STEEL SHEET PILE CONTINUOUS DRIVING METHOD TO HARD ROCK STRATUM

PROBLEM TO BE SOLVED: To provide a steel sheet pile continuous driving method to a hard rock stratum capable of continuously forming boring with even a small diameter borable in the hard rock stratum by one civil engineering foundation machine in a lap mode even if drilling power is small and contin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HOSHI YOSHIYUKI, HOSHI TADAO, HOSHI HIROYUKI, HOSHI RIKIO, HOSHI FUMIO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HOSHI YOSHIYUKI
HOSHI TADAO
HOSHI HIROYUKI
HOSHI RIKIO
HOSHI FUMIO
description PROBLEM TO BE SOLVED: To provide a steel sheet pile continuous driving method to a hard rock stratum capable of continuously forming boring with even a small diameter borable in the hard rock stratum by one civil engineering foundation machine in a lap mode even if drilling power is small and continuously driving a sheet pile in a lap boring by vibro of the wide sheet pile having the width larger than the diameter of the boring. SOLUTION: An independent boring C1 is formed by a common danza hole hammer to make vibro-driving of the steel sheet pile P into the hard rock stratum, a first lap boring C2 is formed by leading a section guide 5 with a steel sheet pile section PE by the danza hole hammer 3 equipped with a section guide 5, and a second lap boring WC2 is formed by leading the section guide W5 with the steel sheet pile section PE by the danza hole hammer W3 equipped with a projected arm section guide W5. Then, the wide steel sheet pile WP is driven by vibration over the first lap boring C2 and the second lap boring WC2, and a pair of boring works of the first lap boring C2 and the second lap boring WC2 having small diameters and the wide steel sheet pile are repeatedly driven to continuously drive the wide steel sheet pile. COPYRIGHT: (C)2004,JPO&NCIPI
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2004239063A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2004239063A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2004239063A3</originalsourceid><addsrcrecordid>eNrjZLAPDnF19VEI9nB1DVEI8PRxVXD29wvx9Av1Dw1WcAnyDPP0c1fwdQ3x8HdRCPFX8HAMclEI8nf2VggOCXIMCfXlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgYmRsaWBmbGjsZEKQIA3agq4A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>STEEL SHEET PILE CONTINUOUS DRIVING METHOD TO HARD ROCK STRATUM</title><source>esp@cenet</source><creator>HOSHI YOSHIYUKI ; HOSHI TADAO ; HOSHI HIROYUKI ; HOSHI RIKIO ; HOSHI FUMIO</creator><creatorcontrib>HOSHI YOSHIYUKI ; HOSHI TADAO ; HOSHI HIROYUKI ; HOSHI RIKIO ; HOSHI FUMIO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a steel sheet pile continuous driving method to a hard rock stratum capable of continuously forming boring with even a small diameter borable in the hard rock stratum by one civil engineering foundation machine in a lap mode even if drilling power is small and continuously driving a sheet pile in a lap boring by vibro of the wide sheet pile having the width larger than the diameter of the boring. SOLUTION: An independent boring C1 is formed by a common danza hole hammer to make vibro-driving of the steel sheet pile P into the hard rock stratum, a first lap boring C2 is formed by leading a section guide 5 with a steel sheet pile section PE by the danza hole hammer 3 equipped with a section guide 5, and a second lap boring WC2 is formed by leading the section guide W5 with the steel sheet pile section PE by the danza hole hammer W3 equipped with a projected arm section guide W5. Then, the wide steel sheet pile WP is driven by vibration over the first lap boring C2 and the second lap boring WC2, and a pair of boring works of the first lap boring C2 and the second lap boring WC2 having small diameters and the wide steel sheet pile are repeatedly driven to continuously drive the wide steel sheet pile. COPYRIGHT: (C)2004,JPO&amp;NCIPI</description><edition>7</edition><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2004</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20040826&amp;DB=EPODOC&amp;CC=JP&amp;NR=2004239063A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20040826&amp;DB=EPODOC&amp;CC=JP&amp;NR=2004239063A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HOSHI YOSHIYUKI</creatorcontrib><creatorcontrib>HOSHI TADAO</creatorcontrib><creatorcontrib>HOSHI HIROYUKI</creatorcontrib><creatorcontrib>HOSHI RIKIO</creatorcontrib><creatorcontrib>HOSHI FUMIO</creatorcontrib><title>STEEL SHEET PILE CONTINUOUS DRIVING METHOD TO HARD ROCK STRATUM</title><description>PROBLEM TO BE SOLVED: To provide a steel sheet pile continuous driving method to a hard rock stratum capable of continuously forming boring with even a small diameter borable in the hard rock stratum by one civil engineering foundation machine in a lap mode even if drilling power is small and continuously driving a sheet pile in a lap boring by vibro of the wide sheet pile having the width larger than the diameter of the boring. SOLUTION: An independent boring C1 is formed by a common danza hole hammer to make vibro-driving of the steel sheet pile P into the hard rock stratum, a first lap boring C2 is formed by leading a section guide 5 with a steel sheet pile section PE by the danza hole hammer 3 equipped with a section guide 5, and a second lap boring WC2 is formed by leading the section guide W5 with the steel sheet pile section PE by the danza hole hammer W3 equipped with a projected arm section guide W5. Then, the wide steel sheet pile WP is driven by vibration over the first lap boring C2 and the second lap boring WC2, and a pair of boring works of the first lap boring C2 and the second lap boring WC2 having small diameters and the wide steel sheet pile are repeatedly driven to continuously drive the wide steel sheet pile. COPYRIGHT: (C)2004,JPO&amp;NCIPI</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2004</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAPDnF19VEI9nB1DVEI8PRxVXD29wvx9Av1Dw1WcAnyDPP0c1fwdQ3x8HdRCPFX8HAMclEI8nf2VggOCXIMCfXlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgYmRsaWBmbGjsZEKQIA3agq4A</recordid><startdate>20040826</startdate><enddate>20040826</enddate><creator>HOSHI YOSHIYUKI</creator><creator>HOSHI TADAO</creator><creator>HOSHI HIROYUKI</creator><creator>HOSHI RIKIO</creator><creator>HOSHI FUMIO</creator><scope>EVB</scope></search><sort><creationdate>20040826</creationdate><title>STEEL SHEET PILE CONTINUOUS DRIVING METHOD TO HARD ROCK STRATUM</title><author>HOSHI YOSHIYUKI ; HOSHI TADAO ; HOSHI HIROYUKI ; HOSHI RIKIO ; HOSHI FUMIO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2004239063A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2004</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>HOSHI YOSHIYUKI</creatorcontrib><creatorcontrib>HOSHI TADAO</creatorcontrib><creatorcontrib>HOSHI HIROYUKI</creatorcontrib><creatorcontrib>HOSHI RIKIO</creatorcontrib><creatorcontrib>HOSHI FUMIO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HOSHI YOSHIYUKI</au><au>HOSHI TADAO</au><au>HOSHI HIROYUKI</au><au>HOSHI RIKIO</au><au>HOSHI FUMIO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>STEEL SHEET PILE CONTINUOUS DRIVING METHOD TO HARD ROCK STRATUM</title><date>2004-08-26</date><risdate>2004</risdate><abstract>PROBLEM TO BE SOLVED: To provide a steel sheet pile continuous driving method to a hard rock stratum capable of continuously forming boring with even a small diameter borable in the hard rock stratum by one civil engineering foundation machine in a lap mode even if drilling power is small and continuously driving a sheet pile in a lap boring by vibro of the wide sheet pile having the width larger than the diameter of the boring. SOLUTION: An independent boring C1 is formed by a common danza hole hammer to make vibro-driving of the steel sheet pile P into the hard rock stratum, a first lap boring C2 is formed by leading a section guide 5 with a steel sheet pile section PE by the danza hole hammer 3 equipped with a section guide 5, and a second lap boring WC2 is formed by leading the section guide W5 with the steel sheet pile section PE by the danza hole hammer W3 equipped with a projected arm section guide W5. Then, the wide steel sheet pile WP is driven by vibration over the first lap boring C2 and the second lap boring WC2, and a pair of boring works of the first lap boring C2 and the second lap boring WC2 having small diameters and the wide steel sheet pile are repeatedly driven to continuously drive the wide steel sheet pile. COPYRIGHT: (C)2004,JPO&amp;NCIPI</abstract><edition>7</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2004239063A
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title STEEL SHEET PILE CONTINUOUS DRIVING METHOD TO HARD ROCK STRATUM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T13%3A16%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HOSHI%20YOSHIYUKI&rft.date=2004-08-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2004239063A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true