CONSTRUCTION MATERIAL, METHOD OF MANUFACTURING CONSTRUCTION MATERIAL, CONSTRUCTION METHOD, RAILROAD BALLAST, CONSTRUCTION METHOD OF RAILROAD BALLAST, SOIL BASE COURSE FOR LABOR-SAVING TRACK, CONSTRUCTION METHOD OF SOIL BASE COURSE FOR LABOR-SAVING TRACK, GROUND OF STRUCTURE, AND CONSTRUCTION METHOD OF GROUND OF STRUCTURE
PROBLEM TO BE SOLVED: To provide railroad ballast, the ground of a structure, and construction methods thereof for effectively preventing the occurrence of frost heave on the railroad ballast and the grounds of various structures, effectively utilizing industrial waste and low in construction cost....
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide railroad ballast, the ground of a structure, and construction methods thereof for effectively preventing the occurrence of frost heave on the railroad ballast and the grounds of various structures, effectively utilizing industrial waste and low in construction cost. SOLUTION: In this construction method, a construction material obtained by mixing clinker ash and a frost heaving material so that the weight ratio of the clinker ash to the total weight of the clinker ash and frost heaving material is ≥50% and |
---|