COMMUNICATION DEVICE AND COMMUNICATION PATH SWITCHING METHOD
PROBLEM TO BE SOLVED: To shorten a time for a switching process of a communication path for a communication signal.SOLUTION: An OLT 1 includes: an active PON interface unit 7 for outputting a communication signal; a standby PON interface unit 9; and a control unit 6 for transmitting a switching cont...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | IDA TOMONAGA YOKOHAMA KAORI |
description | PROBLEM TO BE SOLVED: To shorten a time for a switching process of a communication path for a communication signal.SOLUTION: An OLT 1 includes: an active PON interface unit 7 for outputting a communication signal; a standby PON interface unit 9; and a control unit 6 for transmitting a switching control signal. The active PON interface unit 7 includes: a memory 14; a CPU 13 for issuing instructions on data transfer according to the switching control signal; and a communication control unit 18 composed of at least one piece of hardware different from the CPU 13. When a communication path is switched, the communication control unit 18 reads out data stored in the memory 14 according to the instructions from the CPU 13, and transfers it toward the standby PON interface unit 9.SELECTED DRAWING: Figure 3
【課題】通信信号の通信経路の切り替え処理の時間を短縮する。【解決手段】OLT1は、通信信号を出力する現用系PONインタフェース部7と、予備系PONインタフェース9部と、切替制御信号を送信する制御部6とを備える。現用系PONインタフェース部7は、メモリ14と、切替制御信号に従ってデータ転送の指示を出すCPU13と、CPU13とは異なる少なくとも1つのハードウェアで構成された通信制御部18とを有し、通信経路の切り替えのとき、通信制御部18は、CPU13からの指示に従ってメモリ14に記憶されたデータを読み出し、予備系PONインタフェース部9に向けて転送する。【選択図】図3 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2018014621A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2018014621A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2018014621A3</originalsourceid><addsrcrecordid>eNrjZLBx9vf1DfXzdHYM8fT3U3BxDfN0dlVw9HNRQJUIcAzxUAgO9wxx9vD0c1fwdQ3x8HfhYWBNS8wpTuWF0twMSm6uQBW6qQX58anFBYnJqXmpJfFeAUYGhhYGhiZmRoaOxkQpAgBoCyoW</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>COMMUNICATION DEVICE AND COMMUNICATION PATH SWITCHING METHOD</title><source>esp@cenet</source><creator>IDA TOMONAGA ; YOKOHAMA KAORI</creator><creatorcontrib>IDA TOMONAGA ; YOKOHAMA KAORI</creatorcontrib><description>PROBLEM TO BE SOLVED: To shorten a time for a switching process of a communication path for a communication signal.SOLUTION: An OLT 1 includes: an active PON interface unit 7 for outputting a communication signal; a standby PON interface unit 9; and a control unit 6 for transmitting a switching control signal. The active PON interface unit 7 includes: a memory 14; a CPU 13 for issuing instructions on data transfer according to the switching control signal; and a communication control unit 18 composed of at least one piece of hardware different from the CPU 13. When a communication path is switched, the communication control unit 18 reads out data stored in the memory 14 according to the instructions from the CPU 13, and transfers it toward the standby PON interface unit 9.SELECTED DRAWING: Figure 3
【課題】通信信号の通信経路の切り替え処理の時間を短縮する。【解決手段】OLT1は、通信信号を出力する現用系PONインタフェース部7と、予備系PONインタフェース9部と、切替制御信号を送信する制御部6とを備える。現用系PONインタフェース部7は、メモリ14と、切替制御信号に従ってデータ転送の指示を出すCPU13と、CPU13とは異なる少なくとも1つのハードウェアで構成された通信制御部18とを有し、通信経路の切り替えのとき、通信制御部18は、CPU13からの指示に従ってメモリ14に記憶されたデータを読み出し、予備系PONインタフェース部9に向けて転送する。【選択図】図3</description><language>eng ; jpn</language><subject>ELECTRIC COMMUNICATION TECHNIQUE ; ELECTRICITY ; TRANSMISSION ; TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHICCOMMUNICATION</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180125&DB=EPODOC&CC=JP&NR=2018014621A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180125&DB=EPODOC&CC=JP&NR=2018014621A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>IDA TOMONAGA</creatorcontrib><creatorcontrib>YOKOHAMA KAORI</creatorcontrib><title>COMMUNICATION DEVICE AND COMMUNICATION PATH SWITCHING METHOD</title><description>PROBLEM TO BE SOLVED: To shorten a time for a switching process of a communication path for a communication signal.SOLUTION: An OLT 1 includes: an active PON interface unit 7 for outputting a communication signal; a standby PON interface unit 9; and a control unit 6 for transmitting a switching control signal. The active PON interface unit 7 includes: a memory 14; a CPU 13 for issuing instructions on data transfer according to the switching control signal; and a communication control unit 18 composed of at least one piece of hardware different from the CPU 13. When a communication path is switched, the communication control unit 18 reads out data stored in the memory 14 according to the instructions from the CPU 13, and transfers it toward the standby PON interface unit 9.SELECTED DRAWING: Figure 3
【課題】通信信号の通信経路の切り替え処理の時間を短縮する。【解決手段】OLT1は、通信信号を出力する現用系PONインタフェース部7と、予備系PONインタフェース9部と、切替制御信号を送信する制御部6とを備える。現用系PONインタフェース部7は、メモリ14と、切替制御信号に従ってデータ転送の指示を出すCPU13と、CPU13とは異なる少なくとも1つのハードウェアで構成された通信制御部18とを有し、通信経路の切り替えのとき、通信制御部18は、CPU13からの指示に従ってメモリ14に記憶されたデータを読み出し、予備系PONインタフェース部9に向けて転送する。【選択図】図3</description><subject>ELECTRIC COMMUNICATION TECHNIQUE</subject><subject>ELECTRICITY</subject><subject>TRANSMISSION</subject><subject>TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHICCOMMUNICATION</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBx9vf1DfXzdHYM8fT3U3BxDfN0dlVw9HNRQJUIcAzxUAgO9wxx9vD0c1fwdQ3x8HfhYWBNS8wpTuWF0twMSm6uQBW6qQX58anFBYnJqXmpJfFeAUYGhhYGhiZmRoaOxkQpAgBoCyoW</recordid><startdate>20180125</startdate><enddate>20180125</enddate><creator>IDA TOMONAGA</creator><creator>YOKOHAMA KAORI</creator><scope>EVB</scope></search><sort><creationdate>20180125</creationdate><title>COMMUNICATION DEVICE AND COMMUNICATION PATH SWITCHING METHOD</title><author>IDA TOMONAGA ; YOKOHAMA KAORI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2018014621A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2018</creationdate><topic>ELECTRIC COMMUNICATION TECHNIQUE</topic><topic>ELECTRICITY</topic><topic>TRANSMISSION</topic><topic>TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHICCOMMUNICATION</topic><toplevel>online_resources</toplevel><creatorcontrib>IDA TOMONAGA</creatorcontrib><creatorcontrib>YOKOHAMA KAORI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>IDA TOMONAGA</au><au>YOKOHAMA KAORI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>COMMUNICATION DEVICE AND COMMUNICATION PATH SWITCHING METHOD</title><date>2018-01-25</date><risdate>2018</risdate><abstract>PROBLEM TO BE SOLVED: To shorten a time for a switching process of a communication path for a communication signal.SOLUTION: An OLT 1 includes: an active PON interface unit 7 for outputting a communication signal; a standby PON interface unit 9; and a control unit 6 for transmitting a switching control signal. The active PON interface unit 7 includes: a memory 14; a CPU 13 for issuing instructions on data transfer according to the switching control signal; and a communication control unit 18 composed of at least one piece of hardware different from the CPU 13. When a communication path is switched, the communication control unit 18 reads out data stored in the memory 14 according to the instructions from the CPU 13, and transfers it toward the standby PON interface unit 9.SELECTED DRAWING: Figure 3
【課題】通信信号の通信経路の切り替え処理の時間を短縮する。【解決手段】OLT1は、通信信号を出力する現用系PONインタフェース部7と、予備系PONインタフェース9部と、切替制御信号を送信する制御部6とを備える。現用系PONインタフェース部7は、メモリ14と、切替制御信号に従ってデータ転送の指示を出すCPU13と、CPU13とは異なる少なくとも1つのハードウェアで構成された通信制御部18とを有し、通信経路の切り替えのとき、通信制御部18は、CPU13からの指示に従ってメモリ14に記憶されたデータを読み出し、予備系PONインタフェース部9に向けて転送する。【選択図】図3</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2018014621A |
source | esp@cenet |
subjects | ELECTRIC COMMUNICATION TECHNIQUE ELECTRICITY TRANSMISSION TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHICCOMMUNICATION |
title | COMMUNICATION DEVICE AND COMMUNICATION PATH SWITCHING METHOD |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T08%3A45%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=IDA%20TOMONAGA&rft.date=2018-01-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2018014621A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |