SYNTHETIC PANEL STRUCTURE, PANEL BRIDGE STRUCTURE, AND CONSTRUCTION METHOD FOR CONTINUOUS SYNTHETIC BEAM BRIDGE

PROBLEM TO BE SOLVED: To provide a synthetic panel structure having a predetermined rigidity and formed of steel and concrete at low manufacturing cost and shorten construction period at site and simplify construction by using the synthetic panel. SOLUTION: In this synthetic panel structure, the upp...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SAKURAI NOBUAKI, MIZUKAMI SHIGEKI, FUJIKAWA TAKAHITO, SEKIGUCHI NOBUO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SAKURAI NOBUAKI
MIZUKAMI SHIGEKI
FUJIKAWA TAKAHITO
SEKIGUCHI NOBUO
description PROBLEM TO BE SOLVED: To provide a synthetic panel structure having a predetermined rigidity and formed of steel and concrete at low manufacturing cost and shorten construction period at site and simplify construction by using the synthetic panel. SOLUTION: In this synthetic panel structure, the upper surfaces 13 of a plurality of vertical beams 3 disposed at intervals are secured onto the lower surface of a bottom steel plate 2, a plurality of lateral ribs 4 are fixedly disposed on the upper surface of the bottom steel plate 2 at intervals in a direction crossing perpendicularly to the vertical beams 3, and a floor slab concrete 5 is filled therein to bury the lateral ribs 4 therein, and the panel bridge using the panel 1 is also provided. In this continuous beam, the synthetic panel 1 is supported on the lateral beams by shearing members and added plates installed at the upper end of the vertical beams 3 forming a main beam projectedly in the axial direction and the side part of the lateral beams and the end part of the synthetic panel 1 are joined integrally with each other by a concrete filled at the side parts of bearing plates 10 fitted to the lower end parts of the vertical beams and the lateral beams and around a joining means installed at the end part of the synthetic panel 1, and the construction method for continuous beam is also provided. COPYRIGHT: (C)2007,JPO&INPIT
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2007016594A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2007016594A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2007016594A3</originalsourceid><addsrcrecordid>eNrjZMgPjvQL8XAN8XRWCHD0c_VRCA4JCnUOCQ1y1YEKOAV5uri7Ios7-rkoOPv7QUQ8_f0UfF1DPPxdFNz8g0DiIZ5-of6hwQoIk51cHX2h5vAwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknivACMDA3MDQzNTSxNHY6IUAQBSYzhq</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SYNTHETIC PANEL STRUCTURE, PANEL BRIDGE STRUCTURE, AND CONSTRUCTION METHOD FOR CONTINUOUS SYNTHETIC BEAM BRIDGE</title><source>esp@cenet</source><creator>SAKURAI NOBUAKI ; MIZUKAMI SHIGEKI ; FUJIKAWA TAKAHITO ; SEKIGUCHI NOBUO</creator><creatorcontrib>SAKURAI NOBUAKI ; MIZUKAMI SHIGEKI ; FUJIKAWA TAKAHITO ; SEKIGUCHI NOBUO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a synthetic panel structure having a predetermined rigidity and formed of steel and concrete at low manufacturing cost and shorten construction period at site and simplify construction by using the synthetic panel. SOLUTION: In this synthetic panel structure, the upper surfaces 13 of a plurality of vertical beams 3 disposed at intervals are secured onto the lower surface of a bottom steel plate 2, a plurality of lateral ribs 4 are fixedly disposed on the upper surface of the bottom steel plate 2 at intervals in a direction crossing perpendicularly to the vertical beams 3, and a floor slab concrete 5 is filled therein to bury the lateral ribs 4 therein, and the panel bridge using the panel 1 is also provided. In this continuous beam, the synthetic panel 1 is supported on the lateral beams by shearing members and added plates installed at the upper end of the vertical beams 3 forming a main beam projectedly in the axial direction and the side part of the lateral beams and the end part of the synthetic panel 1 are joined integrally with each other by a concrete filled at the side parts of bearing plates 10 fitted to the lower end parts of the vertical beams and the lateral beams and around a joining means installed at the end part of the synthetic panel 1, and the construction method for continuous beam is also provided. COPYRIGHT: (C)2007,JPO&amp;INPIT</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070125&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007016594A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070125&amp;DB=EPODOC&amp;CC=JP&amp;NR=2007016594A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SAKURAI NOBUAKI</creatorcontrib><creatorcontrib>MIZUKAMI SHIGEKI</creatorcontrib><creatorcontrib>FUJIKAWA TAKAHITO</creatorcontrib><creatorcontrib>SEKIGUCHI NOBUO</creatorcontrib><title>SYNTHETIC PANEL STRUCTURE, PANEL BRIDGE STRUCTURE, AND CONSTRUCTION METHOD FOR CONTINUOUS SYNTHETIC BEAM BRIDGE</title><description>PROBLEM TO BE SOLVED: To provide a synthetic panel structure having a predetermined rigidity and formed of steel and concrete at low manufacturing cost and shorten construction period at site and simplify construction by using the synthetic panel. SOLUTION: In this synthetic panel structure, the upper surfaces 13 of a plurality of vertical beams 3 disposed at intervals are secured onto the lower surface of a bottom steel plate 2, a plurality of lateral ribs 4 are fixedly disposed on the upper surface of the bottom steel plate 2 at intervals in a direction crossing perpendicularly to the vertical beams 3, and a floor slab concrete 5 is filled therein to bury the lateral ribs 4 therein, and the panel bridge using the panel 1 is also provided. In this continuous beam, the synthetic panel 1 is supported on the lateral beams by shearing members and added plates installed at the upper end of the vertical beams 3 forming a main beam projectedly in the axial direction and the side part of the lateral beams and the end part of the synthetic panel 1 are joined integrally with each other by a concrete filled at the side parts of bearing plates 10 fitted to the lower end parts of the vertical beams and the lateral beams and around a joining means installed at the end part of the synthetic panel 1, and the construction method for continuous beam is also provided. COPYRIGHT: (C)2007,JPO&amp;INPIT</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZMgPjvQL8XAN8XRWCHD0c_VRCA4JCnUOCQ1y1YEKOAV5uri7Ios7-rkoOPv7QUQ8_f0UfF1DPPxdFNz8g0DiIZ5-of6hwQoIk51cHX2h5vAwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknivACMDA3MDQzNTSxNHY6IUAQBSYzhq</recordid><startdate>20070125</startdate><enddate>20070125</enddate><creator>SAKURAI NOBUAKI</creator><creator>MIZUKAMI SHIGEKI</creator><creator>FUJIKAWA TAKAHITO</creator><creator>SEKIGUCHI NOBUO</creator><scope>EVB</scope></search><sort><creationdate>20070125</creationdate><title>SYNTHETIC PANEL STRUCTURE, PANEL BRIDGE STRUCTURE, AND CONSTRUCTION METHOD FOR CONTINUOUS SYNTHETIC BEAM BRIDGE</title><author>SAKURAI NOBUAKI ; MIZUKAMI SHIGEKI ; FUJIKAWA TAKAHITO ; SEKIGUCHI NOBUO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2007016594A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>SAKURAI NOBUAKI</creatorcontrib><creatorcontrib>MIZUKAMI SHIGEKI</creatorcontrib><creatorcontrib>FUJIKAWA TAKAHITO</creatorcontrib><creatorcontrib>SEKIGUCHI NOBUO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SAKURAI NOBUAKI</au><au>MIZUKAMI SHIGEKI</au><au>FUJIKAWA TAKAHITO</au><au>SEKIGUCHI NOBUO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SYNTHETIC PANEL STRUCTURE, PANEL BRIDGE STRUCTURE, AND CONSTRUCTION METHOD FOR CONTINUOUS SYNTHETIC BEAM BRIDGE</title><date>2007-01-25</date><risdate>2007</risdate><abstract>PROBLEM TO BE SOLVED: To provide a synthetic panel structure having a predetermined rigidity and formed of steel and concrete at low manufacturing cost and shorten construction period at site and simplify construction by using the synthetic panel. SOLUTION: In this synthetic panel structure, the upper surfaces 13 of a plurality of vertical beams 3 disposed at intervals are secured onto the lower surface of a bottom steel plate 2, a plurality of lateral ribs 4 are fixedly disposed on the upper surface of the bottom steel plate 2 at intervals in a direction crossing perpendicularly to the vertical beams 3, and a floor slab concrete 5 is filled therein to bury the lateral ribs 4 therein, and the panel bridge using the panel 1 is also provided. In this continuous beam, the synthetic panel 1 is supported on the lateral beams by shearing members and added plates installed at the upper end of the vertical beams 3 forming a main beam projectedly in the axial direction and the side part of the lateral beams and the end part of the synthetic panel 1 are joined integrally with each other by a concrete filled at the side parts of bearing plates 10 fitted to the lower end parts of the vertical beams and the lateral beams and around a joining means installed at the end part of the synthetic panel 1, and the construction method for continuous beam is also provided. COPYRIGHT: (C)2007,JPO&amp;INPIT</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2007016594A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title SYNTHETIC PANEL STRUCTURE, PANEL BRIDGE STRUCTURE, AND CONSTRUCTION METHOD FOR CONTINUOUS SYNTHETIC BEAM BRIDGE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-20T16%3A09%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SAKURAI%20NOBUAKI&rft.date=2007-01-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2007016594A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true