POWER DEMAND ADJUSTMENT DEVICE, POWER DEMAND ADJUSTMENT METHOD AND POWER DEMAND ADJUSTMENT PROGRAM

PROBLEM TO BE SOLVED: To provide a power demand adjustment device which effectively controls charge/discharge of a storage battery.SOLUTION: A load factor calculation part 11 performs processing for calculating a power demand prediction on a second next day based on a power demand prediction on a fi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: HATTA HIROYUKI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HATTA HIROYUKI
description PROBLEM TO BE SOLVED: To provide a power demand adjustment device which effectively controls charge/discharge of a storage battery.SOLUTION: A load factor calculation part 11 performs processing for calculating a power demand prediction on a second next day based on a power demand prediction on a first next day in the community and a charge/discharge plan of a storage battery on the next day in the community in the state where demand response information is not used, and calculating a load factor on the next day in the community from the calculated power demand prediction on the second next day. A DR information creation part 12 creates demand response information based on a latest load factor that is calculated by the load factor calculation part 11. A charge/discharge plan creation part 21 creates the charge/discharge plan of a storage battery 22 on the next day based on the latest demand response information that is created by the DR information creation part 12. After the load factor calculation part 11 repeats the processing predetermined times, a DR information extraction part 14 extracts demand response information from among the demand response information that has been created by the DR information creation part 12, and notifies each of users of the extracted demand response information.SELECTED DRAWING: Figure 2 【課題】効果的に蓄電池の充放電を制御する電力需要調整装置を提供する。【解決手段】負荷率算出部11は、デマンドレスポンス情報を用いない状態での、コミュニティにおける第1の翌日の電力需要予測及びコミュニティにおける翌日の蓄電池の充放電計画を基に第2の翌日の電力需要予測を求め、求めた第2の翌日の電力需要予測からコミュニティの翌日の負荷率を算出する処理を行う。DR情報作成部12は、負荷率算出部11により算出された最新の負荷率を基にデマンドレスポンス情報を作成する。充放電計画作成部21は、DR情報作成部12により作成された最新のデマンドレスポンス情報を基に、翌日の蓄電池22の充放電計画を作成する。DR情報抽出部14は、負荷率算出部11が処理を所定回数繰り返した後にDR情報作成部12が作成したデマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各需要家に通知する。【選択図】図2
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2016220384A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2016220384A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2016220384A3</originalsourceid><addsrcrecordid>eNrjZEgK8A93DVJwcfV19HNRcHTxCg0O8XX1CwGKhHk6u-oo4JL3dQ3x8AeKAEVxKQkI8ncPcvTlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBoZmRkYGxhYmjsZEKQIARDA0XA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>POWER DEMAND ADJUSTMENT DEVICE, POWER DEMAND ADJUSTMENT METHOD AND POWER DEMAND ADJUSTMENT PROGRAM</title><source>esp@cenet</source><creator>HATTA HIROYUKI</creator><creatorcontrib>HATTA HIROYUKI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a power demand adjustment device which effectively controls charge/discharge of a storage battery.SOLUTION: A load factor calculation part 11 performs processing for calculating a power demand prediction on a second next day based on a power demand prediction on a first next day in the community and a charge/discharge plan of a storage battery on the next day in the community in the state where demand response information is not used, and calculating a load factor on the next day in the community from the calculated power demand prediction on the second next day. A DR information creation part 12 creates demand response information based on a latest load factor that is calculated by the load factor calculation part 11. A charge/discharge plan creation part 21 creates the charge/discharge plan of a storage battery 22 on the next day based on the latest demand response information that is created by the DR information creation part 12. After the load factor calculation part 11 repeats the processing predetermined times, a DR information extraction part 14 extracts demand response information from among the demand response information that has been created by the DR information creation part 12, and notifies each of users of the extracted demand response information.SELECTED DRAWING: Figure 2 【課題】効果的に蓄電池の充放電を制御する電力需要調整装置を提供する。【解決手段】負荷率算出部11は、デマンドレスポンス情報を用いない状態での、コミュニティにおける第1の翌日の電力需要予測及びコミュニティにおける翌日の蓄電池の充放電計画を基に第2の翌日の電力需要予測を求め、求めた第2の翌日の電力需要予測からコミュニティの翌日の負荷率を算出する処理を行う。DR情報作成部12は、負荷率算出部11により算出された最新の負荷率を基にデマンドレスポンス情報を作成する。充放電計画作成部21は、DR情報作成部12により作成された最新のデマンドレスポンス情報を基に、翌日の蓄電池22の充放電計画を作成する。DR情報抽出部14は、負荷率算出部11が処理を所定回数繰り返した後にDR情報作成部12が作成したデマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各需要家に通知する。【選択図】図2</description><language>eng ; jpn</language><subject>CALCULATING ; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; COMPUTING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRICITY ; GENERATION ; PHYSICS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20161222&amp;DB=EPODOC&amp;CC=JP&amp;NR=2016220384A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20161222&amp;DB=EPODOC&amp;CC=JP&amp;NR=2016220384A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HATTA HIROYUKI</creatorcontrib><title>POWER DEMAND ADJUSTMENT DEVICE, POWER DEMAND ADJUSTMENT METHOD AND POWER DEMAND ADJUSTMENT PROGRAM</title><description>PROBLEM TO BE SOLVED: To provide a power demand adjustment device which effectively controls charge/discharge of a storage battery.SOLUTION: A load factor calculation part 11 performs processing for calculating a power demand prediction on a second next day based on a power demand prediction on a first next day in the community and a charge/discharge plan of a storage battery on the next day in the community in the state where demand response information is not used, and calculating a load factor on the next day in the community from the calculated power demand prediction on the second next day. A DR information creation part 12 creates demand response information based on a latest load factor that is calculated by the load factor calculation part 11. A charge/discharge plan creation part 21 creates the charge/discharge plan of a storage battery 22 on the next day based on the latest demand response information that is created by the DR information creation part 12. After the load factor calculation part 11 repeats the processing predetermined times, a DR information extraction part 14 extracts demand response information from among the demand response information that has been created by the DR information creation part 12, and notifies each of users of the extracted demand response information.SELECTED DRAWING: Figure 2 【課題】効果的に蓄電池の充放電を制御する電力需要調整装置を提供する。【解決手段】負荷率算出部11は、デマンドレスポンス情報を用いない状態での、コミュニティにおける第1の翌日の電力需要予測及びコミュニティにおける翌日の蓄電池の充放電計画を基に第2の翌日の電力需要予測を求め、求めた第2の翌日の電力需要予測からコミュニティの翌日の負荷率を算出する処理を行う。DR情報作成部12は、負荷率算出部11により算出された最新の負荷率を基にデマンドレスポンス情報を作成する。充放電計画作成部21は、DR情報作成部12により作成された最新のデマンドレスポンス情報を基に、翌日の蓄電池22の充放電計画を作成する。DR情報抽出部14は、負荷率算出部11が処理を所定回数繰り返した後にDR情報作成部12が作成したデマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各需要家に通知する。【選択図】図2</description><subject>CALCULATING</subject><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>COMPUTING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>PHYSICS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZEgK8A93DVJwcfV19HNRcHTxCg0O8XX1CwGKhHk6u-oo4JL3dQ3x8AeKAEVxKQkI8ncPcvTlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBoZmRkYGxhYmjsZEKQIARDA0XA</recordid><startdate>20161222</startdate><enddate>20161222</enddate><creator>HATTA HIROYUKI</creator><scope>EVB</scope></search><sort><creationdate>20161222</creationdate><title>POWER DEMAND ADJUSTMENT DEVICE, POWER DEMAND ADJUSTMENT METHOD AND POWER DEMAND ADJUSTMENT PROGRAM</title><author>HATTA HIROYUKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2016220384A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2016</creationdate><topic>CALCULATING</topic><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>COMPUTING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>PHYSICS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>HATTA HIROYUKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HATTA HIROYUKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>POWER DEMAND ADJUSTMENT DEVICE, POWER DEMAND ADJUSTMENT METHOD AND POWER DEMAND ADJUSTMENT PROGRAM</title><date>2016-12-22</date><risdate>2016</risdate><abstract>PROBLEM TO BE SOLVED: To provide a power demand adjustment device which effectively controls charge/discharge of a storage battery.SOLUTION: A load factor calculation part 11 performs processing for calculating a power demand prediction on a second next day based on a power demand prediction on a first next day in the community and a charge/discharge plan of a storage battery on the next day in the community in the state where demand response information is not used, and calculating a load factor on the next day in the community from the calculated power demand prediction on the second next day. A DR information creation part 12 creates demand response information based on a latest load factor that is calculated by the load factor calculation part 11. A charge/discharge plan creation part 21 creates the charge/discharge plan of a storage battery 22 on the next day based on the latest demand response information that is created by the DR information creation part 12. After the load factor calculation part 11 repeats the processing predetermined times, a DR information extraction part 14 extracts demand response information from among the demand response information that has been created by the DR information creation part 12, and notifies each of users of the extracted demand response information.SELECTED DRAWING: Figure 2 【課題】効果的に蓄電池の充放電を制御する電力需要調整装置を提供する。【解決手段】負荷率算出部11は、デマンドレスポンス情報を用いない状態での、コミュニティにおける第1の翌日の電力需要予測及びコミュニティにおける翌日の蓄電池の充放電計画を基に第2の翌日の電力需要予測を求め、求めた第2の翌日の電力需要予測からコミュニティの翌日の負荷率を算出する処理を行う。DR情報作成部12は、負荷率算出部11により算出された最新の負荷率を基にデマンドレスポンス情報を作成する。充放電計画作成部21は、DR情報作成部12により作成された最新のデマンドレスポンス情報を基に、翌日の蓄電池22の充放電計画を作成する。DR情報抽出部14は、負荷率算出部11が処理を所定回数繰り返した後にDR情報作成部12が作成したデマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各需要家に通知する。【選択図】図2</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; jpn
recordid cdi_epo_espacenet_JP2016220384A
source esp@cenet
subjects CALCULATING
CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
COMPUTING
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
ELECTRICITY
GENERATION
PHYSICS
SYSTEMS FOR STORING ELECTRIC ENERGY
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title POWER DEMAND ADJUSTMENT DEVICE, POWER DEMAND ADJUSTMENT METHOD AND POWER DEMAND ADJUSTMENT PROGRAM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-16T03%3A55%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HATTA%20HIROYUKI&rft.date=2016-12-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2016220384A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true