural or artificial article collapses.SOLUTION: This slope construction method using a sheet includes: laying a first-stage protective sheet on a first-stage water-conveyance sheet 21; implanting, into the ground, a first-stage draining tool 31 in a prescribed place near the upper side of the first-stage protective sheet; laying a second-stage protective sheet so as to be superposed on the upper side of the first-stage protective sheet with a prescribed width; implanting, into the ground, a second-stage draining tool in a prescribed place near the upper side of the second-stage protective sheet; and then fixing these components to a slope by fasteners, and repeating these steps of laying, implanting, fixing, etc. upwardly, until an n-th stage.SELECTED DRAWING: Figure 9 【課題】自然または人工物により形成されている斜面が崩壊した場合の応急処置として行われるシートを用いた斜面施工方法を提供する。【解決手段】シートを用いた斜面施工方法は、1段目導水シート21の上に1段目保護シートを敷設し、1段目保護シートの上側近傍の所定の箇所に1段目排水具31を土中に打ち込み、1段目保護シートの上辺に所定の幅で重ね合せて2段目保護シートを敷設し、2段目保護シートの上側近傍の所定の箇所に2段目排水具を土中に打ち込み、その後留め具で斜面に固定し、前記敷設、打ち込みや固定等の手順を上方に向かってn段目まで繰り返している。【選択図】図9