METHOD FOR CONNECTING PRECAST COLUMN AND FOUNDATION, AND TEMPORARY RECEIVING FRAME
PROBLEM TO BE SOLVED: To provide a method for fixing a precast column and a foundation, allowing close-by work in the field with a narrow construction space.SOLUTION: A temporary receiving frame is mounted to the outside of a lower part of the precast column. The precast column is hung down from the...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SHIMIZU SATOSHI KUROIWA TOSHIYUKI HAYAKAWA TADASHI KONDO HIDEKI O TADAAKI OGIWARA KATSUMI YOSHIDA HIROSHI TOMITA SEIICHI KONISHI TETSUJI HATTORI NAOMICHI |
description | PROBLEM TO BE SOLVED: To provide a method for fixing a precast column and a foundation, allowing close-by work in the field with a narrow construction space.SOLUTION: A temporary receiving frame is mounted to the outside of a lower part of the precast column. The precast column is hung down from the top of the foundation. After legs formed at the temporary receiving frame are mounted on the foundation, the height of the precast column is adjusted with leg adjusting bolts. The precast column is connected to each facing reinforcement of the foundation, and at the same time, anchors mounted to the temporary receiving frame are connected to fixing bolts projected from the foundation to apply prestress, thus fixing the temporary receiving frame to the foundation. A form is installed surrounding the precast column and a reinforcement group of the foundation, and concrete is placed in the form. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2011001717A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2011001717A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2011001717A3</originalsourceid><addsrcrecordid>eNrjZAjydQ3x8HdRcPMPUnD29_NzdQ7x9HNXCAhydXYMDgEK-YT6-ik4-oFUhPq5OIZ4-vvpgPkhrr4B_kGOQZEKQLWunmEgbW5Bjr6uPAysaYk5xam8UJqbQcnNNcTZQze1ID8-tbggMTk1L7Uk3ivAyMDQ0MDA0NzQ3NGYKEUAH80v2A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR CONNECTING PRECAST COLUMN AND FOUNDATION, AND TEMPORARY RECEIVING FRAME</title><source>esp@cenet</source><creator>SHIMIZU SATOSHI ; KUROIWA TOSHIYUKI ; HAYAKAWA TADASHI ; KONDO HIDEKI ; O TADAAKI ; OGIWARA KATSUMI ; YOSHIDA HIROSHI ; TOMITA SEIICHI ; KONISHI TETSUJI ; HATTORI NAOMICHI</creator><creatorcontrib>SHIMIZU SATOSHI ; KUROIWA TOSHIYUKI ; HAYAKAWA TADASHI ; KONDO HIDEKI ; O TADAAKI ; OGIWARA KATSUMI ; YOSHIDA HIROSHI ; TOMITA SEIICHI ; KONISHI TETSUJI ; HATTORI NAOMICHI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a method for fixing a precast column and a foundation, allowing close-by work in the field with a narrow construction space.SOLUTION: A temporary receiving frame is mounted to the outside of a lower part of the precast column. The precast column is hung down from the top of the foundation. After legs formed at the temporary receiving frame are mounted on the foundation, the height of the precast column is adjusted with leg adjusting bolts. The precast column is connected to each facing reinforcement of the foundation, and at the same time, anchors mounted to the temporary receiving frame are connected to fixing bolts projected from the foundation to apply prestress, thus fixing the temporary receiving frame to the foundation. A form is installed surrounding the precast column and a reinforcement group of the foundation, and concrete is placed in the form.</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; OR VIADUCTS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2011</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20110106&DB=EPODOC&CC=JP&NR=2011001717A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25566,76549</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20110106&DB=EPODOC&CC=JP&NR=2011001717A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHIMIZU SATOSHI</creatorcontrib><creatorcontrib>KUROIWA TOSHIYUKI</creatorcontrib><creatorcontrib>HAYAKAWA TADASHI</creatorcontrib><creatorcontrib>KONDO HIDEKI</creatorcontrib><creatorcontrib>O TADAAKI</creatorcontrib><creatorcontrib>OGIWARA KATSUMI</creatorcontrib><creatorcontrib>YOSHIDA HIROSHI</creatorcontrib><creatorcontrib>TOMITA SEIICHI</creatorcontrib><creatorcontrib>KONISHI TETSUJI</creatorcontrib><creatorcontrib>HATTORI NAOMICHI</creatorcontrib><title>METHOD FOR CONNECTING PRECAST COLUMN AND FOUNDATION, AND TEMPORARY RECEIVING FRAME</title><description>PROBLEM TO BE SOLVED: To provide a method for fixing a precast column and a foundation, allowing close-by work