BORING DEVICE AND BORING METHOD
PROBLEM TO BE SOLVED: To provide a boring device that occupies only a small space inside a pipe and helps securing a widest arrangement location possible for other members, along with a boring method.SOLUTION: A curved-line boring device (boring device) 1 includes a driving unit 20 providing driving...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | FURUI MASAHIRO NAKATANI TAKEHIKO |
description | PROBLEM TO BE SOLVED: To provide a boring device that occupies only a small space inside a pipe and helps securing a widest arrangement location possible for other members, along with a boring method.SOLUTION: A curved-line boring device (boring device) 1 includes a driving unit 20 providing driving force to a curved steel pipe (pipe) 5 buried in a ground, and a tip device 10 fitted on a tip of the curved steel pipe 5 for drilling the ground. A strain gauge 6 is fitted on the curved steel pipe 5, for measuring stress generated on the curved steel pipe 5. The curved-line boring device 1 derives deformation of the curved steel pipe 5 based on the stress generated on the curved steel pipe 5 measured by the strain gauge 6.SELECTED DRAWING: Figure 1
【課題】管の内側で占めるスペースが小さく、他の部材の極力広い配置位置の確保に寄与することができるボーリング装置およびボーリング工法を提供する。【解決手段】曲線ボーリング装置(ボーリング装置)1は、地盤に埋設される曲線鋼管(管)5に対して推進力を付与する推進装置20および曲線鋼管5の先端に取り付けられ地盤を削孔する先端装置10を備える。曲線鋼管5には、曲線鋼管5に生じる応力を計測する歪みゲージ6が取り付けられている。また、曲線ボーリング装置1では、歪みゲージ6で計測した曲線鋼管5に生じる応力に基づいて、曲線鋼管5の変形を求める。【選択図】図1 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2017193828A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2017193828A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2017193828A3</originalsourceid><addsrcrecordid>eNrjZJB38g_y9HNXcHEN83R2VXD0c1GAivi6hnj4u_AwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknivACMDQ3NDS2MLIwtHY6IUAQD2MSHS</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>BORING DEVICE AND BORING METHOD</title><source>esp@cenet</source><creator>FURUI MASAHIRO ; NAKATANI TAKEHIKO</creator><creatorcontrib>FURUI MASAHIRO ; NAKATANI TAKEHIKO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a boring device that occupies only a small space inside a pipe and helps securing a widest arrangement location possible for other members, along with a boring method.SOLUTION: A curved-line boring device (boring device) 1 includes a driving unit 20 providing driving force to a curved steel pipe (pipe) 5 buried in a ground, and a tip device 10 fitted on a tip of the curved steel pipe 5 for drilling the ground. A strain gauge 6 is fitted on the curved steel pipe 5, for measuring stress generated on the curved steel pipe 5. The curved-line boring device 1 derives deformation of the curved steel pipe 5 based on the stress generated on the curved steel pipe 5 measured by the strain gauge 6.SELECTED DRAWING: Figure 1
【課題】管の内側で占めるスペースが小さく、他の部材の極力広い配置位置の確保に寄与することができるボーリング装置およびボーリング工法を提供する。【解決手段】曲線ボーリング装置(ボーリング装置)1は、地盤に埋設される曲線鋼管(管)5に対して推進力を付与する推進装置20および曲線鋼管5の先端に取り付けられ地盤を削孔する先端装置10を備える。曲線鋼管5には、曲線鋼管5に生じる応力を計測する歪みゲージ6が取り付けられている。また、曲線ボーリング装置1では、歪みゲージ6で計測した曲線鋼管5に生じる応力に基づいて、曲線鋼管5の変形を求める。【選択図】図1</description><language>eng ; jpn</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2017</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20171026&DB=EPODOC&CC=JP&NR=2017193828A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20171026&DB=EPODOC&CC=JP&NR=2017193828A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FURUI MASAHIRO</creatorcontrib><creatorcontrib>NAKATANI TAKEHIKO</creatorcontrib><title>BORING DEVICE AND BORING METHOD</title><description>PROBLEM TO BE SOLVED: To provide a boring device that occupies only a small space inside a pipe and helps securing a widest arrangement location possible for other members, along with a boring method.SOLUTION: A curved-line boring device (boring device) 1 includes a driving unit 20 providing driving force to a curved steel pipe (pipe) 5 buried in a ground, and a tip device 10 fitted on a tip of the curved steel pipe 5 for drilling the ground. A strain gauge 6 is fitted on the curved steel pipe 5, for measuring stress generated on the curved steel pipe 5. The curved-line boring device 1 derives deformation of the curved steel pipe 5 based on the stress generated on the curved steel pipe 5 measured by the strain gauge 6.SELECTED DRAWING: Figure 1
【課題】管の内側で占めるスペースが小さく、他の部材の極力広い配置位置の確保に寄与することができるボーリング装置およびボーリング工法を提供する。【解決手段】曲線ボーリング装置(ボーリング装置)1は、地盤に埋設される曲線鋼管(管)5に対して推進力を付与する推進装置20および曲線鋼管5の先端に取り付けられ地盤を削孔する先端装置10を備える。曲線鋼管5には、曲線鋼管5に生じる応力を計測する歪みゲージ6が取り付けられている。また、曲線ボーリング装置1では、歪みゲージ6で計測した曲線鋼管5に生じる応力に基づいて、曲線鋼管5の変形を求める。【選択図】図1</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2017</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJB38g_y9HNXcHEN83R2VXD0c1GAivi6hnj4u_AwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknivACMDQ3NDS2MLIwtHY6IUAQD2MSHS</recordid><startdate>20171026</startdate><enddate>20171026</enddate><creator>FURUI MASAHIRO</creator><creator>NAKATANI TAKEHIKO</creator><scope>EVB</scope></search><sort><creationdate>20171026</creationdate><title>BORING DEVICE AND BORING METHOD</title><author>FURUI MASAHIRO ; NAKATANI TAKEHIKO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2017193828A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2017</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>FURUI MASAHIRO</creatorcontrib><creatorcontrib>NAKATANI TAKEHIKO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FURUI MASAHIRO</au><au>NAKATANI TAKEHIKO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>BORING DEVICE AND BORING METHOD</title><date>2017-10-26</date><risdate>2017</risdate><abstract>PROBLEM TO BE SOLVED: To provide a boring device that occupies only a small space inside a pipe and helps securing a widest arrangement location possible for other members, along with a boring method.SOLUTION: A curved-line boring device (boring device) 1 includes a driving unit 20 providing driving force to a curved steel pipe (pipe) 5 buried in a ground, and a tip device 10 fitted on a tip of the curved steel pipe 5 for drilling the ground. A strain gauge 6 is fitted on the curved steel pipe 5, for measuring stress generated on the curved steel pipe 5. The curved-line boring device 1 derives deformation of the curved steel pipe 5 based on the stress generated on the curved steel pipe 5 measured by the strain gauge 6.SELECTED DRAWING: Figure 1
【課題】管の内側で占めるスペースが小さく、他の部材の極力広い配置位置の確保に寄与することができるボーリング装置およびボーリング工法を提供する。【解決手段】曲線ボーリング装置(ボーリング装置)1は、地盤に埋設される曲線鋼管(管)5に対して推進力を付与する推進装置20および曲線鋼管5の先端に取り付けられ地盤を削孔する先端装置10を備える。曲線鋼管5には、曲線鋼管5に生じる応力を計測する歪みゲージ6が取り付けられている。また、曲線ボーリング装置1では、歪みゲージ6で計測した曲線鋼管5に生じる応力に基づいて、曲線鋼管5の変形を求める。【選択図】図1</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2017193828A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | BORING DEVICE AND BORING METHOD |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T22%3A56%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FURUI%20MASAHIRO&rft.date=2017-10-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2017193828A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |