REBUILDING METHOD FOR EXISTING BUILDING

PROBLEM TO BE SOLVED: To provide a rebuilding method that alleviates the influence of buoyancy applied to an underground skeleton in association with fluctuations in vertical load during construction work.SOLUTION: In a rebuilding method for an existing building, a metallic weight is installed in an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KURAMOTO SHINSUKE, AOKI MINEO, FUJINAGA NAOKI, KASAMAKI MASATSUGU
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KURAMOTO SHINSUKE
AOKI MINEO
FUJINAGA NAOKI
KASAMAKI MASATSUGU
description PROBLEM TO BE SOLVED: To provide a rebuilding method that alleviates the influence of buoyancy applied to an underground skeleton in association with fluctuations in vertical load during construction work.SOLUTION: In a rebuilding method for an existing building, a metallic weight is installed in an underground skeleton to control the float-up and settlement of the underground skeleton. The metallic weight regulates the weight of a ground skeleton changing in a demolition step of an existing ground skelton in rebuilding work for an existing building and a construction step of a newly-built ground skeleton, and buoyancy of groundwater acting on the underground skeleton.SELECTED DRAWING: Figure 1 【課題】工事中の鉛直荷重の変動に伴い地下躯体に印加する浮力の影響を低減する建て替え工法を開発すること。【解決手段】既存建物の建て替え工事における既存の地上躯体の解体工程及び新築の地上躯体の構築工程において変化する地上躯体の重量と、地下躯体に作用する地下水の浮力とを調整する金属製錘を地下躯体に設置して、地下躯体の浮き上がりや沈下を制御する既存建物の建て替え工法。【選択図】図1
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2017227075A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2017227075A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2017227075A3</originalsourceid><addsrcrecordid>eNrjZFAPcnUK9fRx8fRzV_B1DfHwd1Fw8w9ScI3wDA4BicEkeRhY0xJzilN5oTQ3g5Kba4izh25qQX58anFBYnJqXmpJvFeAkYGhuZGRuYG5qaMxUYoALrEkSg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>REBUILDING METHOD FOR EXISTING BUILDING</title><source>esp@cenet</source><creator>KURAMOTO SHINSUKE ; AOKI MINEO ; FUJINAGA NAOKI ; KASAMAKI MASATSUGU</creator><creatorcontrib>KURAMOTO SHINSUKE ; AOKI MINEO ; FUJINAGA NAOKI ; KASAMAKI MASATSUGU</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a rebuilding method that alleviates the influence of buoyancy applied to an underground skeleton in association with fluctuations in vertical load during construction work.SOLUTION: In a rebuilding method for an existing building, a metallic weight is installed in an underground skeleton to control the float-up and settlement of the underground skeleton. The metallic weight regulates the weight of a ground skeleton changing in a demolition step of an existing ground skelton in rebuilding work for an existing building and a construction step of a newly-built ground skeleton, and buoyancy of groundwater acting on the underground skeleton.SELECTED DRAWING: Figure 1 【課題】工事中の鉛直荷重の変動に伴い地下躯体に印加する浮力の影響を低減する建て替え工法を開発すること。【解決手段】既存建物の建て替え工事における既存の地上躯体の解体工程及び新築の地上躯体の構築工程において変化する地上躯体の重量と、地下躯体に作用する地下水の浮力とを調整する金属製錘を地下躯体に設置して、地下躯体の浮き上がりや沈下を制御する既存建物の建て替え工法。【選択図】図1</description><language>eng ; jpn</language><subject>EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2017</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20171228&amp;DB=EPODOC&amp;CC=JP&amp;NR=2017227075A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20171228&amp;DB=EPODOC&amp;CC=JP&amp;NR=2017227075A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KURAMOTO SHINSUKE</creatorcontrib><creatorcontrib>AOKI MINEO</creatorcontrib><creatorcontrib>FUJINAGA NAOKI</creatorcontrib><creatorcontrib>KASAMAKI MASATSUGU</creatorcontrib><title>REBUILDING METHOD FOR EXISTING BUILDING</title><description>PROBLEM TO BE SOLVED: To provide a rebuilding method that alleviates the influence of buoyancy applied to an underground skeleton in association with fluctuations in vertical load during construction work.SOLUTION: In a rebuilding method for an existing building, a metallic weight is installed in an underground skeleton to control the float-up and settlement of the underground skeleton. The metallic weight regulates the weight of a ground skeleton changing in a demolition step of an existing ground skelton in rebuilding work for an existing building and a construction step of a newly-built ground skeleton, and buoyancy of groundwater acting on the underground skeleton.SELECTED DRAWING: Figure 1 【課題】工事中の鉛直荷重の変動に伴い地下躯体に印加する浮力の影響を低減する建て替え工法を開発すること。【解決手段】既存建物の建て替え工事における既存の地上躯体の解体工程及び新築の地上躯体の構築工程において変化する地上躯体の重量と、地下躯体に作用する地下水の浮力とを調整する金属製錘を地下躯体に設置して、地下躯体の浮き上がりや沈下を制御する既存建物の建て替え工法。【選択図】図1</description><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2017</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFAPcnUK9fRx8fRzV_B1DfHwd1Fw8w9ScI3wDA4BicEkeRhY0xJzilN5oTQ3g5Kba4izh25qQX58anFBYnJqXmpJvFeAkYGhuZGRuYG5qaMxUYoALrEkSg</recordid><startdate>20171228</startdate><enddate>20171228</enddate><creator>KURAMOTO SHINSUKE</creator><creator>AOKI MINEO</creator><creator>FUJINAGA NAOKI</creator><creator>KASAMAKI MASATSUGU</creator><scope>EVB</scope></search><sort><creationdate>20171228</creationdate><title>REBUILDING METHOD FOR EXISTING BUILDING</title><author>KURAMOTO SHINSUKE ; AOKI MINEO ; FUJINAGA NAOKI ; KASAMAKI MASATSUGU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2017227075A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2017</creationdate><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>KURAMOTO SHINSUKE</creatorcontrib><creatorcontrib>AOKI MINEO</creatorcontrib><creatorcontrib>FUJINAGA NAOKI</creatorcontrib><creatorcontrib>KASAMAKI MASATSUGU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KURAMOTO SHINSUKE</au><au>AOKI MINEO</au><au>FUJINAGA NAOKI</au><au>KASAMAKI MASATSUGU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>REBUILDING METHOD FOR EXISTING BUILDING</title><date>2017-12-28</date><risdate>2017</risdate><abstract>PROBLEM TO BE SOLVED: To provide a rebuilding method that alleviates the influence of buoyancy applied to an underground skeleton in association with fluctuations in vertical load during construction work.SOLUTION: In a rebuilding method for an existing building, a metallic weight is installed in an underground skeleton to control the float-up and settlement of the underground skeleton. The metallic weight regulates the weight of a ground skeleton changing in a demolition step of an existing ground skelton in rebuilding work for an existing building and a construction step of a newly-built ground skeleton, and buoyancy of groundwater acting on the underground skeleton.SELECTED DRAWING: Figure 1 【課題】工事中の鉛直荷重の変動に伴い地下躯体に印加する浮力の影響を低減する建て替え工法を開発すること。【解決手段】既存建物の建て替え工事における既存の地上躯体の解体工程及び新築の地上躯体の構築工程において変化する地上躯体の重量と、地下躯体に作用する地下水の浮力とを調整する金属製錘を地下躯体に設置して、地下躯体の浮き上がりや沈下を制御する既存建物の建て替え工法。【選択図】図1</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; jpn
recordid cdi_epo_espacenet_JP2017227075A
source esp@cenet
subjects EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
SOIL SHIFTING
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title REBUILDING METHOD FOR EXISTING BUILDING
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T17%3A07%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KURAMOTO%20SHINSUKE&rft.date=2017-12-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2017227075A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true