PRODUCTION PLANNING METHOD, SYSTEM AND PROGRAM
PROBLEM TO BE SOLVED: To provide a technique reducing a possible economic loss by performing production planning before completion of development in an introduction period of a product life cycle based on a theoretical basis, and generalizing a planning skill by automatic calculation. SOLUTION: The...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YAMAGUCHI YORIYOSHI |
description | PROBLEM TO BE SOLVED: To provide a technique reducing a possible economic loss by performing production planning before completion of development in an introduction period of a product life cycle based on a theoretical basis, and generalizing a planning skill by automatic calculation. SOLUTION: The method comprises steps of calculating a production cost accumulated amount obtained by an arithmetic means by reading, based on a development completion time, each part constituting a product and a working cost unit price thereof from a storage device and accumulating them at each occurrence; calculating a sales opportunity loss accumulated amount by the arithmetic means by reading a daily demand quantity and a market unit price at each point in a production lead time period from start of production from the development completion to shipping and accumulating products thereof; and calculating a sum of the calculated sales opportunity loss accumulated amount and production cost accumulated amount at each point of time by the arithmetic means, and determining a time when the calculated sum is minimized as a mass production start date. COPYRIGHT: (C)2008,JPO&INPIT |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2008046760A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2008046760A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2008046760A3</originalsourceid><addsrcrecordid>eNrjZNALCPJ3CXUO8fT3UwjwcfTz8_RzV_B1DfHwd9FRCI4MDnH1VXD0c1EAKnMPcvTlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgYWBiZm5mYGjsZEKQIAO6wmRg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PRODUCTION PLANNING METHOD, SYSTEM AND PROGRAM</title><source>esp@cenet</source><creator>YAMAGUCHI YORIYOSHI</creator><creatorcontrib>YAMAGUCHI YORIYOSHI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a technique reducing a possible economic loss by performing production planning before completion of development in an introduction period of a product life cycle based on a theoretical basis, and generalizing a planning skill by automatic calculation. SOLUTION: The method comprises steps of calculating a production cost accumulated amount obtained by an arithmetic means by reading, based on a development completion time, each part constituting a product and a working cost unit price thereof from a storage device and accumulating them at each occurrence; calculating a sales opportunity loss accumulated amount by the arithmetic means by reading a daily demand quantity and a market unit price at each point in a production lead time period from start of production from the development completion to shipping and accumulating products thereof; and calculating a sum of the calculated sales opportunity loss accumulated amount and production cost accumulated amount at each point of time by the arithmetic means, and determining a time when the calculated sum is minimized as a mass production start date. COPYRIGHT: (C)2008,JPO&INPIT</description><language>eng</language><subject>CALCULATING ; COMPUTING ; CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2008</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20080228&DB=EPODOC&CC=JP&NR=2008046760A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20080228&DB=EPODOC&CC=JP&NR=2008046760A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YAMAGUCHI YORIYOSHI</creatorcontrib><title>PRODUCTION PLANNING METHOD, SYSTEM AND PROGRAM</title><description>PROBLEM TO BE SOLVED: To provide a technique reducing a possible economic loss by performing production planning before completion of development in an introduction period of a product life cycle based on a theoretical basis, and generalizing a planning skill by automatic calculation. SOLUTION: The method comprises steps of calculating a production cost accumulated amount obtained by an arithmetic means by reading, based on a development completion time, each part constituting a product and a working cost unit price thereof from a storage device and accumulating them at each occurrence; calculating a sales opportunity loss accumulated amount by the arithmetic means by reading a daily demand quantity and a market unit price at each point in a production lead time period from start of production from the development completion to shipping and accumulating products thereof; and calculating a sum of the calculated sales opportunity loss accumulated amount and production cost accumulated amount at each point of time by the arithmetic means, and determining a time when the calculated sum is minimized as a mass production start date. COPYRIGHT: (C)2008,JPO&INPIT</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2008</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNALCPJ3CXUO8fT3UwjwcfTz8_RzV_B1DfHwd9FRCI4MDnH1VXD0c1EAKnMPcvTlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgYWBiZm5mYGjsZEKQIAO6wmRg</recordid><startdate>20080228</startdate><enddate>20080228</enddate><creator>YAMAGUCHI YORIYOSHI</creator><scope>EVB</scope></search><sort><creationdate>20080228</creationdate><title>PRODUCTION PLANNING METHOD, SYSTEM AND PROGRAM</title><author>YAMAGUCHI YORIYOSHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2008046760A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2008</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>YAMAGUCHI YORIYOSHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YAMAGUCHI YORIYOSHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PRODUCTION PLANNING METHOD, SYSTEM AND PROGRAM</title><date>2008-02-28</date><risdate>2008</risdate><abstract>PROBLEM TO BE SOLVED: To provide a technique reducing a possible economic loss by performing production planning before completion of development in an introduction period of a product life cycle based on a theoretical basis, and generalizing a planning skill by automatic calculation. SOLUTION: The method comprises steps of calculating a production cost accumulated amount obtained by an arithmetic means by reading, based on a development completion time, each part constituting a product and a working cost unit price thereof from a storage device and accumulating them at each occurrence; calculating a sales opportunity loss accumulated amount by the arithmetic means by reading a daily demand quantity and a market unit price at each point in a production lead time period from start of production from the development completion to shipping and accumulating products thereof; and calculating a sum of the calculated sales opportunity loss accumulated amount and production cost accumulated amount at each point of time by the arithmetic means, and determining a time when the calculated sum is minimized as a mass production start date. COPYRIGHT: (C)2008,JPO&INPIT</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2008046760A |
source | esp@cenet |
subjects | CALCULATING COMPUTING CONTROL OR REGULATING SYSTEMS IN GENERAL CONTROLLING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES FUNCTIONAL ELEMENTS OF SUCH SYSTEMS MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS PHYSICS REGULATING SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | PRODUCTION PLANNING METHOD, SYSTEM AND PROGRAM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T13%3A32%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YAMAGUCHI%20YORIYOSHI&rft.date=2008-02-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2008046760A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |