BRIDGE CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To construct a bridge by installing a pile foundation while reducing noise and vibration.SOLUTION: In a construction method of a bridge 1, a cross beam 4 is disposed above a steel pipe pile 2A that has been already set, and a main girder 5 on which floor slabs are arranged is c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FUJIKAWA TAKAHITO, SAWAISHI MASAMICHI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!