FOUNDATION STRUCTURE USING EXISTING PILE AND NEW PILE
PROBLEM TO BE SOLVED: To provide a foundation structure using an existing pile and a new pile, superior in workability, and capable of rationally reusing the existing pile, by surely making a horizontal load to be shared by the existing pile more less than the new pile. SOLUTION: This foundation str...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | NAGAO TOSHIMASA ONO MORISHI HORII YOSHIHIRO SUZUKI HIROMI KANEDA KAZUHIRO |
description | PROBLEM TO BE SOLVED: To provide a foundation structure using an existing pile and a new pile, superior in workability, and capable of rationally reusing the existing pile, by surely making a horizontal load to be shared by the existing pile more less than the new pile. SOLUTION: This foundation structure has the existing pile 1 remaining in the ground by removing an existing structure, the new pile 3 driven in a predetermined position separated from this existing pile, and a new foundation 4 constructed on a pile head of these existing pile and new pile, and is characterized in that the existing pile 1 and the new pile 3 are respectively joined to the new foundation 4 by the same fixing condition, and the new pile 3 is set to a pile diameter D2or more of the existing pile in its pile diameter D1, and is formed for sharing the horizontal load larger than the existing pile 1. COPYRIGHT: (C)2008,JPO&INPIT |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2007315136A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2007315136A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2007315136A3</originalsourceid><addsrcrecordid>eNrjZDB18w_1c3EM8fT3UwgOCQp1DgkNclUIDfb0c1dwjfAMDgExAjx9XBUc_VwU_FzDwRweBta0xJziVF4ozc2g5OYa4uyhm1qQH59aXJCYnJqXWhLvFWBkYGBubGhqaGzmaEyUIgBVRSgy</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>FOUNDATION STRUCTURE USING EXISTING PILE AND NEW PILE</title><source>esp@cenet</source><creator>NAGAO TOSHIMASA ; ONO MORISHI ; HORII YOSHIHIRO ; SUZUKI HIROMI ; KANEDA KAZUHIRO</creator><creatorcontrib>NAGAO TOSHIMASA ; ONO MORISHI ; HORII YOSHIHIRO ; SUZUKI HIROMI ; KANEDA KAZUHIRO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a foundation structure using an existing pile and a new pile, superior in workability, and capable of rationally reusing the existing pile, by surely making a horizontal load to be shared by the existing pile more less than the new pile. SOLUTION: This foundation structure has the existing pile 1 remaining in the ground by removing an existing structure, the new pile 3 driven in a predetermined position separated from this existing pile, and a new foundation 4 constructed on a pile head of these existing pile and new pile, and is characterized in that the existing pile 1 and the new pile 3 are respectively joined to the new foundation 4 by the same fixing condition, and the new pile 3 is set to a pile diameter D2or more of the existing pile in its pile diameter D1, and is formed for sharing the horizontal load larger than the existing pile 1. COPYRIGHT: (C)2008,JPO&INPIT</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20071206&DB=EPODOC&CC=JP&NR=2007315136A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20071206&DB=EPODOC&CC=JP&NR=2007315136A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NAGAO TOSHIMASA</creatorcontrib><creatorcontrib>ONO MORISHI</creatorcontrib><creatorcontrib>HORII YOSHIHIRO</creatorcontrib><creatorcontrib>SUZUKI HIROMI</creatorcontrib><creatorcontrib>KANEDA KAZUHIRO</creatorcontrib><title>FOUNDATION STRUCTURE USING EXISTING PILE AND NEW PILE</title><description>PROBLEM TO BE SOLVED: To provide a foundation structure using an existing pile and a new pile, superior in workability, and capable of rationally reusing the existing pile, by surely making a horizontal load to be shared by the existing pile more less than the new pile. SOLUTION: This foundation structure has the existing pile 1 remaining in the ground by removing an existing structure, the new pile 3 driven in a predetermined position separated from this existing pile, and a new foundation 4 constructed on a pile head of these existing pile and new pile, and is characterized in that the existing pile 1 and the new pile 3 are respectively joined to the new foundation 4 by the same fixing condition, and the new pile 3 is set to a pile diameter D2or more of the existing pile in its pile diameter D1, and is formed for sharing the horizontal load larger than the existing pile 1. COPYRIGHT: (C)2008,JPO&INPIT</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB18w_1c3EM8fT3UwgOCQp1DgkNclUIDfb0c1dwjfAMDgExAjx9XBUc_VwU_FzDwRweBta0xJziVF4ozc2g5OYa4uyhm1qQH59aXJCYnJqXWhLvFWBkYGBubGhqaGzmaEyUIgBVRSgy</recordid><startdate>20071206</startdate><enddate>20071206</enddate><creator>NAGAO TOSHIMASA</creator><creator>ONO MORISHI</creator><creator>HORII YOSHIHIRO</creator><creator>SUZUKI HIROMI</creator><creator>KANEDA KAZUHIRO</creator><scope>EVB</scope></search><sort><creationdate>20071206</creationdate><title>FOUNDATION STRUCTURE USING EXISTING PILE AND NEW PILE</title><author>NAGAO TOSHIMASA ; ONO MORISHI ; HORII YOSHIHIRO ; SUZUKI HIROMI ; KANEDA KAZUHIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2007315136A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>NAGAO TOSHIMASA</creatorcontrib><creatorcontrib>ONO MORISHI</creatorcontrib><creatorcontrib>HORII YOSHIHIRO</creatorcontrib><creatorcontrib>SUZUKI HIROMI</creatorcontrib><creatorcontrib>KANEDA KAZUHIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NAGAO TOSHIMASA</au><au>ONO MORISHI</au><au>HORII YOSHIHIRO</au><au>SUZUKI HIROMI</au><au>KANEDA KAZUHIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>FOUNDATION STRUCTURE USING EXISTING PILE AND NEW PILE</title><date>2007-12-06</date><risdate>2007</risdate><abstract>PROBLEM TO BE SOLVED: To provide a foundation structure using an existing pile and a new pile, superior in workability, and capable of rationally reusing the existing pile, by surely making a horizontal load to be shared by the existing pile more less than the new pile. SOLUTION: This foundation structure has the existing pile 1 remaining in the ground by removing an existing structure, the new pile 3 driven in a predetermined position separated from this existing pile, and a new foundation 4 constructed on a pile head of these existing pile and new pile, and is characterized in that the existing pile 1 and the new pile 3 are respectively joined to the new foundation 4 by the same fixing condition, and the new pile 3 is set to a pile diameter D2or more of the existing pile in its pile diameter D1, and is formed for sharing the horizontal load larger than the existing pile 1. COPYRIGHT: (C)2008,JPO&INPIT</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2007315136A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | FOUNDATION STRUCTURE USING EXISTING PILE AND NEW PILE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T12%3A01%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NAGAO%20TOSHIMASA&rft.date=2007-12-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2007315136A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |