METHOD FOR BURYING UNDERGROUND PIPE BODY

PROBLEM TO BE SOLVED: To provide an underground burying method for easily and rapidly performing the underground pipe burying work without any changes or machining of an uneven pipe while taking an advantage of the uneven pipe of a special shape. SOLUTION: When a plurality of rows of parallel pipe b...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: FUKUI KOKI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator FUKUI KOKI
description PROBLEM TO BE SOLVED: To provide an underground burying method for easily and rapidly performing the underground pipe burying work without any changes or machining of an uneven pipe while taking an advantage of the uneven pipe of a special shape. SOLUTION: When a plurality of rows of parallel pipe bodies P with a pipe wall 1 formed uneven in the axial direction, the sectional shape of a projecting part 2 formed rectangular, and the sectional shape of a recessed part 3 formed circular are arranged in a groove G excavated in the ground, a spacer S is arranged between the pipe rows of the pipe bodies P and P at an interval of adequate length in the pipe longitudinal direction, and the pipe bodies are arranged while keeping a predetermined space D. Then, the excavated groove G is totally refilled and earth-covered including the space D. In another method, when pipe bodies P of a plurality of parallel rows/stacks are arranged in the groove G, the spacer S is arranged between the rows of the pipe bodies P and P at an interval of adequate length in the pipe longitudinal direction, the predetermined space D is kept, and the entire excavated groove G is re-filled and covered including the space D. COPYRIGHT: (C)2004,JPO
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2004084766A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2004084766A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2004084766A3</originalsourceid><addsrcrecordid>eNrjZNDwdQ3x8HdRcPMPUnAKDYr09HNXCPVzcQ1yD_IH0goBngGuCk7-LpE8DKxpiTnFqbxQmptByc01xNlDN7UgPz61uCAxOTUvtSTeK8DIwMDEwMLE3MzM0ZgoRQBV9SSe</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR BURYING UNDERGROUND PIPE BODY</title><source>esp@cenet</source><creator>FUKUI KOKI</creator><creatorcontrib>FUKUI KOKI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide an underground burying method for easily and rapidly performing the underground pipe burying work without any changes or machining of an uneven pipe while taking an advantage of the uneven pipe of a special shape. SOLUTION: When a plurality of rows of parallel pipe bodies P with a pipe wall 1 formed uneven in the axial direction, the sectional shape of a projecting part 2 formed rectangular, and the sectional shape of a recessed part 3 formed circular are arranged in a groove G excavated in the ground, a spacer S is arranged between the pipe rows of the pipe bodies P and P at an interval of adequate length in the pipe longitudinal direction, and the pipe bodies are arranged while keeping a predetermined space D. Then, the excavated groove G is totally refilled and earth-covered including the space D. In another method, when pipe bodies P of a plurality of parallel rows/stacks are arranged in the groove G, the spacer S is arranged between the rows of the pipe bodies P and P at an interval of adequate length in the pipe longitudinal direction, the predetermined space D is kept, and the entire excavated groove G is re-filled and covered including the space D. COPYRIGHT: (C)2004,JPO</description><edition>7</edition><language>eng</language><subject>BLASTING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; ENGINEERING ELEMENTS AND UNITS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; GENERATION ; HEATING ; INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; PIPES ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; WEAPONS</subject><creationdate>2004</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20040318&amp;DB=EPODOC&amp;CC=JP&amp;NR=2004084766A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20040318&amp;DB=EPODOC&amp;CC=JP&amp;NR=2004084766A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FUKUI KOKI</creatorcontrib><title>METHOD FOR BURYING UNDERGROUND PIPE BODY</title><description>PROBLEM TO BE SOLVED: To provide an underground burying method for easily and rapidly performing the underground pipe burying work without any changes or machining of an uneven pipe while taking an advantage of the uneven pipe of a special shape. SOLUTION: When a plurality of rows of parallel pipe bodies P with a pipe wall 1 formed uneven in the axial direction, the sectional shape of a projecting part 2 formed rectangular, and the sectional shape of a recessed part 3 formed circular are arranged in a groove G excavated in the ground, a spacer S is arranged between the pipe rows of the pipe bodies P and P at an interval of adequate length in the pipe longitudinal direction, and the pipe bodies are arranged while keeping a predetermined space D. Then, the excavated groove G is totally refilled and earth-covered including the space D. In another method, when pipe bodies P of a plurality of parallel rows/stacks are arranged in the groove G, the spacer S is arranged between the rows of the pipe bodies P and P at an interval of adequate length in the pipe longitudinal direction, the predetermined space D is kept, and the entire excavated groove G is re-filled and covered including the space D. COPYRIGHT: (C)2004,JPO</description><subject>BLASTING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>GENERATION</subject><subject>HEATING</subject><subject>INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>PIPES</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2004</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNDwdQ3x8HdRcPMPUnAKDYr09HNXCPVzcQ1yD_IH0goBngGuCk7-LpE8DKxpiTnFqbxQmptByc01xNlDN7UgPz61uCAxOTUvtSTeK8DIwMDEwMLE3MzM0ZgoRQBV9SSe</recordid><startdate>20040318</startdate><enddate>20040318</enddate><creator>FUKUI KOKI</creator><scope>EVB</scope></search><sort><creationdate>20040318</creationdate><title>METHOD FOR BURYING UNDERGROUND PIPE BODY</title><author>FUKUI KOKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2004084766A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2004</creationdate><topic>BLASTING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>GENERATION</topic><topic>HEATING</topic><topic>INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>PIPES</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>FUKUI KOKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FUKUI KOKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR BURYING UNDERGROUND PIPE BODY</title><date>2004-03-18</date><risdate>2004</risdate><abstract>PROBLEM TO BE SOLVED: To provide an underground burying method for easily and rapidly performing the underground pipe burying work without any changes or machining of an uneven pipe while taking an advantage of the uneven pipe of a special shape. SOLUTION: When a plurality of rows of parallel pipe bodies P with a pipe wall 1 formed uneven in the axial direction, the sectional shape of a projecting part 2 formed rectangular, and the sectional shape of a recessed part 3 formed circular are arranged in a groove G excavated in the ground, a spacer S is arranged between the pipe rows of the pipe bodies P and P at an interval of adequate length in the pipe longitudinal direction, and the pipe bodies are arranged while keeping a predetermined space D. Then, the excavated groove G is totally refilled and earth-covered including the space D. In another method, when pipe bodies P of a plurality of parallel rows/stacks are arranged in the groove G, the spacer S is arranged between the rows of the pipe bodies P and P at an interval of adequate length in the pipe longitudinal direction, the predetermined space D is kept, and the entire excavated groove G is re-filled and covered including the space D. COPYRIGHT: (C)2004,JPO</abstract><edition>7</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2004084766A
source esp@cenet
subjects BLASTING
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
ENGINEERING ELEMENTS AND UNITS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
GENERATION
HEATING
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINEDOPTICAL AND ELECTRIC CABLES OR LINES
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MEANS FOR THERMAL INSULATION IN GENERAL
MECHANICAL ENGINEERING
PIPES
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
THERMAL INSULATION IN GENERAL
WEAPONS
title METHOD FOR BURYING UNDERGROUND PIPE BODY
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T23%3A34%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FUKUI%20KOKI&rft.date=2004-03-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2004084766A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true