INSTALLATION METHOD FOR TIMBERING FOR BRIDGE
PROBLEM TO BE SOLVED: To provide an installation method for timbering for a bridge, suppressing the use of a steel material and hardly affected by a temperature change. SOLUTION: The installation method for timbering for the bridge includes a pile installation step of installing piles in the ground;...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YAMANE KAORU YAMAMOTO SHIGEHARU MATSUMOTO TAKUYA HANADA NORIAKI |
description | PROBLEM TO BE SOLVED: To provide an installation method for timbering for a bridge, suppressing the use of a steel material and hardly affected by a temperature change. SOLUTION: The installation method for timbering for the bridge includes a pile installation step of installing piles in the ground; a pile-cap installation step of installing pile-caps on the piles; a foundation block installation step of installing precast concrete blocks on the pile caps; a stacking step of stacking blocks on the foundation blocks by a dry joint method; a steel rod adding step of adding other steel rods to steel rods projected from the lower blocks; a post installation step of repeating the stacking step and the steel rod adding step to install a pair of posts; a prestressing step of prestressing every time the predetermined number of blocks are stacked; a brace member installation step of installing truss type bracing members to be laid between the pair of posts; and a steel block installation step of installing steel blocks for supporting a concrete skeleton at the uppermost position of the posts. COPYRIGHT: (C)2010,JPO&INPIT |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2010138617A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2010138617A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2010138617A3</originalsourceid><addsrcrecordid>eNrjZNDx9AsOcfTxcQzx9PdT8HUN8fB3UXDzD1II8fR1cg3y9HMH85yCPF3cXXkYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbxXgJGBoYGhsYWZobmjMVGKAOHOJZA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>INSTALLATION METHOD FOR TIMBERING FOR BRIDGE</title><source>esp@cenet</source><creator>YAMANE KAORU ; YAMAMOTO SHIGEHARU ; MATSUMOTO TAKUYA ; HANADA NORIAKI</creator><creatorcontrib>YAMANE KAORU ; YAMAMOTO SHIGEHARU ; MATSUMOTO TAKUYA ; HANADA NORIAKI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide an installation method for timbering for a bridge, suppressing the use of a steel material and hardly affected by a temperature change. SOLUTION: The installation method for timbering for the bridge includes a pile installation step of installing piles in the ground; a pile-cap installation step of installing pile-caps on the piles; a foundation block installation step of installing precast concrete blocks on the pile caps; a stacking step of stacking blocks on the foundation blocks by a dry joint method; a steel rod adding step of adding other steel rods to steel rods projected from the lower blocks; a post installation step of repeating the stacking step and the steel rod adding step to install a pair of posts; a prestressing step of prestressing every time the predetermined number of blocks are stacked; a brace member installation step of installing truss type bracing members to be laid between the pair of posts; and a steel block installation step of installing steel blocks for supporting a concrete skeleton at the uppermost position of the posts. COPYRIGHT: (C)2010,JPO&INPIT</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2010</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20100624&DB=EPODOC&CC=JP&NR=2010138617A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20100624&DB=EPODOC&CC=JP&NR=2010138617A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YAMANE KAORU</creatorcontrib><creatorcontrib>YAMAMOTO SHIGEHARU</creatorcontrib><creatorcontrib>MATSUMOTO TAKUYA</creatorcontrib><creatorcontrib>HANADA NORIAKI</creatorcontrib><title>INSTALLATION METHOD FOR TIMBERING FOR BRIDGE</title><description>PROBLEM TO BE SOLVED: To provide an installation method for timbering for a bridge, suppressing the use of a steel material and hardly affected by a temperature change. SOLUTION: The installation method for timbering for the bridge includes a pile installation step of installing piles in the ground; a pile-cap installation step of installing pile-caps on the piles; a foundation block installation step of installing precast concrete blocks on the pile caps; a stacking step of stacking blocks on the foundation blocks by a dry joint method; a steel rod adding step of adding other steel rods to steel rods projected from the lower blocks; a post installation step of repeating the stacking step and the steel rod adding step to install a pair of posts; a prestressing step of prestressing every time the predetermined number of blocks are stacked; a brace member installation step of installing truss type bracing members to be laid between the pair of posts; and a steel block installation step of installing steel blocks for supporting a concrete skeleton at the uppermost position of the posts. COPYRIGHT: (C)2010,JPO&INPIT</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2010</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNDx9AsOcfTxcQzx9PdT8HUN8fB3UXDzD1II8fR1cg3y9HMH85yCPF3cXXkYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbxXgJGBoYGhsYWZobmjMVGKAOHOJZA</recordid><startdate>20100624</startdate><enddate>20100624</enddate><creator>YAMANE KAORU</creator><creator>YAMAMOTO SHIGEHARU</creator><creator>MATSUMOTO TAKUYA</creator><creator>HANADA NORIAKI</creator><scope>EVB</scope></search><sort><creationdate>20100624</creationdate><title>INSTALLATION METHOD FOR TIMBERING FOR BRIDGE</title><author>YAMANE KAORU ; YAMAMOTO SHIGEHARU ; MATSUMOTO TAKUYA ; HANADA NORIAKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2010138617A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2010</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>YAMANE KAORU</creatorcontrib><creatorcontrib>YAMAMOTO SHIGEHARU</creatorcontrib><creatorcontrib>MATSUMOTO TAKUYA</creatorcontrib><creatorcontrib>HANADA NORIAKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YAMANE KAORU</au><au>YAMAMOTO SHIGEHARU</au><au>MATSUMOTO TAKUYA</au><au>HANADA NORIAKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>INSTALLATION METHOD FOR TIMBERING FOR BRIDGE</title><date>2010-06-24</date><risdate>2010</risdate><abstract>PROBLEM TO BE SOLVED: To provide an installation method for timbering for a bridge, suppressing the use of a steel material and hardly affected by a temperature change. SOLUTION: The installation method for timbering for the bridge includes a pile installation step of installing piles in the ground; a pile-cap installation step of installing pile-caps on the piles; a foundation block installation step of installing precast concrete blocks on the pile caps; a stacking step of stacking blocks on the foundation blocks by a dry joint method; a steel rod adding step of adding other steel rods to steel rods projected from the lower blocks; a post installation step of repeating the stacking step and the steel rod adding step to install a pair of posts; a prestressing step of prestressing every time the predetermined number of blocks are stacked; a brace member installation step of installing truss type bracing members to be laid between the pair of posts; and a steel block installation step of installing steel blocks for supporting a concrete skeleton at the uppermost position of the posts. COPYRIGHT: (C)2010,JPO&INPIT</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2010138617A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | INSTALLATION METHOD FOR TIMBERING FOR BRIDGE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T05%3A49%3A02IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YAMANE%20KAORU&rft.date=2010-06-24&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2010138617A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |