CONSTRUCTION METHOD OF DOUBLE SHELL TANK
PROBLEM TO BE SOLVED: To provide a construction method of a double shell tank in which inspection work of a roof is made efficient while prolongation of a manufacturing period is suppressed.SOLUTION: Without waiting for an inspection of an inner tank roof to complete in the whole area, while an insp...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a construction method of a double shell tank in which inspection work of a roof is made efficient while prolongation of a manufacturing period is suppressed.SOLUTION: Without waiting for an inspection of an inner tank roof to complete in the whole area, while an inspection is being made in a second area of the inner tank roof, an outer tank roof is formed in an area covering a first area of the inner tank roof of which inspection has completed earlier. |
---|