BUILDING

PROBLEM TO BE SOLVED: To provide a building which flexibly copes with alteration of partitions, electric facilities, plumbing equipment, and air conditioning of a habitable room space. SOLUTION: The building 100 is formed of a planar structure, a prestressed concrete slab 103, and an electricity/dra...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TANEMURA NAOYUKI, YUYAMA YASUKI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TANEMURA NAOYUKI
YUYAMA YASUKI
description PROBLEM TO BE SOLVED: To provide a building which flexibly copes with alteration of partitions, electric facilities, plumbing equipment, and air conditioning of a habitable room space. SOLUTION: The building 100 is formed of a planar structure, a prestressed concrete slab 103, and an electricity/drain pipe arrangement space 104. The planar structure is set up such that in an internal space defined by an external wall as a core wall 101, facility spaces 200 (mainly formed of staircase spaces 201, spaces 202 for extension, and machine room spaces 203) are arranged on mutually opposed end areas of the internal space, that mutually equivalent spaces of the facility spaces 200 are arranged at locations point-symmetrical with respect to each other, and that the habitual room space 300 is arranged at the center of the internal space which is an intermediate area of the facility spaces 200. The prestressed concrete slab 103 has a plurality of ribs 1031 arranged in parallel with each other. The electricity/drain pipe arrangement space 104 is secured under floors of the facility spaces 200 and the habitable room space 300. As a result, the building 100 which has imparted thereto versatility in planar schedule, facility schedule, and interior finish schedule, while taking future application change into consideration, and flexibly copes with alteration of the partitions, electric facilities, plumbing equipment, and air conditioning of the habitable room space 300, can be obtained. COPYRIGHT: (C)2008,JPO&INPIT
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2007315039A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2007315039A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2007315039A3</originalsourceid><addsrcrecordid>eNrjZOBwCvX0cfH0c-dhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGBubGhqYGxpaOxkQpAgBUhhut</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>BUILDING</title><source>esp@cenet</source><creator>TANEMURA NAOYUKI ; YUYAMA YASUKI</creator><creatorcontrib>TANEMURA NAOYUKI ; YUYAMA YASUKI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a building which flexibly copes with alteration of partitions, electric facilities, plumbing equipment, and air conditioning of a habitable room space. SOLUTION: The building 100 is formed of a planar structure, a prestressed concrete slab 103, and an electricity/drain pipe arrangement space 104. The planar structure is set up such that in an internal space defined by an external wall as a core wall 101, facility spaces 200 (mainly formed of staircase spaces 201, spaces 202 for extension, and machine room spaces 203) are arranged on mutually opposed end areas of the internal space, that mutually equivalent spaces of the facility spaces 200 are arranged at locations point-symmetrical with respect to each other, and that the habitual room space 300 is arranged at the center of the internal space which is an intermediate area of the facility spaces 200. The prestressed concrete slab 103 has a plurality of ribs 1031 arranged in parallel with each other. The electricity/drain pipe arrangement space 104 is secured under floors of the facility spaces 200 and the habitable room space 300. As a result, the building 100 which has imparted thereto versatility in planar schedule, facility schedule, and interior finish schedule, while taking future application change into consideration, and flexibly copes with alteration of the partitions, electric facilities, plumbing equipment, and air conditioning of the habitable room space 300, can be obtained. COPYRIGHT: (C)2008,JPO&amp;INPIT</description><language>eng</language><subject>BUILDING ; BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES ; CEILINGS ; FENCING ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; MASTS ; ROOFS ; SWIMMING OR SPLASH BATHS OR POOLS ; TENTS OR CANOPIES, IN GENERAL ; WALLS, e.g. PARTITIONS</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20071206&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007315039A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20071206&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007315039A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TANEMURA NAOYUKI</creatorcontrib><creatorcontrib>YUYAMA YASUKI</creatorcontrib><title>BUILDING</title><description>PROBLEM TO BE SOLVED: To provide a building which flexibly copes with alteration of partitions, electric facilities, plumbing equipment, and air conditioning of a habitable room space. SOLUTION: The building 100 is formed of a planar structure, a prestressed concrete slab 103, and an electricity/drain pipe arrangement space 104. The planar structure is set up such that in an internal space defined by an external wall as a core wall 101, facility spaces 200 (mainly formed of staircase spaces 201, spaces 202 for extension, and machine room spaces 203) are arranged on mutually opposed end areas of the internal space, that mutually equivalent spaces of the facility spaces 200 are arranged at locations point-symmetrical with respect to each other, and that the habitual room space 300 is arranged at the center of the internal space which is an intermediate area of the facility spaces 200. The prestressed concrete slab 103 has a plurality of ribs 1031 arranged in parallel with each other. The electricity/drain pipe arrangement space 104 is secured under floors of the facility spaces 200 and the habitable room space 300. As a result, the building 100 which has imparted thereto versatility in planar schedule, facility schedule, and interior finish schedule, while taking future application change into consideration, and flexibly copes with alteration of the partitions, electric facilities, plumbing equipment, and air conditioning of the habitable room space 300, can be obtained. COPYRIGHT: (C)2008,JPO&amp;INPIT</description><subject>BUILDING</subject><subject>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</subject><subject>CEILINGS</subject><subject>FENCING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>MASTS</subject><subject>ROOFS</subject><subject>SWIMMING OR SPLASH BATHS OR POOLS</subject><subject>TENTS OR CANOPIES, IN GENERAL</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZOBwCvX0cfH0c-dhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGBubGhqYGxpaOxkQpAgBUhhut</recordid><startdate>20071206</startdate><enddate>20071206</enddate><creator>TANEMURA NAOYUKI</creator><creator>YUYAMA YASUKI</creator><scope>EVB</scope></search><sort><creationdate>20071206</creationdate><title>BUILDING</title><author>TANEMURA NAOYUKI ; YUYAMA YASUKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2007315039A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>BUILDING</topic><topic>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</topic><topic>CEILINGS</topic><topic>FENCING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>MASTS</topic><topic>ROOFS</topic><topic>SWIMMING OR SPLASH BATHS OR POOLS</topic><topic>TENTS OR CANOPIES, IN GENERAL</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>TANEMURA NAOYUKI</creatorcontrib><creatorcontrib>YUYAMA YASUKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TANEMURA NAOYUKI</au><au>YUYAMA YASUKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>BUILDING</title><date>2007-12-06</date><risdate>2007</risdate><abstract>PROBLEM TO BE SOLVED: To provide a building which flexibly copes with alteration of partitions, electric facilities, plumbing equipment, and air conditioning of a habitable room space. SOLUTION: The building 100 is formed of a planar structure, a prestressed concrete slab 103, and an electricity/drain pipe arrangement space 104. The planar structure is set up such that in an internal space defined by an external wall as a core wall 101, facility spaces 200 (mainly formed of staircase spaces 201, spaces 202 for extension, and machine room spaces 203) are arranged on mutually opposed end areas of the internal space, that mutually equivalent spaces of the facility spaces 200 are arranged at locations point-symmetrical with respect to each other, and that the habitual room space 300 is arranged at the center of the internal space which is an intermediate area of the facility spaces 200. The prestressed concrete slab 103 has a plurality of ribs 1031 arranged in parallel with each other. The electricity/drain pipe arrangement space 104 is secured under floors of the facility spaces 200 and the habitable room space 300. As a result, the building 100 which has imparted thereto versatility in planar schedule, facility schedule, and interior finish schedule, while taking future application change into consideration, and flexibly copes with alteration of the partitions, electric facilities, plumbing equipment, and air conditioning of the habitable room space 300, can be obtained. COPYRIGHT: (C)2008,JPO&amp;INPIT</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2007315039A
source esp@cenet
subjects BUILDING
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
CEILINGS
FENCING
FIXED CONSTRUCTIONS
FLOORS
GENERAL BUILDING CONSTRUCTIONS
INSULATION OR OTHER PROTECTION OF BUILDINGS
MASTS
ROOFS
SWIMMING OR SPLASH BATHS OR POOLS
TENTS OR CANOPIES, IN GENERAL
WALLS, e.g. PARTITIONS
title BUILDING
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T07%3A49%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TANEMURA%20NAOYUKI&rft.date=2007-12-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2007315039A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true