CONSTRUCTION EQUIPMENT

PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 1...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: IIMURO SATOSHI, MORIMOTO TAKASHI, KAWAGUCHI TAKAMASA, HAGIWARA NOBUYUKI, KAGA HIROTO
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator IIMURO SATOSHI
MORIMOTO TAKASHI
KAWAGUCHI TAKAMASA
HAGIWARA NOBUYUKI
KAGA HIROTO
description PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 102 as monitoring objects, and when the monitoring section 112 detects no malfunction in the monitoring object, a control signal from the lever controller 102 is selected by a second changeover switch 111 and limit-free control current output from a first output stage 103 based on the control signal is output. On the other hand, when the monitoring section 112 detects malfunction in the monitoring objects, a control signal from a monitor controller 109 is selected by the second changeover switch 111 and limited control current output from the first output stage 103 based on the control signal is output by a current control section 113 in accordance with switching of a first changeover switch 105.SELECTED DRAWING: Figure 1 【課題】電気レバー方式の操作装置を備えた建設機械において、操作装置に異常が発生したときにも、安全を十分に確保した動作を実現する。【解決手段】監視部112は、レバー101およびレバーコントローラ102を監視対象として監視を行い、これらの異常を検出しないときには、第二の切り替えスイッチ111によりレバーコントローラ102からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を制限せずに出力する。一方、監視部112が監視対象の異常を検出したときには、第二の切り替えスイッチ111によりモニタコントローラ109からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を、第一の切り替えスイッチ105の切り替えに応じて、電流制限部113により制限して出力する。【選択図】図1
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2018053448A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2018053448A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2018053448A3</originalsourceid><addsrcrecordid>eNrjZBBz9vcLDgkKdQ7x9PdTcA0M9QzwdfUL4WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgaGFgamxiYmFo7GRCkCABg3H_o</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION EQUIPMENT</title><source>esp@cenet</source><creator>IIMURO SATOSHI ; MORIMOTO TAKASHI ; KAWAGUCHI TAKAMASA ; HAGIWARA NOBUYUKI ; KAGA HIROTO</creator><creatorcontrib>IIMURO SATOSHI ; MORIMOTO TAKASHI ; KAWAGUCHI TAKAMASA ; HAGIWARA NOBUYUKI ; KAGA HIROTO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 102 as monitoring objects, and when the monitoring section 112 detects no malfunction in the monitoring object, a control signal from the lever controller 102 is selected by a second changeover switch 111 and limit-free control current output from a first output stage 103 based on the control signal is output. On the other hand, when the monitoring section 112 detects malfunction in the monitoring objects, a control signal from a monitor controller 109 is selected by the second changeover switch 111 and limited control current output from the first output stage 103 based on the control signal is output by a current control section 113 in accordance with switching of a first changeover switch 105.SELECTED DRAWING: Figure 1 【課題】電気レバー方式の操作装置を備えた建設機械において、操作装置に異常が発生したときにも、安全を十分に確保した動作を実現する。【解決手段】監視部112は、レバー101およびレバーコントローラ102を監視対象として監視を行い、これらの異常を検出しないときには、第二の切り替えスイッチ111によりレバーコントローラ102からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を制限せずに出力する。一方、監視部112が監視対象の異常を検出したときには、第二の切り替えスイッチ111によりモニタコントローラ109からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を、第一の切り替えスイッチ105の切り替えに応じて、電流制限部113により制限して出力する。【選択図】図1</description><language>eng ; jpn</language><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; DREDGING ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; HYDRAULIC ENGINEERING ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING ; SOIL SHIFTING</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180405&amp;DB=EPODOC&amp;CC=JP&amp;NR=2018053448A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180405&amp;DB=EPODOC&amp;CC=JP&amp;NR=2018053448A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>IIMURO SATOSHI</creatorcontrib><creatorcontrib>MORIMOTO TAKASHI</creatorcontrib><creatorcontrib>KAWAGUCHI TAKAMASA</creatorcontrib><creatorcontrib>HAGIWARA NOBUYUKI</creatorcontrib><creatorcontrib>KAGA HIROTO</creatorcontrib><title>CONSTRUCTION EQUIPMENT</title><description>PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 102 as monitoring objects, and when the monitoring section 112 detects no malfunction in the monitoring object, a control signal from the lever controller 102 is selected by a second changeover switch 111 and limit-free control current output from a first output stage 103 based on the control signal is output. On the other hand, when the monitoring section 112 detects malfunction in the monitoring objects, a control signal from a monitor controller 109 is selected by the second changeover switch 111 and limited control current output from the first output stage 103 based on the control signal is output by a current control section 113 in accordance with switching of a first changeover switch 105.SELECTED DRAWING: Figure 1 【課題】電気レバー方式の操作装置を備えた建設機械において、操作装置に異常が発生したときにも、安全を十分に確保した動作を実現する。