MONITORING CONTROL SYSTEM
PROBLEM TO BE SOLVED: To collect information on electric energy in each user and manage the information.SOLUTION: A monitoring control system comprises: monitoring control devices 541, 551 for performing monitoring control on a plurality of substation apparatuses 501, 502 installed in a substation;...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To collect information on electric energy in each user and manage the information.SOLUTION: A monitoring control system comprises: monitoring control devices 541, 551 for performing monitoring control on a plurality of substation apparatuses 501, 502 installed in a substation; and external systems 581 to 583, 602 to 604, 611 to 613 that are connected to the monitoring control devices 541, 551 and use information handled by the monitoring control devices 541, 551 to perform various types of processing including information analysis. An external system (AMI 581 of the external systems) collects information on electric energy from power meters installed in respective users and executes predetermined processing by using the collected information.SELECTED DRAWING: Figure 16
【課題】各需要家における電力量に関する情報収集し管理する。【解決手段】変電所に設けられた複数の変電所機器501,502を監視制御する監視制御装置541,551と、監視制御装置541,551と接続され、監視制御装置541,551で取り扱われる情報を用いて、情報の分析を含む各種処理を行う外部システム581〜583,602〜604,611〜613と、を備え、外部システム(外部システムのうちのAMI581)は、各需要家に設けられた電力量計からの電力量に関する情報を収集し、収集した情報を用いて所定の処理を実行する。【選択図】図16 |
---|