MANAGEMENT METHOD AND MANAGEMENT DEVICE OF LOAD TEST FOR WEB SYSTEM
PROBLEM TO BE SOLVED: To provide a management method of a load test for a web system in which a test cooperator can determine participation in the test after recognizing an execution period of the each test.SOLUTION: A test management server 3 transmits, to each user terminal 1, load test notificati...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a management method of a load test for a web system in which a test cooperator can determine participation in the test after recognizing an execution period of the each test.SOLUTION: A test management server 3 transmits, to each user terminal 1, load test notification information indicating a test execution period. The user terminal 1 displays the notification information on a display 16 according to a tool bar program 18. When a user selects the displayed load test to apply for participation in the test, the test management server 3 registers an ID of the user applying for the participation in a test registrant management database 38. When the test execution period of the each load test starts, the test management server 3 transmits a test schedule file with a URL registered in a test load registration database 37 to the user terminal 1 operated by the registered user. The user terminal 1 transmits a message to the URL specified by the test schedule. |
---|