COMPOSITE COLUMN, BRIDGE PIER USING THE SAME, AND CONSTRUCTION METHOD

To provide a composite of a plurality of precast columns, bridge pier using same, and construction method that enables integration in a state where the plurality of precast columns are built without pouring cast-in-place concrete, and which enables each precast column to be built independently, sinc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: CHO IKEN
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHO IKEN
description To provide a composite of a plurality of precast columns, bridge pier using same, and construction method that enables integration in a state where the plurality of precast columns are built without pouring cast-in-place concrete, and which enables each precast column to be built independently, since the precast columns do not interfere with each other in a flat plane in a built state.SOLUTION: A composite pillar 1 has a plurality of precast columns 2, 2, 2, 2 which are bundled. A joint surface of the precast columns 2, 2, 2, 2 is provided with an engagement part 24 that can be engaged.SELECTED DRAWING: Figure 1 【課題】現場打ちコンクリートを打設せずとも複数のプレキャスト柱が建て込まれた状態における一体化を可能とし、また、建て込まれた状態でプレキャスト柱同士が平面的に干渉しないため、各プレキャスト柱を独立して建て込むことを可能とする複数のプレキャスト柱の合成及びそれを用いた橋脚、施工方法を提案すること。【解決手段】複数のプレキャスト柱2,2,2,2を束ねた合成柱1であって、プレキャスト柱2,2,2,2の接合面に、係合可能な係合部24が具備されていることを特徴とする。【選択図】図1
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2020056209A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2020056209A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2020056209A3</originalsourceid><addsrcrecordid>eNrjZHB19vcN8A_2DHFVcPb3CfX101FwCvJ0cXdVCPB0DVIIDfb0c1cI8XBVCHb0ddVRcPRzAarzCw4JCnUO8fT3U_B1DfHwd-FhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGRgYGpmZGBpaOxkQpAgC9MCw2</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>COMPOSITE COLUMN, BRIDGE PIER USING THE SAME, AND CONSTRUCTION METHOD</title><source>esp@cenet</source><creator>CHO IKEN</creator><creatorcontrib>CHO IKEN</creatorcontrib><description>To provide a composite of a plurality of precast columns, bridge pier using same, and construction method that enables integration in a state where the plurality of precast columns are built without pouring cast-in-place concrete, and which enables each precast column to be built independently, since the precast columns do not interfere with each other in a flat plane in a built state.SOLUTION: A composite pillar 1 has a plurality of precast columns 2, 2, 2, 2 which are bundled. A joint surface of the precast columns 2, 2, 2, 2 is provided with an engagement part 24 that can be engaged.SELECTED DRAWING: Figure 1 【課題】現場打ちコンクリートを打設せずとも複数のプレキャスト柱が建て込まれた状態における一体化を可能とし、また、建て込まれた状態でプレキャスト柱同士が平面的に干渉しないため、各プレキャスト柱を独立して建て込むことを可能とする複数のプレキャスト柱の合成及びそれを用いた橋脚、施工方法を提案すること。【解決手段】複数のプレキャスト柱2,2,2,2を束ねた合成柱1であって、プレキャスト柱2,2,2,2の接合面に、係合可能な係合部24が具備されていることを特徴とする。【選択図】図1</description><language>eng ; jpn</language><subject>ASSEMBLY OF BRIDGES ; BUILDING ; BUILDING MATERIALS ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS ; STRUCTURAL ELEMENTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200409&amp;DB=EPODOC&amp;CC=JP&amp;NR=2020056209A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76419</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200409&amp;DB=EPODOC&amp;CC=JP&amp;NR=2020056209A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHO IKEN</creatorcontrib><title>COMPOSITE COLUMN, BRIDGE PIER USING THE SAME, AND CONSTRUCTION METHOD</title><description>To provide a composite of a plurality of precast columns, bridge pier using same, and construction method that enables integration in a state where the plurality of precast columns are built without pouring cast-in-place concrete, and which enables each precast column to be built independently, since the precast columns do not interfere with each other in a flat plane in a built state.SOLUTION: A composite pillar 1 has a plurality of precast columns 2, 2, 2, 2 which are bundled. A joint surface of the precast columns 2, 2, 2, 2 is provided with an engagement part 24 that can be engaged.SELECTED DRAWING: Figure 1 【課題】現場打ちコンクリートを打設せずとも複数のプレキャスト柱が建て込まれた状態における一体化を可能とし、また、建て込まれた状態でプレキャスト柱同士が平面的に干渉しないため、各プレキャスト柱を独立して建て込むことを可能とする複数のプレキャスト柱の合成及びそれを用いた橋脚、施工方法を提案すること。【解決手段】複数のプレキャスト柱2,2,2,2を束ねた合成柱1であって、プレキャスト柱2,2,2,2の接合面に、係合可能な係合部24が具備されていることを特徴とする。【選択図】図1</description><subject>ASSEMBLY OF BRIDGES</subject><subject>BUILDING</subject><subject>BUILDING MATERIALS</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><subject>STRUCTURAL ELEMENTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB19vcN8A_2DHFVcPb3CfX101FwCvJ0cXdVCPB0DVIIDfb0c1cI8XBVCHb0ddVRcPRzAarzCw4JCnUO8fT3U_B1DfHwd-FhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGRgYGpmZGBpaOxkQpAgC9MCw2</recordid><startdate>20200409</startdate><enddate>20200409</enddate><creator>CHO IKEN</creator><scope>EVB</scope></search><sort><creationdate>20200409</creationdate><title>COMPOSITE COLUMN, BRIDGE PIER USING THE SAME, AND CONSTRUCTION METHOD</title><author>CHO IKEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2020056209A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>BUILDING</topic><topic>BUILDING MATERIALS</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><topic>STRUCTURAL ELEMENTS</topic><toplevel>online_resources</toplevel><creatorcontrib>CHO IKEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHO IKEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>COMPOSITE COLUMN, BRIDGE PIER USING THE SAME, AND CONSTRUCTION METHOD</title><date>2020-04-09</date><risdate>2020</risdate><abstract>To provide a composite of a plurality of precast columns, bridge pier using same, and construction method that enables integration in a state where the plurality of precast columns are built without pouring cast-in-place concrete, and which enables each precast column to be built independently, since the precast columns do not interfere with each other in a flat plane in a built state.SOLUTION: A composite pillar 1 has a plurality of precast columns 2, 2, 2, 2 which are bundled. A joint surface of the precast columns 2, 2, 2, 2 is provided with an engagement part 24 that can be engaged.SELECTED DRAWING: Figure 1 【課題】現場打ちコンクリートを打設せずとも複数のプレキャスト柱が建て込まれた状態における一体化を可能とし、また、建て込まれた状態でプレキャスト柱同士が平面的に干渉しないため、各プレキャスト柱を独立して建て込むことを可能とする複数のプレキャスト柱の合成及びそれを用いた橋脚、施工方法を提案すること。【解決手段】複数のプレキャスト柱2,2,2,2を束ねた合成柱1であって、プレキャスト柱2,2,2,2の接合面に、係合可能な係合部24が具備されていることを特徴とする。【選択図】図1</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; jpn
recordid cdi_epo_espacenet_JP2020056209A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
BUILDING
BUILDING MATERIALS
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
STRUCTURAL ELEMENTS
title COMPOSITE COLUMN, BRIDGE PIER USING THE SAME, AND CONSTRUCTION METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T05%3A29%3A55IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHO%20IKEN&rft.date=2020-04-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2020056209A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true