CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME

PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: YAMANE MIKIO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YAMANE MIKIO
description PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried pipe, when the meeting place, which is excavated as a working area for piping connection work etc., is backfilled, a meeting-place maintaining box is arranged for backfill in a meeting-place space. In the resumption of work, the meeting-place maintaining box is used as the working space. The meeting-place maintaining box for use in the construction is a structure which is to be installed in the meeting place excavated as the working area for the piping connection work etc., so as to maintain the working space of the meeting place and protect it with an end of a pipe body midway through the installation of the piping. COPYRIGHT: (C)2005,JPO&NCIPI
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2004332497A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2004332497A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2004332497A3</originalsourceid><addsrcrecordid>eNqNi70KwjAURrs4iPoOF2cLpSlIxzS5bSPmh-QW3EqRdBIt1PfHgD6Aw8eBw_m22SysCeQHQcoa0Ei9ldBaD4OR6DtvE6EZvEIJTjk8AU9CI5IyXe6uXCBorgylJQONvX3vAUEZoB4hcI37bDNPjzUeftxlxxZJ9HlcXmNcl-ken_E9XlxZFBVjZVWfOfsr-gAO8TUy</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME</title><source>esp@cenet</source><creator>YAMANE MIKIO</creator><creatorcontrib>YAMANE MIKIO</creatorcontrib><description>PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried pipe, when the meeting place, which is excavated as a working area for piping connection work etc., is backfilled, a meeting-place maintaining box is arranged for backfill in a meeting-place space. In the resumption of work, the meeting-place maintaining box is used as the working space. The meeting-place maintaining box for use in the construction is a structure which is to be installed in the meeting place excavated as the working area for the piping connection work etc., so as to maintain the working space of the meeting place and protect it with an end of a pipe body midway through the installation of the piping. COPYRIGHT: (C)2005,JPO&amp;NCIPI</description><edition>7</edition><language>eng</language><subject>BLASTING ; CESSPOOLS ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; DREDGING ; ENGINEERING ELEMENTS AND UNITS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; HYDRAULIC ENGINEERING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; PIPES ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; WATER SUPPLY ; WEAPONS</subject><creationdate>2004</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20041125&amp;DB=EPODOC&amp;CC=JP&amp;NR=2004332497A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25551,76302</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20041125&amp;DB=EPODOC&amp;CC=JP&amp;NR=2004332497A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YAMANE MIKIO</creatorcontrib><title>CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME</title><description>PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried pipe, when the meeting place, which is excavated as a working area for piping connection work etc., is backfilled, a meeting-place maintaining box is arranged for backfill in a meeting-place space. In the resumption of work, the meeting-place maintaining box is used as the working space. The meeting-place maintaining box for use in the construction is a structure which is to be installed in the meeting place excavated as the working area for the piping connection work etc., so as to maintain the working space of the meeting place and protect it with an end of a pipe body midway through the installation of the piping. COPYRIGHT: (C)2005,JPO&amp;NCIPI</description><subject>BLASTING</subject><subject>CESSPOOLS</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>DREDGING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>HYDRAULIC ENGINEERING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>PIPES</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WATER SUPPLY</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2004</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi70KwjAURrs4iPoOF2cLpSlIxzS5bSPmh-QW3EqRdBIt1PfHgD6Aw8eBw_m22SysCeQHQcoa0Ei9ldBaD4OR6DtvE6EZvEIJTjk8AU9CI5IyXe6uXCBorgylJQONvX3vAUEZoB4hcI37bDNPjzUeftxlxxZJ9HlcXmNcl-ken_E9XlxZFBVjZVWfOfsr-gAO8TUy</recordid><startdate>20041125</startdate><enddate>20041125</enddate><creator>YAMANE MIKIO</creator><scope>EVB</scope></search><sort><creationdate>20041125</creationdate><title>CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME</title><author>YAMANE MIKIO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2004332497A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2004</creationdate><topic>BLASTING</topic><topic>CESSPOOLS</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>DREDGING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>HYDRAULIC ENGINEERING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>PIPES</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WATER SUPPLY</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>YAMANE MIKIO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YAMANE MIKIO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME</title><date>2004-11-25</date><risdate>2004</risdate><abstract>PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried pipe, when the meeting place, which is excavated as a working area for piping connection work etc., is backfilled, a meeting-place maintaining box is arranged for backfill in a meeting-place space. In the resumption of work, the meeting-place maintaining box is used as the working space. The meeting-place maintaining box for use in the construction is a structure which is to be installed in the meeting place excavated as the working area for the piping connection work etc., so as to maintain the working space of the meeting place and protect it with an end of a pipe body midway through the installation of the piping. COPYRIGHT: (C)2005,JPO&amp;NCIPI</abstract><edition>7</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2004332497A
source esp@cenet
subjects BLASTING
CESSPOOLS
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
DREDGING
ENGINEERING ELEMENTS AND UNITS
FIXED CONSTRUCTIONS
FOUNDATIONS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HEATING
HYDRAULIC ENGINEERING
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
MEANS FOR THERMAL INSULATION IN GENERAL
MECHANICAL ENGINEERING
PIPES
SEWERAGE
SEWERS
SOIL SHIFTING
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
THERMAL INSULATION IN GENERAL
WATER SUPPLY
WEAPONS
title CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T16%3A35%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YAMANE%20MIKIO&rft.date=2004-11-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2004332497A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true