STEEL SHEET PILE
PROBLEM TO BE SOLVED: To reduce noises and vibrations during installation work for heat exchange piping, and to shorten the time required for the installation work and reduce the installation costs.SOLUTION: A steel sheet pile 200 includes a steel sheet pile substrate 210, a storage part 220 within...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | KOBAYASHI KENCHI |
description | PROBLEM TO BE SOLVED: To reduce noises and vibrations during installation work for heat exchange piping, and to shorten the time required for the installation work and reduce the installation costs.SOLUTION: A steel sheet pile 200 includes a steel sheet pile substrate 210, a storage part 220 within which a storage space 222 provided in the steel sheet pile substrate and extended in the longitudinal direction of the steel sheet pile substrate is formed, heat exchange piping 230 that is housed in the storage space and through which a heating medium is circulated, and a heat storage material 240 that is infilled into the storage space. The steel sheet pile 200 can be buried in soil by a press-in construction method.
【課題】熱交換配管の設置作業時の騒音および振動を低減するとともに、設置作業にかかる時間を短縮し、設置費用を低減する。【解決手段】鋼矢板200は、鋼矢板基体210と、鋼矢板基体に設けられ、鋼矢板基体の長手方向に延在した収容空間222が、内部に形成される収容部220と、収容空間に収容され、内部を熱媒が流通する熱交換配管230と、収容空間に充填される蓄熱材240とを備え、圧入工法によって、土壌に埋設することができることを特徴とする。【選択図】図2 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2015113645A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2015113645A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2015113645A3</originalsourceid><addsrcrecordid>eNrjZBAIDnF19VEI9nB1DVEI8PRx5WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgaGpoaGxmYmpo7GRCkCAC28HcM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>STEEL SHEET PILE</title><source>esp@cenet</source><creator>KOBAYASHI KENCHI</creator><creatorcontrib>KOBAYASHI KENCHI</creatorcontrib><description>PROBLEM TO BE SOLVED: To reduce noises and vibrations during installation work for heat exchange piping, and to shorten the time required for the installation work and reduce the installation costs.SOLUTION: A steel sheet pile 200 includes a steel sheet pile substrate 210, a storage part 220 within which a storage space 222 provided in the steel sheet pile substrate and extended in the longitudinal direction of the steel sheet pile substrate is formed, heat exchange piping 230 that is housed in the storage space and through which a heating medium is circulated, and a heat storage material 240 that is infilled into the storage space. The steel sheet pile 200 can be buried in soil by a press-in construction method.
【課題】熱交換配管の設置作業時の騒音および振動を低減するとともに、設置作業にかかる時間を短縮し、設置費用を低減する。【解決手段】鋼矢板200は、鋼矢板基体210と、鋼矢板基体に設けられ、鋼矢板基体の長手方向に延在した収容空間222が、内部に形成される収容部220と、収容空間に収容され、内部を熱媒が流通する熱交換配管230と、収容空間に充填される蓄熱材240とを備え、圧入工法によって、土壌に埋設することができることを特徴とする。【選択図】図2</description><language>eng ; jpn</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20150622&DB=EPODOC&CC=JP&NR=2015113645A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20150622&DB=EPODOC&CC=JP&NR=2015113645A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KOBAYASHI KENCHI</creatorcontrib><title>STEEL SHEET PILE</title><description>PROBLEM TO BE SOLVED: To reduce noises and vibrations during installation work for heat exchange piping, and to shorten the time required for the installation work and reduce the installation costs.SOLUTION: A steel sheet pile 200 includes a steel sheet pile substrate 210, a storage part 220 within which a storage space 222 provided in the steel sheet pile substrate and extended in the longitudinal direction of the steel sheet pile substrate is formed, heat exchange piping 230 that is housed in the storage space and through which a heating medium is circulated, and a heat storage material 240 that is infilled into the storage space. The steel sheet pile 200 can be buried in soil by a press-in construction method.
【課題】熱交換配管の設置作業時の騒音および振動を低減するとともに、設置作業にかかる時間を短縮し、設置費用を低減する。【解決手段】鋼矢板200は、鋼矢板基体210と、鋼矢板基体に設けられ、鋼矢板基体の長手方向に延在した収容空間222が、内部に形成される収容部220と、収容空間に収容され、内部を熱媒が流通する熱交換配管230と、収容空間に充填される蓄熱材240とを備え、圧入工法によって、土壌に埋設することができることを特徴とする。【選択図】図2</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBAIDnF19VEI9nB1DVEI8PRx5WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgaGpoaGxmYmpo7GRCkCAC28HcM</recordid><startdate>20150622</startdate><enddate>20150622</enddate><creator>KOBAYASHI KENCHI</creator><scope>EVB</scope></search><sort><creationdate>20150622</creationdate><title>STEEL SHEET PILE</title><author>KOBAYASHI KENCHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2015113645A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2015</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>KOBAYASHI KENCHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KOBAYASHI KENCHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>STEEL SHEET PILE</title><date>2015-06-22</date><risdate>2015</risdate><abstract>PROBLEM TO BE SOLVED: To reduce noises and vibrations during installation work for heat exchange piping, and to shorten the time required for the installation work and reduce the installation costs.SOLUTION: A steel sheet pile 200 includes a steel sheet pile substrate 210, a storage part 220 within which a storage space 222 provided in the steel sheet pile substrate and extended in the longitudinal direction of the steel sheet pile substrate is formed, heat exchange piping 230 that is housed in the storage space and through which a heating medium is circulated, and a heat storage material 240 that is infilled into the storage space. The steel sheet pile 200 can be buried in soil by a press-in construction method.
【課題】熱交換配管の設置作業時の騒音および振動を低減するとともに、設置作業にかかる時間を短縮し、設置費用を低減する。【解決手段】鋼矢板200は、鋼矢板基体210と、鋼矢板基体に設けられ、鋼矢板基体の長手方向に延在した収容空間222が、内部に形成される収容部220と、収容空間に収容され、内部を熱媒が流通する熱交換配管230と、収容空間に充填される蓄熱材240とを備え、圧入工法によって、土壌に埋設することができることを特徴とする。【選択図】図2</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2015113645A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | STEEL SHEET PILE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T16%3A23%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KOBAYASHI%20KENCHI&rft.date=2015-06-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2015113645A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |