METHOD OF CONSTRUCTING ONE-COLUMN ONE-PILE FOUNDATION STRUCTURE

PROBLEM TO BE SOLVED: To provide a method of constructing a one-column one-pile foundation structure in which a core of a pile and a core of a column base can be correctly aligned with each other, and a pile driving error can be absorbed. SOLUTION: In the method of constructing the one-column one-pi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MIYAKE HIROHISA, KATO MOTOKI, NISHI YUTAKA, OKAMOTO YASUO, MORISHITA KUNIHIRO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MIYAKE HIROHISA
KATO MOTOKI
NISHI YUTAKA
OKAMOTO YASUO
MORISHITA KUNIHIRO
description PROBLEM TO BE SOLVED: To provide a method of constructing a one-column one-pile foundation structure in which a core of a pile and a core of a column base can be correctly aligned with each other, and a pile driving error can be absorbed. SOLUTION: In the method of constructing the one-column one-pile structure 10 in which the single column base 13 is supported by the single pile 11, the pile 11, the column base 13, and a connection member 12 connecting the pile 11 and the column base 13 are carried in the construction field individually from one another. Then the pile 11 is embedded in the ground G at a predetermined location, and the connection member 12 is mounted to the pile head of the pile 11, the core of the pile 11 is aligned with a core of the connection member 12, to thereby connect the pile 11 and the connection member 12. Thereafter the tip of the column base 13 is inserted into an internal space of the connection member 12 via the opening end of the connection member 12, and after adjusting vertical and horizontal positions of the column base 13, the connection member 12 and the column base 13 are connected to each other. COPYRIGHT: (C)2007,JPO&INPIT
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2007063854A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2007063854A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2007063854A3</originalsourceid><addsrcrecordid>eNrjZLD3dQ3x8HdR8HdTcPb3Cw4JCnUO8fRzV_D3c9V19vcJ9fUDMwM8fVwV3PxD_VwcQzz9_RQgCkODXHkYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbxXgJGBgbmBmbGFqYmjMVGKAPxXKzc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF CONSTRUCTING ONE-COLUMN ONE-PILE FOUNDATION STRUCTURE</title><source>esp@cenet</source><creator>MIYAKE HIROHISA ; KATO MOTOKI ; NISHI YUTAKA ; OKAMOTO YASUO ; MORISHITA KUNIHIRO</creator><creatorcontrib>MIYAKE HIROHISA ; KATO MOTOKI ; NISHI YUTAKA ; OKAMOTO YASUO ; MORISHITA KUNIHIRO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a method of constructing a one-column one-pile foundation structure in which a core of a pile and a core of a column base can be correctly aligned with each other, and a pile driving error can be absorbed. SOLUTION: In the method of constructing the one-column one-pile structure 10 in which the single column base 13 is supported by the single pile 11, the pile 11, the column base 13, and a connection member 12 connecting the pile 11 and the column base 13 are carried in the construction field individually from one another. Then the pile 11 is embedded in the ground G at a predetermined location, and the connection member 12 is mounted to the pile head of the pile 11, the core of the pile 11 is aligned with a core of the connection member 12, to thereby connect the pile 11 and the connection member 12. Thereafter the tip of the column base 13 is inserted into an internal space of the connection member 12 via the opening end of the connection member 12, and after adjusting vertical and horizontal positions of the column base 13, the connection member 12 and the column base 13 are connected to each other. COPYRIGHT: (C)2007,JPO&amp;INPIT</description><language>eng</language><subject>BUILDING ; CEILINGS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FLOORS ; FOUNDATIONS ; GENERAL BUILDING CONSTRUCTIONS ; HYDRAULIC ENGINEERING ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WALLS, e.g. PARTITIONS</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070315&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007063854A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25566,76549</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070315&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007063854A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MIYAKE HIROHISA</creatorcontrib><creatorcontrib>KATO MOTOKI</creatorcontrib><creatorcontrib>NISHI YUTAKA</creatorcontrib><creatorcontrib>OKAMOTO YASUO</creatorcontrib><creatorcontrib>MORISHITA KUNIHIRO</creatorcontrib><title>METHOD OF CONSTRUCTING ONE-COLUMN ONE-PILE FOUNDATION STRUCTURE</title><description>PROBLEM TO BE SOLVED: To provide a method of constructing a one-column one-pile foundation structure in which a core of a pile and a core of a column base can be correctly aligned with each other, and a pile driving error can be absorbed. SOLUTION: In the method of constructing the one-column one-pile structure 10 in which the single column base 13 is supported by the single pile 11, the pile 11, the column base 13, and a connection member 12 connecting the pile 11 and the column base 13 are carried in the construction field individually from one another. Then the pile 11 is embedded in the ground G at a predetermined location, and the connection member 12 is mounted to the pile head of the pile 11, the core of the pile 11 is aligned with a core of the connection member 12, to thereby connect the pile 11 and the connection member 12. Thereafter the tip of the column base 13 is inserted into an internal space of the connection member 12 via the opening end of the connection member 12, and after adjusting vertical and horizontal positions of the column base 13, the connection member 12 and the column base 13 are connected to each other. COPYRIGHT: (C)2007,JPO&amp;INPIT</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FOUNDATIONS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLD3dQ3x8HdR8HdTcPb3Cw4JCnUO8fRzV_D3c9V19vcJ9fUDMwM8fVwV3PxD_VwcQzz9_RQgCkODXHkYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbxXgJGBgbmBmbGFqYmjMVGKAPxXKzc</recordid><startdate>20070315</startdate><enddate>20070315</enddate><creator>MIYAKE HIROHISA</creator><creator>KATO MOTOKI</creator><creator>NISHI YUTAKA</creator><creator>OKAMOTO YASUO</creator><creator>MORISHITA KUNIHIRO</creator><scope>EVB</scope></search><sort><creationdate>20070315</creationdate><title>METHOD OF CONSTRUCTING ONE-COLUMN ONE-PILE FOUNDATION STRUCTURE</title><author>MIYAKE HIROHISA ; KATO MOTOKI ; NISHI YUTAKA ; OKAMOTO YASUO ; MORISHITA KUNIHIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2007063854A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FOUNDATIONS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>MIYAKE HIROHISA</creatorcontrib><creatorcontrib>KATO MOTOKI</creatorcontrib><creatorcontrib>NISHI YUTAKA</creatorcontrib><creatorcontrib>OKAMOTO YASUO</creatorcontrib><creatorcontrib>MORISHITA KUNIHIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MIYAKE HIROHISA</au><au>KATO MOTOKI</au><au>NISHI YUTAKA</au><au>OKAMOTO YASUO</au><au>MORISHITA KUNIHIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF CONSTRUCTING ONE-COLUMN ONE-PILE FOUNDATION STRUCTURE</title><date>2007-03-15</date><risdate>2007</risdate><abstract>PROBLEM TO BE SOLVED: To provide a method of constructing a one-column one-pile foundation structure in which a core of a pile and a core of a column base can be correctly aligned with each other, and a pile driving error can be absorbed. SOLUTION: In the method of constructing the one-column one-pile structure 10 in which the single column base 13 is supported by the single pile 11, the pile 11, the column base 13, and a connection member 12 connecting the pile 11 and the column base 13 are carried in the construction field individually from one another. Then the pile 11 is embedded in the ground G at a predetermined location, and the connection member 12 is mounted to the pile head of the pile 11, the core of the pile 11 is aligned with a core of the connection member 12, to thereby connect the pile 11 and the connection member 12. Thereafter the tip of the column base 13 is inserted into an internal space of the connection member 12 via the opening end of the connection member 12, and after adjusting vertical and horizontal positions of the column base 13, the connection member 12 and the column base 13 are connected to each other. COPYRIGHT: (C)2007,JPO&amp;INPIT</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2007063854A
source esp@cenet
subjects BUILDING
CEILINGS
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FLOORS
FOUNDATIONS
GENERAL BUILDING CONSTRUCTIONS
HYDRAULIC ENGINEERING
INSULATION OR OTHER PROTECTION OF BUILDINGS
ROOFS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
WALLS, e.g. PARTITIONS
title METHOD OF CONSTRUCTING ONE-COLUMN ONE-PILE FOUNDATION STRUCTURE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T05%3A27%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MIYAKE%20HIROHISA&rft.date=2007-03-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2007063854A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true