VERTICAL SHAFT AND ITS CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To construct a large bore vertical shaft even in the soft ground of a city part or the like, to reduce an occupied area of the vertical shaft in the ground part and to reduce a construction period of a diameter enlarged part. SOLUTION: The vertical shaft 1 is constructed by exc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: YABE YUKIO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YABE YUKIO
description PROBLEM TO BE SOLVED: To construct a large bore vertical shaft even in the soft ground of a city part or the like, to reduce an occupied area of the vertical shaft in the ground part and to reduce a construction period of a diameter enlarged part. SOLUTION: The vertical shaft 1 is constructed by excavating a small bore vertical shaft 10 from the ground part 2, placing a plurality of curved pipe roofs 21 from a lower inner peripheral wall 10a of the small bore vertical shaft 10 toward the radial outside of the small bore vertical shaft 10 over the whole outer periphery so that the tips face downward, excavating the inside of the placed curved pipe roofs 21 to form the diameter enlarged part 20, and excavating under the diameter enlarged part 20 to construct a large bore vertical shaft 30 larger in diameter than the small bore vertical shaft 10. COPYRIGHT: (C)2009,JPO&INPIT
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2009074309A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2009074309A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2009074309A3</originalsourceid><addsrcrecordid>eNrjZNAKcw0K8XR29FEI9nB0C1Fw9HNR8AwJVnD29wsOCQp1DvH091PwdQ3x8HfhYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgaWBuYmxgaWjsZEKQIAnZolKA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>VERTICAL SHAFT AND ITS CONSTRUCTION METHOD</title><source>esp@cenet</source><creator>YABE YUKIO</creator><creatorcontrib>YABE YUKIO</creatorcontrib><description>PROBLEM TO BE SOLVED: To construct a large bore vertical shaft even in the soft ground of a city part or the like, to reduce an occupied area of the vertical shaft in the ground part and to reduce a construction period of a diameter enlarged part. SOLUTION: The vertical shaft 1 is constructed by excavating a small bore vertical shaft 10 from the ground part 2, placing a plurality of curved pipe roofs 21 from a lower inner peripheral wall 10a of the small bore vertical shaft 10 toward the radial outside of the small bore vertical shaft 10 over the whole outer periphery so that the tips face downward, excavating the inside of the placed curved pipe roofs 21 to form the diameter enlarged part 20, and excavating under the diameter enlarged part 20 to construct a large bore vertical shaft 30 larger in diameter than the small bore vertical shaft 10. COPYRIGHT: (C)2009,JPO&amp;INPIT</description><language>eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2009</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20090409&amp;DB=EPODOC&amp;CC=JP&amp;NR=2009074309A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20090409&amp;DB=EPODOC&amp;CC=JP&amp;NR=2009074309A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YABE YUKIO</creatorcontrib><title>VERTICAL SHAFT AND ITS CONSTRUCTION METHOD</title><description>PROBLEM TO BE SOLVED: To construct a large bore vertical shaft even in the soft ground of a city part or the like, to reduce an occupied area of the vertical shaft in the ground part and to reduce a construction period of a diameter enlarged part. SOLUTION: The vertical shaft 1 is constructed by excavating a small bore vertical shaft 10 from the ground part 2, placing a plurality of curved pipe roofs 21 from a lower inner peripheral wall 10a of the small bore vertical shaft 10 toward the radial outside of the small bore vertical shaft 10 over the whole outer periphery so that the tips face downward, excavating the inside of the placed curved pipe roofs 21 to form the diameter enlarged part 20, and excavating under the diameter enlarged part 20 to construct a large bore vertical shaft 30 larger in diameter than the small bore vertical shaft 10. COPYRIGHT: (C)2009,JPO&amp;INPIT</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2009</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAKcw0K8XR29FEI9nB0C1Fw9HNR8AwJVnD29wsOCQp1DvH091PwdQ3x8HfhYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgaWBuYmxgaWjsZEKQIAnZolKA</recordid><startdate>20090409</startdate><enddate>20090409</enddate><creator>YABE YUKIO</creator><scope>EVB</scope></search><sort><creationdate>20090409</creationdate><title>VERTICAL SHAFT AND ITS CONSTRUCTION METHOD</title><author>YABE YUKIO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2009074309A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2009</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>YABE YUKIO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YABE YUKIO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>VERTICAL SHAFT AND ITS CONSTRUCTION METHOD</title><date>2009-04-09</date><risdate>2009</risdate><abstract>PROBLEM TO BE SOLVED: To construct a large bore vertical shaft even in the soft ground of a city part or the like, to reduce an occupied area of the vertical shaft in the ground part and to reduce a construction period of a diameter enlarged part. SOLUTION: The vertical shaft 1 is constructed by excavating a small bore vertical shaft 10 from the ground part 2, placing a plurality of curved pipe roofs 21 from a lower inner peripheral wall 10a of the small bore vertical shaft 10 toward the radial outside of the small bore vertical shaft 10 over the whole outer periphery so that the tips face downward, excavating the inside of the placed curved pipe roofs 21 to form the diameter enlarged part 20, and excavating under the diameter enlarged part 20 to construct a large bore vertical shaft 30 larger in diameter than the small bore vertical shaft 10. COPYRIGHT: (C)2009,JPO&amp;INPIT</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2009074309A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title VERTICAL SHAFT AND ITS CONSTRUCTION METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T18%3A44%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YABE%20YUKIO&rft.date=2009-04-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2009074309A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true