【解決手段】監視部112は、レバー101およびレバーコントローラ102を監視対象として監視を行い、これらの異常を検出しないときには、第二の切り替えスイッチ111によりレバーコントローラ102からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を制限せずに出力する。一方、監視部112が監視対象の異常を検出したときには、第二の切り替えスイッチ111によりモニタコントローラ109からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を、第一の切り替えスイッチ105の切り替えに応じて、電流制限部113により制限して出力する。【選択図】図1</description><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>DREDGING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBBz9vcLDgkKdQ7x9PdTcA0M9QzwdfUL4WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgaGFgamxiYmFo7GRCkCABg3H_o</recordid><startdate>20180405</startdate><enddate>20180405</enddate><creator>IIMURO SATOSHI</creator><creator>MORIMOTO TAKASHI</creator><creator>KAWAGUCHI TAKAMASA</creator><creator>HAGIWARA NOBUYUKI</creator><creator>KAGA HIROTO</creator><scope>EVB</scope></search><sort><creationdate>20180405</creationdate><title>CONSTRUCTION EQUIPMENT</title><author>IIMURO SATOSHI ; MORIMOTO TAKASHI ; KAWAGUCHI TAKAMASA ; HAGIWARA NOBUYUKI ; KAGA HIROTO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2018053448A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2018</creationdate><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>DREDGING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>IIMURO SATOSHI</creatorcontrib><creatorcontrib>MORIMOTO TAKASHI</creatorcontrib><creatorcontrib>KAWAGUCHI TAKAMASA</creatorcontrib><creatorcontrib>HAGIWARA NOBUYUKI</creatorcontrib><creatorcontrib>KAGA HIROTO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>IIMURO SATOSHI</au><au>MORIMOTO TAKASHI</au><au>KAWAGUCHI TAKAMASA</au><au>HAGIWARA NOBUYUKI</au><au>KAGA HIROTO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION EQUIPMENT</title><date>2018-04-05</date><risdate>2018</risdate><abstract>PROBLEM TO BE SOLVED: To provide a construction equipment comprising an electric lever operation device to realize operation in which sufficient safety is ensured even when any malfunction occurs in the operation device.SOLUTION: A monitoring section 112 monitors a lever 101 and a lever controller 102 as monitoring objects, and when the monitoring section 112 detects no malfunction in the monitoring object, a control signal from the lever controller 102 is selected by a second changeover switch 111 and limit-free control current output from a first output stage 103 based on the control signal is output. On the other hand, when the monitoring section 112 detects malfunction in the monitoring objects, a control signal from a monitor controller 109 is selected by the second changeover switch 111 and limited control current output from the first output stage 103 based on the control signal is output by a current control section 113 in accordance with switching of a first changeover switch 105.SELECTED DRAWING: Figure 1 【課題】電気レバー方式の操作装置を備えた建設機械において、操作装置に異常が発生したときにも、安全を十分に確保した動作を実現する。【解決手段】監視部112は、レバー101およびレバーコントローラ102を監視対象として監視を行い、これらの異常を検出しないときには、第二の切り替えスイッチ111によりレバーコントローラ102からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を制限せずに出力する。一方、監視部112が監視対象の異常を検出したときには、第二の切り替えスイッチ111によりモニタコントローラ109からの制御信号を選択して、その制御信号に基づいて第一の出力段103から出力される制御電流を、第一の切り替えスイッチ105の切り替えに応じて、電流制限部113により制限して出力する。【選択図】図1</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; jpn
recordid cdi_epo_espacenet_JP2018053448A
source esp@cenet
subjects CONTROL OR REGULATING SYSTEMS IN GENERAL
CONTROLLING
DREDGING
FIXED CONSTRUCTIONS
FOUNDATIONS
FUNCTIONAL ELEMENTS OF SUCH SYSTEMS
HYDRAULIC ENGINEERING
MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS
PHYSICS
REGULATING
SOIL SHIFTING
title CONSTRUCTION EQUIPMENT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T01%3A39%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=IIMURO%20SATOSHI&rft.date=2018-04-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2018053448A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true