WALL SURFACE CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To solve the problem that, conventionally, bolt holes or connection holes of upper and lower panels are not aligned with each other and the panels cannot be connected if positional relation between the upper and lower panels deviates when the panels are stacked.SOLUTION: In a f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YUTA SHINICHI, YUDA YASUHIRO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YUTA SHINICHI
YUDA YASUHIRO
description PROBLEM TO BE SOLVED: To solve the problem that, conventionally, bolt holes or connection holes of upper and lower panels are not aligned with each other and the panels cannot be connected if positional relation between the upper and lower panels deviates when the panels are stacked.SOLUTION: In a first step, a panel body 1a of an upper stage is inserted and positioned between a front face connection member 2a, of which one end is attached to a panel body 1a of a lower stage and of which the other end projects upward from a front side and a back side of the panel body 1a of the lower stage, and a back face connection member 3a. In a second step, a bolt 4c is interposed in a prescribed interval 19, 17 between the front face or back face of the panel body 1a of the upper or lower stage and an engaging face 2a1, 3a1 of the front face connection member 2a or the back face connection member 3a. Then, the panel bodies 1a are fixed and stacked, and thereby the upper and lower panel bodies 1a can be mutually supported at a desired position in a laying extension direction.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2012233323A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2012233323A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2012233323A3</originalsourceid><addsrcrecordid>eNrjZFAId_TxUQgODXJzdHZVcPb3Cw4JCnUO8fT3U_B1DfHwd-FhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGhkZGxsbGRsaOxkQpAgBGKyJq</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>WALL SURFACE CONSTRUCTION METHOD</title><source>esp@cenet</source><creator>YUTA SHINICHI ; YUDA YASUHIRO</creator><creatorcontrib>YUTA SHINICHI ; YUDA YASUHIRO</creatorcontrib><description>PROBLEM TO BE SOLVED: To solve the problem that, conventionally, bolt holes or connection holes of upper and lower panels are not aligned with each other and the panels cannot be connected if positional relation between the upper and lower panels deviates when the panels are stacked.SOLUTION: In a first step, a panel body 1a of an upper stage is inserted and positioned between a front face connection member 2a, of which one end is attached to a panel body 1a of a lower stage and of which the other end projects upward from a front side and a back side of the panel body 1a of the lower stage, and a back face connection member 3a. In a second step, a bolt 4c is interposed in a prescribed interval 19, 17 between the front face or back face of the panel body 1a of the upper or lower stage and an engaging face 2a1, 3a1 of the front face connection member 2a or the back face connection member 3a. Then, the panel bodies 1a are fixed and stacked, and thereby the upper and lower panel bodies 1a can be mutually supported at a desired position in a laying extension direction.</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; OR VIADUCTS ; SHAFTS ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20121129&amp;DB=EPODOC&amp;CC=JP&amp;NR=2012233323A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20121129&amp;DB=EPODOC&amp;CC=JP&amp;NR=2012233323A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YUTA SHINICHI</creatorcontrib><creatorcontrib>YUDA YASUHIRO</creatorcontrib><title>WALL SURFACE CONSTRUCTION METHOD</title><description>PROBLEM TO BE SOLVED: To solve the problem that, conventionally, bolt holes or connection holes of upper and lower panels are not aligned with each other and the panels cannot be connected if positional relation between the upper and lower panels deviates when the panels are stacked.SOLUTION: In a first step, a panel body 1a of an upper stage is inserted and positioned between a front face connection member 2a, of which one end is attached to a panel body 1a of a lower stage and of which the other end projects upward from a front side and a back side of the panel body 1a of the lower stage, and a back face connection member 3a. In a second step, a bolt 4c is interposed in a prescribed interval 19, 17 between the front face or back face of the panel body 1a of the upper or lower stage and an engaging face 2a1, 3a1 of the front face connection member 2a or the back face connection member 3a. Then, the panel bodies 1a are fixed and stacked, and thereby the upper and lower panel bodies 1a can be mutually supported at a desired position in a laying extension direction.</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>OR VIADUCTS</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFAId_TxUQgODXJzdHZVcPb3Cw4JCnUO8fT3U_B1DfHwd-FhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGhkZGxsbGRsaOxkQpAgBGKyJq</recordid><startdate>20121129</startdate><enddate>20121129</enddate><creator>YUTA SHINICHI</creator><creator>YUDA YASUHIRO</creator><scope>EVB</scope></search><sort><creationdate>20121129</creationdate><title>WALL SURFACE CONSTRUCTION METHOD</title><author>YUTA SHINICHI ; YUDA YASUHIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2012233323A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2012</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>OR VIADUCTS</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YUTA SHINICHI</creatorcontrib><creatorcontrib>YUDA YASUHIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YUTA SHINICHI</au><au>YUDA YASUHIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>WALL SURFACE CONSTRUCTION METHOD</title><date>2012-11-29</date><risdate>2012</risdate><abstract>PROBLEM TO BE SOLVED: To solve the problem that, conventionally, bolt holes or connection holes of upper and lower panels are not aligned with each other and the panels cannot be connected if positional relation between the upper and lower panels deviates when the panels are stacked.SOLUTION: In a first step, a panel body 1a of an upper stage is inserted and positioned between a front face connection member 2a, of which one end is attached to a panel body 1a of a lower stage and of which the other end projects upward from a front side and a back side of the panel body 1a of the lower stage, and a back face connection member 3a. In a second step, a bolt 4c is interposed in a prescribed interval 19, 17 between the front face or back face of the panel body 1a of the upper or lower stage and an engaging face 2a1, 3a1 of the front face connection member 2a or the back face connection member 3a. Then, the panel bodies 1a are fixed and stacked, and thereby the upper and lower panel bodies 1a can be mutually supported at a desired position in a laying extension direction.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2012233323A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
OR VIADUCTS
SHAFTS
SOIL SHIFTING
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title WALL SURFACE CONSTRUCTION METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-23T03%3A34%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YUTA%20SHINICHI&rft.date=2012-11-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2012233323A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true