POWER SYSTEM SUPERVISORY CONTROL SYSTEM
PROBLEM TO BE SOLVED: To avoid unsupervisable or uncontrollable state of a power system without causing increase in plant and equipment investment cost or maintenance administrative expense. SOLUTION: In the power system supervisory control system where a power system supervisory controller 2, a rem...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To avoid unsupervisable or uncontrollable state of a power system without causing increase in plant and equipment investment cost or maintenance administrative expense. SOLUTION: In the power system supervisory control system where a power system supervisory controller 2, a remote supervisory controller 5 and a terminal 200 are connected by a network 3, the remote supervisory controller 5 comprises a means 502 for storing the system definition information of a power system, a system display control function 503 for making a system diagram by analyzing the system definition information, and a Web server 504 for transferring the processing results from the system display control function to the terminal 200 through a network 3 and receiving a request from the terminal 200 wherein the terminal 200 comprises a means 502 for displaying the system diagram made by the system display control function 503. COPYRIGHT: (C)2008,JPO&INPIT |
---|