in the field with a narrow construction space.SOLUTION: A temporary receiving frame is mounted to the outside of a lower part of the precast column. The precast column is hung down from the top of the foundation. After legs formed at the temporary receiving frame are mounted on the foundation, the height of the precast column is adjusted with leg adjusting bolts. The precast column is connected to each facing reinforcement of the foundation, and at the same time, anchors mounted to the temporary receiving frame are connected to fixing bolts projected from the foundation to apply prestress, thus fixing the temporary receiving frame to the foundation. A form is installed surrounding the precast column and a reinforcement group of the foundation, and concrete is placed in the form.</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>OR VIADUCTS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2011</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZAjydQ3x8HdRcPMPUnD29_NzdQ7x9HNXCAhydXYMDgEK-YT6-ik4-oFUhPq5OIZ4-vvpgPkhrr4B_kGOQZEKQLWunmEgbW5Bjr6uPAysaYk5xam8UJqbQcnNNcTZQze1ID8-tbggMTk1L7Uk3ivAyMDQ0MDA0NzQ3NGYKEUAH80v2A</recordid><startdate>20110106</startdate><enddate>20110106</enddate><creator>SHIMIZU SATOSHI</creator><creator>KUROIWA TOSHIYUKI</creator><creator>HAYAKAWA TADASHI</creator><creator>KONDO HIDEKI</creator><creator>O TADAAKI</creator><creator>OGIWARA KATSUMI</creator><creator>YOSHIDA HIROSHI</creator><creator>TOMITA SEIICHI</creator><creator>KONISHI TETSUJI</creator><creator>HATTORI NAOMICHI</creator><scope>EVB</scope></search><sort><creationdate>20110106</creationdate><title>METHOD FOR CONNECTING PRECAST COLUMN AND FOUNDATION, AND TEMPORARY RECEIVING FRAME</title><author>SHIMIZU SATOSHI ; KUROIWA TOSHIYUKI ; HAYAKAWA TADASHI ; KONDO HIDEKI ; O TADAAKI ; OGIWARA KATSUMI ; YOSHIDA HIROSHI ; TOMITA SEIICHI ; KONISHI TETSUJI ; HATTORI NAOMICHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2011001717A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2011</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>OR VIADUCTS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SHIMIZU SATOSHI</creatorcontrib><creatorcontrib>KUROIWA TOSHIYUKI</creatorcontrib><creatorcontrib>HAYAKAWA TADASHI</creatorcontrib><creatorcontrib>KONDO HIDEKI</creatorcontrib><creatorcontrib>O TADAAKI</creatorcontrib><creatorcontrib>OGIWARA KATSUMI</creatorcontrib><creatorcontrib>YOSHIDA HIROSHI</creatorcontrib><creatorcontrib>TOMITA SEIICHI</creatorcontrib><creatorcontrib>KONISHI TETSUJI</creatorcontrib><creatorcontrib>HATTORI NAOMICHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHIMIZU SATOSHI</au><au>KUROIWA TOSHIYUKI</au><au>HAYAKAWA TADASHI</au><au>KONDO HIDEKI</au><au>O TADAAKI</au><au>OGIWARA KATSUMI</au><au>YOSHIDA HIROSHI</au><au>TOMITA SEIICHI</au><au>KONISHI TETSUJI</au><au>HATTORI NAOMICHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR CONNECTING PRECAST COLUMN AND FOUNDATION, AND TEMPORARY RECEIVING FRAME</title><date>2011-01-06</date><risdate>2011</risdate><abstract>PROBLEM TO BE SOLVED: To provide a method for fixing a precast column and a foundation, allowing close-by work in the field with a narrow construction space.SOLUTION: A temporary receiving frame is mounted to the outside of a lower part of the precast column. The precast column is hung down from the top of the foundation. After legs formed at the temporary receiving frame are mounted on the foundation, the height of the precast column is adjusted with leg adjusting bolts. The precast column is connected to each facing reinforcement of the foundation, and at the same time, anchors mounted to the temporary receiving frame are connected to fixing bolts projected from the foundation to apply prestress, thus fixing the temporary receiving frame to the foundation. A form is installed surrounding the precast column and a reinforcement group of the foundation, and concrete is placed in the form.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2011001717A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING OR VIADUCTS SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | METHOD FOR CONNECTING PRECAST COLUMN AND FOUNDATION, AND TEMPORARY RECEIVING FRAME |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-17T15%3A36%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHIMIZU%20SATOSHI&rft.date=2011-01-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2011001717A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |