CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME
PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YAMANE MIKIO |
description | PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried pipe, when the meeting place, which is excavated as a working area for piping connection work etc., is backfilled, a meeting-place maintaining box is arranged for backfill in a meeting-place space. In the resumption of work, the meeting-place maintaining box is used as the working space. The meeting-place maintaining box for use in the construction is a structure which is to be installed in the meeting place excavated as the working area for the piping connection work etc., so as to maintain the working space of the meeting place and protect it with an end of a pipe body midway through the installation of the piping. COPYRIGHT: (C)2005,JPO&NCIPI |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2004332497A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2004332497A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2004332497A3</originalsourceid><addsrcrecordid>eNqNi70KwjAURrs4iPoOF2cLpSlIxzS5bSPmh-QW3EqRdBIt1PfHgD6Aw8eBw_m22SysCeQHQcoa0Ei9ldBaD4OR6DtvE6EZvEIJTjk8AU9CI5IyXe6uXCBorgylJQONvX3vAUEZoB4hcI37bDNPjzUeftxlxxZJ9HlcXmNcl-ken_E9XlxZFBVjZVWfOfsr-gAO8TUy</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME</title><source>esp@cenet</source><creator>YAMANE MIKIO</creator><creatorcontrib>YAMANE MIKIO</creatorcontrib><description>PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried pipe, when the meeting place, which is excavated as a working area for piping connection work etc., is backfilled, a meeting-place maintaining box is arranged for backfill in a meeting-place space. In the resumption of work, the meeting-place maintaining box is used as the working space. The meeting-place maintaining box for use in the construction is a structure which is to be installed in the meeting place excavated as the working area for the piping connection work etc., so as to maintain the working space of the meeting place and protect it with an end of a pipe body midway through the installation of the piping. COPYRIGHT: (C)2005,JPO&NCIPI</description><edition>7</edition><language>eng</language><subject>BLASTING ; CESSPOOLS ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; DREDGING ; ENGINEERING ELEMENTS AND UNITS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; HYDRAULIC ENGINEERING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; PIPES ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; WATER SUPPLY ; WEAPONS</subject><creationdate>2004</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20041125&DB=EPODOC&CC=JP&NR=2004332497A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25551,76302</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20041125&DB=EPODOC&CC=JP&NR=2004332497A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YAMANE MIKIO</creatorcontrib><title>CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME</title><description>PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried pipe, when the meeting place, which is excavated as a working area for piping connection work etc., is backfilled, a meeting-place maintaining box is arranged for backfill in a meeting-place space. In the resumption of work, the meeting-place maintaining box is used as the working space. The meeting-place maintaining box for use in the construction is a structure which is to be installed in the meeting place excavated as the working area for the piping connection work etc., so as to maintain the working space of the meeting place and protect it with an end of a pipe body midway through the installation of the piping. COPYRIGHT: (C)2005,JPO&NCIPI</description><subject>BLASTING</subject><subject>CESSPOOLS</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>DREDGING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>HYDRAULIC ENGINEERING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>PIPES</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WATER SUPPLY</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2004</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi70KwjAURrs4iPoOF2cLpSlIxzS5bSPmh-QW3EqRdBIt1PfHgD6Aw8eBw_m22SysCeQHQcoa0Ei9ldBaD4OR6DtvE6EZvEIJTjk8AU9CI5IyXe6uXCBorgylJQONvX3vAUEZoB4hcI37bDNPjzUeftxlxxZJ9HlcXmNcl-ken_E9XlxZFBVjZVWfOfsr-gAO8TUy</recordid><startdate>20041125</startdate><enddate>20041125</enddate><creator>YAMANE MIKIO</creator><scope>EVB</scope></search><sort><creationdate>20041125</creationdate><title>CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME</title><author>YAMANE MIKIO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2004332497A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2004</creationdate><topic>BLASTING</topic><topic>CESSPOOLS</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>DREDGING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>HYDRAULIC ENGINEERING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>PIPES</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WATER SUPPLY</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>YAMANE MIKIO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YAMANE MIKIO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME</title><date>2004-11-25</date><risdate>2004</risdate><abstract>PROBLEM TO BE SOLVED: To bring about the efficient progress of construction work by eliminating excessive labor for construction of a meeting place, backfill, re-excavation, etc., in a construction method for an underground buried pipe. SOLUTION: In the construction method for the underground buried pipe, when the meeting place, which is excavated as a working area for piping connection work etc., is backfilled, a meeting-place maintaining box is arranged for backfill in a meeting-place space. In the resumption of work, the meeting-place maintaining box is used as the working space. The meeting-place maintaining box for use in the construction is a structure which is to be installed in the meeting place excavated as the working area for the piping connection work etc., so as to maintain the working space of the meeting place and protect it with an end of a pipe body midway through the installation of the piping. COPYRIGHT: (C)2005,JPO&NCIPI</abstract><edition>7</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2004332497A |
source | esp@cenet |
subjects | BLASTING CESSPOOLS CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE DREDGING ENGINEERING ELEMENTS AND UNITS FIXED CONSTRUCTIONS FOUNDATIONS GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS HEATING HYDRAULIC ENGINEERING JOINTS OR FITTINGS FOR PIPES LIGHTING MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR MEANS FOR THERMAL INSULATION IN GENERAL MECHANICAL ENGINEERING PIPES SEWERAGE SEWERS SOIL SHIFTING SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING THERMAL INSULATION IN GENERAL WATER SUPPLY WEAPONS |
title | CONSTRUCTION METHOD FOR UNDERGROUND BURIED PIPE, AND MEETING-PLACE MAINTAINING BOX FOR USE IN THE SAME |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T16%3A35%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YAMANE%20MIKIO&rft.date=2004-11-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2004332497A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |