CONSTRUCTION EQUIPMENT
PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 1...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | IIMURO SATOSHI MORIMOTO TAKASHI KAWAGUCHI TAKAMASA HAGIWARA NOBUYUKI KAGA HIROTO |
description | PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 102 as monitoring objects, and when the monitoring section 112 detects no malfunction in the monitoring object, a control signal from the lever controller 102 is selected by a second changeover switch 111 and limit-free control current output from a first output stage 103 based on the control signal is output. On the other hand, when the monitoring section 112 detects malfunction in the monitoring objects, a control signal from a monitor controller 109 is selected by the second changeover switch 111 and limited control current output from the first output stage 103 based on the control signal is output by a current control section 113 in accordance with switching of a first changeover switch 105.SELECTED DRAWING: Figure 1
【課題】電気レバー方式の操作装置を備えた建設機械において、操作装置に異常が発生したときにも、安全を十分に確保した動作を実現する。【解決手段】監視部112は、レバー101およびレバーコントローラ102を監視対象として監視を行い、これらの異常を検出しないときには、第二の切り替えスイッチ111によりレバーコントローラ102からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を制限せずに出力する。一方、監視部112が監視対象の異常を検出したときには、第二の切り替えスイッチ111によりモニタコントローラ109からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を、第一の切り替えスイッチ105の切り替えに応じて、電流制限部113により制限して出力する。【選択図】図1 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2018053448A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2018053448A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2018053448A3</originalsourceid><addsrcrecordid>eNrjZBBz9vcLDgkKdQ7x9PdTcA0M9QzwdfUL4WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgaGFgamxiYmFo7GRCkCABg3H_o</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION EQUIPMENT</title><source>esp@cenet</source><creator>IIMURO SATOSHI ; MORIMOTO TAKASHI ; KAWAGUCHI TAKAMASA ; HAGIWARA NOBUYUKI ; KAGA HIROTO</creator><creatorcontrib>IIMURO SATOSHI ; MORIMOTO TAKASHI ; KAWAGUCHI TAKAMASA ; HAGIWARA NOBUYUKI ; KAGA HIROTO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 102 as monitoring objects, and when the monitoring section 112 detects no malfunction in the monitoring object, a control signal from the lever controller 102 is selected by a second changeover switch 111 and limit-free control current output from a first output stage 103 based on the control signal is output. On the other hand, when the monitoring section 112 detects malfunction in the monitoring objects, a control signal from a monitor controller 109 is selected by the second changeover switch 111 and limited control current output from the first output stage 103 based on the control signal is output by a current control section 113 in accordance with switching of a first changeover switch 105.SELECTED DRAWING: Figure 1
【課題】電気レバー方式の操作装置を備えた建設機械において、操作装置に異常が発生したときにも、安全を十分に確保した動作を実現する。【解決手段】監視部112は、レバー101およびレバーコントローラ102を監視対象として監視を行い、これらの異常を検出しないときには、第二の切り替えスイッチ111によりレバーコントローラ102からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を制限せずに出力する。一方、監視部112が監視対象の異常を検出したときには、第二の切り替えスイッチ111によりモニタコントローラ109からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を、第一の切り替えスイッチ105の切り替えに応じて、電流制限部113により制限して出力する。【選択図】図1</description><language>eng ; jpn</language><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; DREDGING ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; HYDRAULIC ENGINEERING ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING ; SOIL SHIFTING</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180405&DB=EPODOC&CC=JP&NR=2018053448A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180405&DB=EPODOC&CC=JP&NR=2018053448A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>IIMURO SATOSHI</creatorcontrib><creatorcontrib>MORIMOTO TAKASHI</creatorcontrib><creatorcontrib>KAWAGUCHI TAKAMASA</creatorcontrib><creatorcontrib>HAGIWARA NOBUYUKI</creatorcontrib><creatorcontrib>KAGA HIROTO</creatorcontrib><title>CONSTRUCTION EQUIPMENT</title><description>PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 102 as monitoring objects, and when the monitoring section 112 detects no malfunction in the monitoring object, a control signal from the lever controller 102 is selected by a second changeover switch 111 and limit-free control current output from a first output stage 103 based on the control signal is output. On the other hand, when the monitoring section 112 detects malfunction in the monitoring objects, a control signal from a monitor controller 109 is selected by the second changeover switch 111 and limited control current output from the first output stage 103 based on the control signal is output by a current control section 113 in accordance with switching of a first changeover switch 105.SELECTED DRAWING: Figure 1
【課題】電気レバー方式の操作装置を備えた建設機械において、操作装置に異常が発生したときにも、安全を十分に確保した動作を実現する。【解決手段】監視部112は、レバー101およびレバーコントローラ102を監視対象として監視を行い、これらの異常を検出しないときには、第二の切り替えスイッチ111によりレバーコントローラ102からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を制限せずに出力する。一方、監視部112が監視対象の異常を検出したときには、第二の切り替えスイッチ111によりモニタコントローラ109からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を、第一の切り替えスイッチ105の切り替えに応じて、電流制限部113により制限して出力する。【選択図】図1</description><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>DREDGING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBBz9vcLDgkKdQ7x9PdTcA0M9QzwdfUL4WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgaGFgamxiYmFo7GRCkCABg3H_o</recordid><startdate>20180405</startdate><enddate>20180405</enddate><creator>IIMURO SATOSHI</creator><creator>MORIMOTO TAKASHI</creator><creator>KAWAGUCHI TAKAMASA</creator><creator>HAGIWARA NOBUYUKI</creator><creator>KAGA HIROTO</creator><scope>EVB</scope></search><sort><creationdate>20180405</creationdate><title>CONSTRUCTION EQUIPMENT</title><author>IIMURO SATOSHI ; MORIMOTO TAKASHI ; KAWAGUCHI TAKAMASA ; HAGIWARA NOBUYUKI ; KAGA HIROTO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2018053448A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2018</creationdate><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>DREDGING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>IIMURO SATOSHI</creatorcontrib><creatorcontrib>MORIMOTO TAKASHI</creatorcontrib><creatorcontrib>KAWAGUCHI TAKAMASA</creatorcontrib><creatorcontrib>HAGIWARA NOBUYUKI</creatorcontrib><creatorcontrib>KAGA HIROTO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>IIMURO SATOSHI</au><au>MORIMOTO TAKASHI</au><au>KAWAGUCHI TAKAMASA</au><au>HAGIWARA NOBUYUKI</au><au>KAGA HIROTO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION EQUIPMENT</title><date>2018-04-05</date><risdate>2018</risdate><abstract>PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 102 as monitoring objects, and when the monitoring section 112 detects no malfunction in the monitoring object, a control signal from the lever controller 102 is selected by a second changeover switch 111 and limit-free control current output from a first output stage 103 based on the control signal is output. On the other hand, when the monitoring section 112 detects malfunction in the monitoring objects, a control signal from a monitor controller 109 is selected by the second changeover switch 111 and limited control current output from the first output stage 103 based on the control signal is output by a current control section 113 in accordance with switching of a first changeover switch 105.SELECTED DRAWING: Figure 1
【課題】電気レバー方式の操作装置を備えた建設機械において、操作装置に異常が発生したときにも、安全を十分に確保した動作を実現する。【解決手段】監視部112は、レバー101およびレバーコントローラ102を監視対象として監視を行い、これらの異常を検出しないときには、第二の切り替えスイッチ111によりレバーコントローラ102からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を制限せずに出力する。一方、監視部112が監視対象の異常を検出したときには、第二の切り替えスイッチ111によりモニタコントローラ109からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を、第一の切り替えスイッチ105の切り替えに応じて、電流制限部113により制限して出力する。【選択図】図1</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2018053448A |
source | esp@cenet |
subjects | CONTROL OR REGULATING SYSTEMS IN GENERAL CONTROLLING DREDGING FIXED CONSTRUCTIONS FOUNDATIONS FUNCTIONAL ELEMENTS OF SUCH SYSTEMS HYDRAULIC ENGINEERING MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS PHYSICS REGULATING SOIL SHIFTING |
title | CONSTRUCTION EQUIPMENT |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T01%3A39%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=IIMURO%20SATOSHI&rft.date=2018-04-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2018053448A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |