PIPE BURYING CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To effectively prevent damage of a pipe part in an assumed region accompanying with displacement of the ground even when a pipe is buried over the assumed region where it is assumed that there is possibility of action of shearing force in the radial direction of the pipe in acc...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!